If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24424 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.99,"lon":-81.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wills Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001130 | |
Farm/Lease Name: OUTLAW B | |
License Status: Producing | |
License Date: 2017-06-26 | |
Spud Date: 2017-08-10 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-08-30 | |
Well Total Depth: 27788.00 ft | |
Configuration: Horizontal | |
Latitude: 39.990000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-17 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/17/2014, Expired Date:9/16/2016 12:00:00 PM, Drilling unit acres:438.505, Proposed Well Type:OG, Proposed Well Class: |
Correction to Well | 2014-10-17 | CORRECTION TO CASING PROGRAM. |
Correction to Well | 2014-10-26 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES, COORDINATES AND ELEVATION). |
Correction to Well | 2016-01-08 | CHANGE IN DRILLING UNIT. CORRECTIONS FOR TARGET AND TAKE POINT. |
APP | 2016-12-28 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/28/2016, Expired Date:12/28/2018 12:00:00 PM, Drilling unit acres:438.505, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2017-06-26 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/26/2017, Expired Date:6/26/2019 12:00:00 PM, Drilling unit acres:695.132, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-08-30 | |
Correction to Well | 2017-12-22 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-10-15 | |
Record Last Modified | 2018-10-19 | |
Construction Permit Expires | 2019-06-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-18 | 7944 | 8058 | 0 |
2018-10-18 | 27499 | 27604 | 0 |
27499 | 27604 | 0 | |
7944 | 8058 | 0 | |
7944 | 8058 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/19/2018 | 07/05/2018 | 7643 | 37,931,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.74603 | 2,659,770.0 |
MB-7532 | OneAqua Source | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-9601 | OneAqua Source | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
MB-7530 | OneAqua Source | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 8.18503 | 29,181,500.0 | |
Water | 7732-18-5 | 100 | 81.1458 | 289,304,000.0 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000570 | 21 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005612 | 201 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000168351 | 601 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.000171077 | 610 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000168351 | 601 | ||||
Olefins | Proprietary | 5 | 0.00006734 | 244 | ||||
Ethanol | 64-17-5 | 60 | 0.000342155 | 1220 | ||||
Sodium Hydroxide | 1310-73-2 | 4 | 0.00001401 | 50 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.000228103 | 814 | ||||
Naphthalene | 91-20-3 | 5 | 0.00002851 | 102 | ||||
Dazomet | 533-74-4 | 24 | 0.00008405 | 300 | ||||
Ammonium Persulfate | 7727-54-0 | 95 | 0.00193985 | 6917 | ||||
Tetrahydro-3.5-dimethyl-2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24 | 0.00545042 | 19432 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 45 | 0.050055 | 178458 | ||||
Sodium hydroxide | 1310-73-2 | 11.25 | 0.00255488 | 9109 | ||||
Citric acid | 77-92-9 | 60 | 0.00234692 | 8368 | ||||
Poly(oxy-1,2-ethanediyl), a-tridecyl-w-hydroxy-, branched | 69011-36-5 | 5 | 0.00556166 | 19829 | ||||
Proprietary blend of acrylic and carboxylate polymers | Proprietary | 20 | 0.0024604 | 8772 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 9.77177 | 34,838,600.0 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000168351 | 601 | ||||
Methanol | 67-56-1 | 60 | 0.00365825 | 13044 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.111552 | 397710 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00002851 | 102 | ||||
HP-2814 | OneAqua Source | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2220 | OneAqua Source | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-30/50, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-18 | H2O | 15 | 290473 Gal | 19000 | Halliburton | STAGE 1/131
STAGES 2-130 SEE IMAGES |
2018-07-05 | H2O | 15 | 262042 Gal | 291252 | Halliburton | STAGE 131/131
STAGES 2-130 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | 688524 | 242919 | 135 |
2019 | ECLIPSE RESOURCES I LP | 470332 | 129188 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | Brine | 62130 | 135 |
