If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24382 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.05,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Oxford Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001003 | |
Farm/Lease Name: BORTON C UNIT | |
License Status: Producing | |
License Date: 2014-07-24 | |
Spud Date: 2014-06-01 | |
Spud Drilling Contractor: PRECISION DRILLING | |
Final Drill Date: 2016-11-10 | |
Well Total Depth: 16136.00 ft | |
Configuration: Horizontal | |
Latitude: 40.050000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-05-23 | Proposed Formations:TRENTON, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:363.936, Proposed Well Type:ST, Proposed Well Class:STRT |
Construction Permit Expires | 2014-07-23 | |
Correction to Well | 2014-12-05 | CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR. |
Reached Total Depth | 2016-11-10 | |
Completion Report Received | 2016-12-27 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-27 | 8293 | 15993 | 0 |
8293 | 15993 | 0 | |
8293 | 15993 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/20/2016 | 07/05/2016 | 8010 | 14,976,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 |
Hazardous and Non-Hazardous Ingredients | Ethanol | 64-17-5 | 60 | 0.000326665 | 461 | |||
Hydrochloric acid | 7647-01-0 | 15 | 0.0972 | 136935 | ||||
Fatty acids, tall oil | Confidential | 30 | 0.000160943 | 227 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000544 | 8 | ||||
Naphthalene | 91-20-3 | 5 | 0.00002722 | 39 | ||||
Methanol | 67-56-1 | 60 | 0.000321886 | 454 | ||||
Water | 7732-18-5 | 100 | 0.64797 | 912897 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.8003 | 15,216,100.0 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000160943 | 227 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005365 | 76 | ||||
Oxyalkylated phenolic resin | Confidential | 30 | 0.000217776 | 308 | ||||
Acetic acid | 64-19-7 | 60 | 0.00155687 | 2194 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00259478 | 3656 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00002722 | 39 | ||||
Olefins | Confidential | 5 | 0.00006438 | 92 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.000163332 | 231 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.000160943 | 227 | ||||
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.548 | 124,752,000.0 | |
FE-1A ACIDIZING COMPOSITION, HAI-OS
ACID INHIBITOR, LOSURF-300D, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Additive, Corrosion Inhibitor, Non-ionic Surfactant, Proppant | NA | NA | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-06-20 | H2O | 15 | 287644 Gal | 291269 | Halliburton | STAGE 1/51
48 SHOTS STAGES 2-51 |
2016-07-05 | H2O | 15 | 262308 Gal | 299916 | Halliburton | STAGE 51/51
72 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 462505 | 56515 | 147 |
2017 | ECLIPSE RESOURCES I LP | 1318252 | 73833 | 364 |
2018 | ECLIPSE RESOURCES I LP | 745949 | 10238 | 362 |
2019 | ECLIPSE RESOURCES I LP | 138117 | 1356 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 6634 | 147 |
2017 | ECLIPSE RESOURCES I LP | Brine | 17330 | 364 |
2018 | ECLIPSE RESOURCES I LP | Brine | 10917 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1899 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1192435176 | 2014-11-3 0:00: | DD | No Violations | 1.50 |
-1302346550 | 2019-9-4 0:00:0 | PW | No Violations | 0.30 |
-34172266 | 2016-11-28 0:00 | PW | No Violations | 0.50 |
-395182891 | 2016-7-14 0:00: | CT | No Violations | 3.00 |
0034172266 | 2016-11-28 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 2650 pounds per square inch on the tubing and 2780 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
0235334022 | 2016-08-15 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 3660 pounds per square inch on the tubing and 3720 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
0395182891 | 2016-07-14 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well Services Rig #8 was drilling out the twenty ninth frac plug at 12490 feet and Tetra Services was onsite controlling well pressure. I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and gas production units were being set. |
0582741081 | 2015-04-16 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
1192435176 | 2014-11-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Precision Drilling Rig #110 had ran and set their 2nd intermediate casing and was drilling their lateral with an 8.5 inch diameter bit at a depth of 9950 feet. Completed walk around with Company Man Jeb Dobbs revealing no violations. |
1405276504 | 2014-07-13 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 24inch diameter hole to the depth of 439 feet and ran 439 feet of 18.625 inch 87.5#/ft. J-55 casing washing down the last joint. Halliburton was on site gained circulation with fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 400 sacks of Class A cement and displaced cement with 121bbls of fresh water. Had good cement returns of 20bbls and cement stayed at surface. |
1428323217 | 2019-11-27 0:00 | PW | No Violations | 0.20 |
1470098993 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 1135 pounds per square inch on the tubing and 1565 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1549059842 | 2016-06-03 | Completion Testing | No Violations | On the day of my inspection I witnessed that frac stacks and secondary containment in place with frac operations planned to begin on June 9th. Completed walk around with Eclipse Superintendent Alex Pottmeyer who stated there are 51 stages planned for the well. |
198320766 | 2020-6-4 0:00:0 | PW | No Violations | 1.00 |
235334022 | 2016-8-15 0:00: | PW | No Violations | 0.50 |
582741081 | 2015-4-16 0:00: | PL | No Violations | 0.50 |
641659100 | 2020-9-3 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]