If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24412 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.08,"lon":-81.26,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Oxford Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001087 | |
Farm/Lease Name: ABE TROYER | |
License Status: Producing | |
License Date: 2014-08-08 | |
Spud Date: 2014-09-25 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-01-12 | |
Well Total Depth: 13928.00 ft | |
Configuration: Horizontal | |
Latitude: 40.080000 | |
Longitude: -81.260000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-08-08 | Proposed Formations:POINT PLEASANT, Issued Date:8/8/2014, Expired Date:8/7/2016 12:00:00 PM, Drilling unit acres:698.607, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2015-01-12 | |
Construction Permit Expires | 2016-08-07 | |
Completion Report Received | 2017-05-23 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-05-30 | 7945 | 8027 | 36 |
2017-05-30 | 13617 | 13787 | 48 |
13617 | 13787 | 48 | |
7945 | 8027 | 36 | |
7945 | 8027 | 36 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/05/2016 | 10/28/2016 | 7589 | 12,020,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
SAND-COMMON WHITE-100 MESH, SSA-2 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Acetic acid | 64-19-7 | 60 | 0.00151121 | 1722 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00002984 | 34 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005266 | 60 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.000181661 | 207 | ||||
Methanol | 67-56-1 | 60 | 0.000312421 | 356 | ||||
Olefins | Proprietary | 5 | 0.00006319 | 72 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000156211 | 178 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00251692 | 2868 | ||||
Ethylene oxide | 75-21-8 | 0.01 | 0.00000088 | 1 | ||||
Glycerine | 56-81-5 | 5 | 0.00002984 | 34 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000156211 | 178 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.4471 | 13,043,800.0 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.10173 | 115920 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000156211 | 178 | ||||
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.8711 | 100,128,000.0 | |
HYDROCHLORIC ACID - 35% | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.678805 | 773489 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1225-15 | Halliburton | Surfacant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-10-05 | H2O | 15 | 400190 Gal | 69550 | Halliburton | STAGE 1/39
STAGES 2-38 SEE IMAGES |
2016-10-27 | H2O | 15 | 537309 Gal | 361620 | Halliburton | STAGE 39
STAGES 2-38 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | 830836 | 105823 | 344 |
2018 | ECLIPSE RESOURCES I LP | 512731 | 26061 | 362 |
2019 | ECLIPSE RESOURCES I LP | 86276 | 3230 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | Brine | 22168 | 344 |
2018 | ECLIPSE RESOURCES I LP | Brine | 9461 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1420 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1924378085 | 2019-4-25 0:00: | PW | No Violations | 0.20 |
-20620442 | 2020-7-10 0:00: | PW | No Violations | 1.00 |
-208047839 | 2015-4-9 0:00:0 | PL | No Violations | 0.50 |
-226010537 | 2017-6-6 0:00:0 | PW | No Violations | 0.20 |
-34081787 | 2017-2-7 0:00:0 | PW | No Violations | 0.20 |
-365039293 | 2018-10-4 0:00: | PW | No Violations | 0.10 |
0034081787 | 2017-02-07 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 3075 pounds per square inch on the casing and 2920 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 6H, 8H and 10H. |
0208047839 | 2015-04-09 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
0226010537 | 2017-06-06 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1810 pounds per square inch on the casing and 2075 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 6H, 8H and 10H. |
0365039293 | 2018-10-04 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of eight 400-barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one combustor. Identification was located on the well. |
0750862993 | 2016-10-24 | Completion Testing | No Violations | On the day of my inspection I witnessed Nine Wireline was onsite to plug and perforate stage 18 of 39. Tools were pumped down with 100 barrels of produced water at 14 barrels per minute with 5600 pounds per square inch. Nine Wireline successfully set the plug at 11202 feet and perforated the casing with 36 shots from 11175 feet to 11075 feet. |
0804825089 | 2017-09-11 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1380 pounds per square inch on the casing and 1060 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 6H, 8H and 10H. |
1010349199 | 2019-8-13 0:00: | PW | No Violations | 0.20 |
1019255357 | 2019-8-13 0:00: | PW | No Violations | 0.50 |
1131465152 | 2016-11-10 | Completion Testing | No Violations | On the day of my inspection I witnessed the drill out operations were completed as Deep Well Services Rig #4 was rigging down preparing to move off location. I completed walk around with Consultant Cristo Giannareas revealing that secondary containment was being repaired and replaced by Grady Rentals along with cleaning of location. Halliburton Services are scheduled to move back in to complete the frac operations of the 8H and 10H next week. |
1420568341 | 2014-12-30 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the 13.375 surface casing. Halliburton has rigged up there equipment to cement the well. They used 1230sks of Halcem system cement on the well. The cement job was a success. We received 15bbls of cement back to surface. |
1531240169 | 2018-07-10 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one flare. Identification was located on the well. |
1624693713 | 2017-01-10 | Completion Testing | No Violations | The well was equipped with a plunger lift system with valves in the closed position with annular pressure monitoring in place. Tetra Technologies was onsite setting flowback equipment with flowback to begin on Friday. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 6H, 8H and 10H. I met with Consultant Cristo Giannareas and completed walk around revealing installation of production equipment was on going. |
1914308213 | 2016-11-04 | Completion Testing | No Violations | On the day of my inspection I witnessed that Deep Well Services Rig # 4 (DWS) was tripping in the wellbore preparing to drill out the kill plug set at 7865 feet. Upon completion DWS will drill out remaining frac plugs and run 2.375 inch production tubing. I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and maintained. |
1924378085 | 2019-04-25 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of eight 400-barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one combustor. Identification was located on the well. Upon entering the access road, a slip was noticed developing on the left side of the access road at the point of entry and an additional slip had developed on the stack pile. I made ODNR Engineer Mark Atkinson aware of my findings. |
1936952749 | 2019-05-20 | Production Wells | No Violations | The purpose of my inspection was a status check. On 4/25/2019 inspection found two slips have developed along the access road and on the topsoil stockpile. I contacted ODNR horizontal well pad Engineer Mark Atkinson and made him aware of the problem areas. During my inspection today the slips remain but have not increased in severability. The current slips will not effect pad stability and performance. |
750862993 | 2016-10-24 0:00 | CT | No Violations | 1.50 |
804825089 | 2017-9-11 0:00: | PW | No Violations | 0.50 |
For data sources see[10]