2019 | ECLIPSE RESOURCES I LP | Brine | 17801 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1018135132 | 2018-9-10 0:00: | PW | No Violations | 0.20 |
-612080926 | 2015-5-5 0:00:0 | PL | No Violations | 1.00 |
-649975641 | 2019-10-9 0:00: | PW | No Violations | 0.20 |
-934341543 | 2017-7-10 0:00: | PW | No Violations | 0.50 |
0502852787 | 2019-01-31 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. A gauge was present on the 9.625-inch diameter intermediate casing reading 900 pounds per square inch and 0 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of five sand traps, five gas production units, three frac tanks, two 400-barrel tanks, and a triethylene glycol dehydration unit. Identification was located on the tank battery. Produced water was being separated here and stored on pad. The produced oil and produced natural gas were being transported to the Outlaw pad for gathering via pipeline. |
0612080926 | 2015-05-05 | Preliminary Restoration | No Violations | On the day of my inspection I met with Eclipse Construction Supervisor Doug Rennicker and EHS Field Rep Rocky King to review slip repairs and re-seeding has been completed and the site passed preliminary restoration according to ORC 1509.072A. |
0701310103 | 2016-07-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that there is no current activity and the drilling permit expires on 9/16/16. The last activity was on 11/16/14 with 24 inch conductor pipe being set at 100 feet. A slip is developing along the eastside of the access road with a section of the access road eroding. |
0934341543 | 2017-07-10 | Production Wells | No Violations | On the day of my inspection I witnessed the air package and the mud tanks have been set with containment place in preparation for H&P Flex Rig #608 to arrive after drilling the lateral on the Fineran 2H. The cement has fallen on the mouse hole approximately 8 inches. I placed call to Eclipse Consultant Charlie Frazier who stated they will be re-grouted when the landing rings are installed on Wednesday. |
1018135132 | 2018-09-10 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. A gauge was present on the 9.625-inch diameter intermediate casing reading 1500 pounds per square inch and 0 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of five sand traps, five gas production units, three 500-barrel frac tanks, and two 400-barrel tanks. Roustabouts were on location assembling the triethylene glycol dehydration unit on the South East side of the pad beside the pipeline tie in. |
1023691374 | 2017-08-22 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that H&P Flex Rig #608 was drilling ahead in the lateral with an 8.5 inch diameter bit on 11.9 pound per gallon mud at 17612 feet with a planned total depth of 27818 feet. I completed walk around with Eclipse Consultant Billy Shafer. |
1502456284 | 2017-08-11 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that H&P Flex Rig #608 had drilled a 17.5 inch diameter hole to the depth of 1475 feet. Wyoming Casing Crew ran 552.66 feet of 13.375 inch 61 pound per foot. J-55 casing and 852.66 feet of 13.375 inch 54.5 pound per foot J-55 casing for a total of 1429.37 feet of 13.375 inch casing set at 4 feet above KB. KB height is 26.5 feet above ground level. Schlumberger was on site and loaded their lines with 5 barrels of fresh water and performed a low pressure test at 1000 pounds per square inch and a high pressure test at 3500 pounds per square inch. Schlumberger gained circulation with 220 barrels of fresh water, 25 barrels of gel and 10 barrels of fresh water. Schlumberger cemented casing with 1220 sacks of Class A cement 15.6 pounds per gallon, 1.21 cubic foot per sack cement with 3% D154 Extender, .2% D013 Retarder, .25 pound per sack D130 Flake, .3% B160A Dispersant and .4% B348 FLAC. Cement weight was verified by pressurized mud scales and displaced with 211.5 barrels of fresh water. Cement was circulated to surface with good returns of 61 barrels, plug was landed at 590 pounds per square inch and pressured to 1165 pounds per square inch for 5 minutes and the floats held with 1 barrel back. Mix water was tested revealing chlorides of <33 parts per million, pH 7 and 68 degrees. |
1616710050 | 2020-7-29 0:00: | PW | No Violations | 1.00 |
2018006061 | 2019-12-19 0:00 | PW | No Violations | 0.10 |
502852787 | 2019-1-31 0:00: | PW | No Violations | 0.20 |
701310103 | 2016-7-1 0:00:0 | DD | No Violations | 0.50 |
For data sources see[10]