If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24387 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.05,"lon":-81.26,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Oxford Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001064 | |
Farm/Lease Name: WEEKENDER | |
License Status: Producing | |
License Date: 2014-07-11 | |
Spud Date: 2014-06-23 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-10-16 | |
Well Total Depth: 15955.00 ft | |
Configuration: Horizontal | |
Latitude: 40.050000 | |
Longitude: -81.260000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-06-06 | Proposed Formations:TRENTON, Issued Date:6/6/2014, Expired Date:6/5/2016 12:00:00 PM, Drilling unit acres:650.448, Proposed Well Type:ST, Proposed Well Class:STRT |
Construction Permit Expires | 2014-07-10 | |
Reached Total Depth | 2014-10-16 | |
Correction to Well | 2014-12-05 | CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR. |
Correction to Well | 2015-12-11 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Completion Report Received | 2016-03-22 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-08-24 | 9095 | 15357 | 0 |
9095 | 15357 | 0 | |
9095 | 15357 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/08/2015 | 06/08/2015 | 8123 | 9,079,310.0 | 109250 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.94 | 76,265,900.0 |
HP 2220, MB 7530 | One AquaSource | Biocide, Scale Inhibitor | NA | NA | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 | |
BA-40L BUFFERING AGENT, BC-140,
FR-76, OPTIFLO-HTE, OPTIFLO-III DELAYED RELEASE BREAKER, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK, SP BREAKER, WG-36 GELLING AGENT |
Halliburton | Breaker, Buffer, Crosslinker, Friction Reducer, Gelling Agent, Proppant | NA | NA | 0 | 0 | 0 | |
Hazardous and Non-Hazardous Ingredients | Crystalline silica, quartz | 14808-60-7 | 100 | 9.70335 | 8,320,610.0 | |||
Hydrochloric acid | 7647-01-0 | 60 | 0.663342 | 568816 | ||||
Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex |
121888-68-4 | 5 | 0.0038775 | 3325 | ||||
Dazomet | 533-74-4 | 24 | 0.00379866 | 3258 | ||||
Silica gel | 112926-00-8 | 1 | 0.0007755 | 665 | ||||
Water | 7732-18-5 | 100 | 1.18201 | 1,013,580.0 | ||||
Walnut hulls | NA | 100 | 0.00148688 | 1275 | ||||
Acrylamide acrylate polymer | Confidential | 30 | 0.0336385 | 28845 | ||||
Enzyme | Confidential | 5 | 0.00007434 | 64 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0336385 | 28845 | ||||
Cured acrylic resin | Confidential | 30 | 0.000487173 | 419 | ||||
Surfactant mixture | Confidential | 1 | 0.001551 | 1330 | ||||
Sodium chloride | 7647-14-5 | 30 | 0.0336385 | 28845 | ||||
Potassium carbonate | 584-08-7 | 60 | 0.00003487 | 30 | ||||
Sodium Hydroxide | 1310-73-2 | 4 | 0.000633109 | 543 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00239184 | 2051 | ||||
Monoethanolamine borate | 26038-87-9 | 60 | 0.00913121 | 7830 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00456561 | 3915 | ||||
Crystalline Silica, Quartz | 14808-60-7 | 0.1 | 0.00007755 | 67 | ||||
Guar gum | 9000-30-0 | 100 | 0.07755 | 66499 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000239 | 3 | ||||
C.I. Pigment Red 5 | 6410-41-9 | 1 | 0.00001487 | 13 | ||||
Ammonium persulfate | 7727-54-0 | 100 | 0.00008746 | 75 | ||||
Organic phosphate | 71050-62-9 | 25 | 0.00669071 | 5738 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-05-20 | H2O | 15 | 95205 Gal | 0 | Halliburton | STAGE 1/29
48 SHOTS STAGES 2-28 SEE IMAGES |
2015-06-06 | H2O | 8 | 255632 Gal | 325769 | Halliburton | STAGE 29/29
45 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ECLIPSE RESOURCES I LP | 288351 | 31073 | 95 |
2016 | ECLIPSE RESOURCES I LP | 628595 | 35888 | 360 |
2017 | ECLIPSE RESOURCES I LP | 324153 | 16055 | 363 |
2018 | ECLIPSE RESOURCES I LP | 256145 | 6830 | 362 |
2019 | ECLIPSE RESOURCES I LP | 47225 | 1227 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ECLIPSE RESOURCES I LP | Brine | 4803 | 95 |
2016 | ECLIPSE RESOURCES I LP | Brine | 18301 | 360 |
2017 | ECLIPSE RESOURCES I LP | Brine | 6184 | 363 |
2018 | ECLIPSE RESOURCES I LP | Brine | 3381 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1033 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1233829668 | 2019-11-27 0:00 | PW | No Violations | 0.10 |
-1589846777 | 2014-9-2 0:00:0 | DD | No Violations | 1.50 |
-351032042 | 2020-9-3 0:00:0 | PW | No Violations | 1.00 |
