34-059-24393

Well Details

Well ID: 34-059-24393
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001003
Farm/Lease Name: BORTON B UNIT
License Status: Producing
License Date: 2014-06-19
Spud Date: 2014-06-17
Spud Drilling Contractor: PRECISION DRILLING
Final Drill Date: 2014-11-24
Well Total Depth: 16817.00 ft
Configuration: Horizontal
Latitude: 40.050000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-19 Proposed Formations:POINT PLEASANT, Issued Date:6/19/2014, Expired Date:6/18/2016 12:00:00 PM, Drilling unit acres:169.4, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2014-11-24
Correction to Well 2015-07-31 CHANGE IN UNIT SIZE.
Correction to Well 2015-08-28 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2016-06-18
Completion Report Received 2016-12-27
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-01-19 8258 16675 0
8258 16675 0
8258 16675 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/07/2016 06/27/2016 8024 15,969,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Base Fluid NA NA 0 0 0
Hazardous and Non-Hazardous Ingredients Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000166321 249
Fatty acids, tall oil Confidential 30 0.000166321 249
Water 7732-18-5 100 0.669622 1,002,400.0
Acetic acid 64-19-7 60 0.00160889 2409
Ethanol 64-17-5 60 0.00033758 506
1,2,4 Trimethylbenzene 95-63-6 1 0.00000563 9
Propargyl alcohol 107-19-7 10 0.00005544 83
Hydrochloric acid 7647-01-0 15 0.10044 150360
Naphthalene 91-20-3 5 0.00002813 43
Methanol 67-56-1 60 0.000332642 498
Oxyalkylated phenolic resin Confidential 30 0.000225053 338
Heavy aromatic petroleum naphtha 64742-94-5 30 0.00016879 253
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00002813 43
Acetic anhydride 108-24-7 100 0.00268149 4015
Crystalline silica, quartz 14808-60-7 100 10.3556 15,502,000.0
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.000166321 249
Olefins Confidential 5 0.00006653 102
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 88.971 133,186,000.0
FE-1A ACIDIZING COMPOSITION, HAI-OS

ACID INHIBITOR, LOSURF-300D, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK

Halliburton Additive, Corrosion Inhibitor, Non-ionic Surfactant, Proppant NA NA 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-06-09 H2O 15 329532 Gal 237197 Halliburton STAGE 1/56

72 SHOTS STAGES 2-55 SEE IMAGES

2016-06-27 H2O 15 289329 Gal 278172 Halliburton STAGE 56/56

36 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP 428108 49911 149
2017 ECLIPSE RESOURCES I LP 1241991 63672 364
2018 ECLIPSE RESOURCES I LP 631562 8121 362
2019 ECLIPSE RESOURCES I LP 116293 1035 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP Brine 4810 149
2017 ECLIPSE RESOURCES I LP Brine 16408 364
2018 ECLIPSE RESOURCES I LP Brine 7685 362
2019 ECLIPSE RESOURCES I LP Brine 1407 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1051459970 2019-11-27 0:00 PW No Violations 0.10
-1395785532 2016-6-22 0:00: CT No Violations 2.50
-1422375159 2016-11-28 0:00 PW No Violations 0.50
-1674393765 2016-6-3 0:00:0 CT No Violations 0.50
-1894664563 2019-9-4 0:00:0 PW No Violations 0.30
-2006105049 2020-6-4 0:00:0 PW No Violations 1.00
-300302407 2016-8-15 0:00: PW No Violations 0.50
-417898457 2020-9-3 0:00:0 PW No Violations 1.00
0300302407 2016-08-15 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 3590 pounds per square inch on the tubing and 3725 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
0597290168 2015-04-16 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
1395785532 2016-06-22 Completion Testing No Violations On the day of my inspection I witnessed that frac operations have been suspended since yesterday after stage 33 of 56 was completed as they are waiting on water. Lines are being installed from the Andy Yoder impoundment with recommencing of frac operations this evening. Completed walk around with Consultant Gilbert Augilar revealing proper secondary containment was in place.
1415627727 2014-11-10 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Precision Drilling Rig #110 had ran and set their production casing on 34059243820000 Borton 6H and successfully skidded the rig to the 4H. Completed walk around with Company Man Ryan Bartholomew revealing no violations.
1422375159 2016-11-28 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 2540 pounds per square inch on the tubing and 2700 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
1674393765 2016-06-03 Completion Testing No Violations On the day of my inspection I witnessed that frac stacks and secondary containment in place with frac operations planned to begin on June 9th. Completed walk around with Eclipse Superintendent Alex Pottmeyer who stated there are 56 stages planned for the well.
1851581598 2017-06-07 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 1070 pounds per square inch on the tubing and 1300 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
597290168 2015-4-16 0:00: PL No Violations 0.50

For data sources see[10]