Well ID: 34-059-24376 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Warren Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001036 | |
Farm/Lease Name: WHEELER UNIT | |
License Status: Producing | |
License Date: 2014-07-24 | |
Spud Date: 2014-09-06 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2014-12-07 | |
Well Total Depth: 15921.00 ft | |
Configuration: Horizontal | |
Latitude: 40.030000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-05-22 | Proposed Formations:TRENTON, Issued Date:5/22/2014, Expired Date:5/21/2016 12:00:00 PM, Drilling unit acres:691.049, Proposed Well Type:ST, Proposed Well Class:STRT |
Construction Permit Expires | 2014-07-23 | |
Correction to Well | 2014-12-05 | CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR. |
Reached Total Depth | 2014-12-07 | |
Correction to Well | 2016-01-08 | change in surface/target/takepoint per as-drilled plat-ALE |
Completion Report Received | 2016-12-14 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-14 | 9118 | 12961 | 0 |
9118 | 12961 | 0 | |
9118 | 12961 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/10/2016 | 07/31/2016 | 7983 | 11,979,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 87.3228 | 99,786,500.0 |
HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 | |
Hazardous and Non-Hazardous Ingredients | Acetic acid | 64-19-7 | 60 | 0.00338725 | 3871 | |||
Propargyl alcohol | 107-19-7 | 10 | 0.00005836 | 67 | ||||
Methanol | 67-56-1 | 60 | 0.000350161 | 401 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.000175081 | 201 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00003347 | 39 | ||||
Water | 7732-18-5 | 100 | 0.705266 | 805930 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.000200834 | 230 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.9655 | 13,673,400.0 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00564542 | 6452 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000175081 | 201 | ||||
Fatty acids, tall oil | Confidential | 30 | 0.000175081 | 201 | ||||
Glycerine | 56-81-5 | 7 | 0.00004686 | 54 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.10571 | 483191 | ||||
Olefins | Confidential | 5 | 0.00007003 | 82 | ||||
LD-7645W | Multichem | Additive | NA | NA | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION, HAI-OS
ACID INHIBITOR, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Additive, Corrosion Inhibitor, Proppant | NA | NA | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-07-20 | H2O | 0 | 234202 Gal | 303970 | Halliburton | 36 total perforations from 11320 feet to 11203 feet |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 297984 | 39706 | 109 |
2017 | ECLIPSE RESOURCES I LP | 813698 | 46597 | 363 |
2018 | ECLIPSE RESOURCES I LP | 407078 | 11148 | 362 |
2019 | ECLIPSE RESOURCES I LP | 80548 | 1712 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 9476 | 109 |
2017 | ECLIPSE RESOURCES I LP | Brine | 16137 | 363 |
2018 | ECLIPSE RESOURCES I LP | Brine | 7506 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1483 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1120165355 | 2019-9-4 0:00:0 | PW | No Violations | 0.30 |
-129911028 | 2019-1-28 0:00: | PW | No Violations | 0.20 |
-2037587257 | 2016-10-13 0:00 | PW | No Violations | 0.50 |
-2079031669 | 2016-12-12 0:00 | PW | No Violations | 0.50 |
-803782033 | 2020-6-4 0:00:0 | PW | No Violations | 1.00 |
0129911028 | 2019-01-28 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with the production tubing opened and the production casing valves closed. The 13.375-inch surface casing had 0 pounds per square inch, the 9.625-inch intermediate had 950 pounds per square inch, the 5.5-inch diameter production casing had 600 pounds per square inch, and the 2.875-inch diameter production tubing had 370 pounds per square inch. The production equipment consisted of five sand traps, five gas production units, a blow case, and one 400-barrel tank. The produced gas and fluid are separated and then transferred to the Borton CGF for sales. Identification was located at each well and on the tank. |
0546825856 | 2016-09-27 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 1860 pounds per square inches on the casing and 3290 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
0568067736 | 2016-07-20 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton Services frac stage 31 of 45 with a breakdown pressure of 8187 pounds per square inch, an average treating pressure of 8612 pounds per square inch, an average rate of 87.4 barrels per minute and a total of 303970 pounds of propant pumped. I completed walk around with Consultant Dustin Moore revealing proper secondary containment was in place and due to mechanical problems with the fuel skid remained down and the job was fueled by diesel instead of natural gas. |
1043246952 | 2015-04-17 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
1416774852 | 2014-11-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed H&P Drilling Rig #531 drilled a 17.5 inch diameter hole to the depth of 1385 feet and Franks Casing crew ran 1344 feet of 13.375 inch 54.5#/ft. J-55 Surface Casing washing the last joint down. Halliburton was on site and gained circulation and pumped 10bbls of gel, 10bbls of fresh water and cemented casing with1240 sacks of Halcem cement 15.6ppg, 1.21cuft/sk cement, verified by mud scales. Displaced cement with 201bbls of fresh water had good cement returns of 40bbls, plug was landed at 550psi and pressured to 1050psi for 5 minutes and the floats held. |
1468429543 | 2016-07-13 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton Services frac stage 11 of 45 with a breakdown pressure of 7886 pounds per square inch, an average treating pressure of 8708 pounds per square inch, an average rate of 74.9 barrels per minute and a total of 299680 pounds of propant pumped. I completed walk around with Consultant Gilbert Aguilar revealing proper secondary containment was in place and due to mechanical problems with the fuel skid the job was fueled by diesel instead of natural gas. |
1472825533 | 2016-09-02 | Completion Testing | No Violations | On the day of my inspection I witnessed that Deep Well Services Rig # 4 (DWS) was currently drilling out the 25th plug at 12828 feet. I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and maintained. |
1788917248 | 2016-11-28 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2150 pounds per square inches on the casing and 2240 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1958405975 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. Gauges present read 1025 pounds per square inches on the casing and 715 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater and a GP unit. Also present a 400 barrel purge tank within containment and a blow case skid both shared with the 9H, 7H, 5H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. Field testing of the sediment pond revealed a pH of 7 and chloride levels of 46 parts per million. |
2037587257 | 2016-10-13 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2130 pounds per square inches on the casing and 2810 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
2079031669 | 2016-12-12 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2590 pounds per square inches on the casing and 2140 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
546825856 | 2016-9-27 0:00: | PW | No Violations | 0.50 |
568067736 | 2016-7-20 0:00: | CT | No Violations | 5.00 |