-50546116 | 2014-7-3 0:00:0 | DD | No Violations | |
-790557980 | 2014-12-15 0:00 | DD | No Violations | 1.00 |
0050546116 | 2014-07-03 | Drill / Deepen / Reopen | No Violations | I accompanied Doug Bennett on the inspection of this well today. |
0178291110 | 2015-04-16 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
0620266560 | 2015-07-16 | Completion Testing | No Violations | On the day of my inspection I witnessed that flowback testing was completed and production equipment including a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment was present and construction was 90% completed. The well was equipped with Sweco wellheads and production trees with valves in the closed position and proper identification present. Fluids and gas will be separated and transferred to the Borton CGF for further processing when the well is opened and online. |
0790557980 | 2014-12-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed that toe prep was completed and awaiting frac crew. Annular pressure on the surface casing was 120psi and 0psi on the intermediate casing. |
0828253773 | 2015-03-27 | Completion Testing | No Violations | On the day of my inspection I witnessed the cellar fluid level was 8 inches from the surface with a light sheen present and mouse holes were not plugged and full of water. Field testing water reveled chlorides of 96ppm and a pH of 6. I placed call to Matt Amos of Eclipse and he stated that a water truck would be out immediately to pump the cellars and mouse hole. He also state that he would coordinate with Kyle Bradford to get the mouse holes plugged and would notify ODNR prior to cementing. |
0882082541 | 2015-12-23 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Jim Nicholson I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 1950psi on the tubing and 1750psi on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF. |
1060132419 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with a plunger lift system with valves in the open position with 360 pounds per square inch on the tubing and 660 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF. |
1133669590 | 2016-06-13 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 820psi on the tubing and 1000psi on the casing. |
1434638768 | 2015-06-18 | Completion Testing | No Violations | On the day of my inspection I witnessed that Deep Well Service completion rig was running 2.875 inch 6.7#/ft L-80 tubing at 2800 feet setting it at 8871 feet and Tetra Services onsite controlling well pressure. Completed walk around with Consultant Will Ochampaugh and Eclipse Facilities Foreman Greg Offenberger revealing proper containment was present and production facilities were being installed. |
1589846777 | 2014-09-02 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson UTI Drilling Rig #328 had plugged back and was circulating on top of plugs and preparing to trip out and pick up BHA and trip back in to begin their curve. Site inspection revealed no violations. |
178291110 | 2015-4-16 0:00: | PL | No Violations | 0.50 |
1862546840 | 2014-06-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection, I witnessed Universal Well Service break circulation with fresh water then displace four hundred five sacks of Type-1 cement with a weight of 15.6 and a yield of 1.21 down the well bore to a depth of one hundred foot, I witnessed twenty two barrels of cement returns back to the cellar. |
1972336675 | 2016-11-28 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 530 pounds per square inch on the tubing and 900 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF. |
2039410425 | 2014-07-30 | Drill / Deepen / Reopen | No Violations | On the day of my inspection accompanied by ODNR Inspector Justin Smith, I witnessed that Alpha Hunter Drilling Rig #9 was drilling a 17.5 inch diameter hole at a depth of 1533 feet with a planned td of 1750 feet and 13.375 inch casing to follow. |
2054380445 | 2014-10-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson UTI Drilling Rig #328 had reached a total depth 15973 feet and running 5.5 inch production casing with cementing to follow. |
361824255 | 2020-6-17 0:00: | PW | No Violations | 1.00 |
620266560 | 2015-7-16 0:00: | CT | No Violations | 0.50 |
828253773 | 2015-3-27 0:00: | CT | No Violations | 1.50 |
882082541 | 2015-12-23 0:00 | PW | No Violations | 0.50 |
For data sources see[10]