34-059-24425

Well Details

Well ID: 34-059-24425
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Wills Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001130
Farm/Lease Name: OUTLAW A
License Status: Producing
License Date: 2017-06-26
Spud Date: 2014-11-13
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-09-21
Well Total Depth: 27852.00 ft
Configuration: Horizontal
Latitude: 39.990000
Longitude: -81.350000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-09-17 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/17/2014, Expired Date:9/16/2016 12:00:00 PM, Drilling unit acres:438.505, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2014-10-17 CORRECTION TO CASING PROGRAM.
Correction to Well 2016-01-08 CHANGE TO DRILLING UNIT. CORRECTIONS FOR TARGET AND TAKE POINT.
APP 2016-12-28 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/28/2016, Expired Date:12/28/2018 12:00:00 PM, Drilling unit acres:438.505, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-06-26 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/26/2017, Expired Date:6/26/2019 12:00:00 PM, Drilling unit acres:364.837, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-09-21 UPDATED TARGET/TAKEPOINT, PREVIOUSLY ENTERED INCORRECTLY, WELL PERMIT ISSUED WITH CORRECT COORDINATES-ALE 07/10/2017
Correction to Well 2017-12-22 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-10-15 UPDATED TARGET/TAKEPOINT, PREVIOUSLY ENTERED INCORRECTLY, WELL PERMIT ISSUED WITH CORRECT COORDINATES-ALE 07/10/2017
Record Last Modified 2018-10-19 UPDATED TARGET/TAKEPOINT, PREVIOUSLY ENTERED INCORRECTLY, WELL PERMIT ISSUED WITH CORRECT COORDINATES-ALE 07/10/2017
Construction Permit Expires 2019-06-26 UPDATED TARGET/TAKEPOINT, PREVIOUSLY ENTERED INCORRECTLY, WELL PERMIT ISSUED WITH CORRECT COORDINATES-ALE 07/10/2017

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-18 8360 8474 0
2018-10-18 27579 27679 0
27579 27679 0
8360 8474 0
8360 8474 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/19/2018 06/26/2018 7638 33,294,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Organic phosphate copolymer 71050-62-9 0 0 0
1,2,4 Trimethylbenzene 95-63-6 1 0.00000606 19
Ammonium Persulfate 7727-54-0 0 0 0
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00003029 95
Oxyalkylated phenolic resin Proprietary 30 0.000242298 760
Hydrochloric acid 7647-01-0 60 0.194679 609852
Distillate (petroleum, hydrotreated light) 64742-47-8 0 0 0
Methanol 67-56-1 60 0.000357655 1121
Tetrahydro-3, 5-dimethyl-2H-1,

5-thiadiazine-2-thione Tetrahydro-3, 5-dimethyl-2H-1, 5-thiadiazine-2-thione

533-74-4 0 0 0
Citric acid 77-92-9 60 0.00249297 7810
Ammonium chloride 12125-02-9 0 0 0
Modified thiourea polymer Proprietary 30 0.000178828 561
Tetrahydro-3, 5-dimethyl-2H-1, 5-thiadiazine-2-thione 533-74-4 0 0 0
Naphthalene 91-20-3 5 0.00003029 95
Crystalline silica, quartz 14808-60-7 100 10.2661 32,159,500.0
Olefins Proprietary 5 0.00007153 226
Ethanol 64-17-5 60 0.000363447 1139
Fatty acids, tall oil Proprietary 30 0.000178828 561
Sodium hydroxide 1310-73-2 0 0 0
Propargyl alcohol 107-19-7 10 0.00005961 187
NFIDB:Field Salt Water CAS Not Assigned 100 9.31541 29,181,500.0
Ethoxylated alcohols Proprietary 30 0.000178828 561
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000181724 570
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HP-2814 One AquaSource Friction Reducer Listed Below Listed Below 0 0 0
MB-7532 One AquaSource Biocide Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 79.9117 250,332,000.0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
MB-7530 One AquaSource Biocide Listed Below Listed Below 0 0 0
MURIATIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Produced Water Halliburton Base Fluid Listed Below Listed Below 0 0 29,181,600.0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
HP-9601 One AquaSource Additive Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.326958 1,024,230.0
HP-2220 One AquaSource Scale Inhibitor Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-06-25 H2O 15 244530 Gal 264005 Halliburton STAHE 125/125

STAGES 2-124 SEE IMAGES

2018-05-19 H2O 15 183368 Gal 9996 Halliburton STAGE 1/125

STAGES 2-124 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 734123 266953 135
2019 ECLIPSE RESOURCES I LP 487862 144640 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 55418 135
2019 ECLIPSE RESOURCES I LP Brine 17865 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1287673196 2015-5-5 0:00:0 PL No Violations 1.00
-1305881807 2015-4-1 0:00:0 DD No Violations 1.00
-1882675953 2018-9-10 0:00: PW No Violations 0.20
-685085320 2019-1-31 0:00: PW No Violations 0.20
-933488397 2017-7-10 0:00: DD No Violations 0.50
-941150372 2019-10-9 0:00: PW No Violations 0.20
0126885781 2017-09-12 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by ODNR Inspector Tom Thomas, I witnessed H&P Flex Rig #608 was drilling ahead in the lateral with an 8.5 inch diameter bit on 11.8 pound per gallon mud at 17662 feet with a planned total depth of 27865 feet. We met with Eclipse Consultant Billy Shafer and completed walk around.
0370010488 2018-07-13 Completion Testing No Violations The purpose of my inspection was a status check on drill out operations. During my inspection Deep Well Snubbing unit #10 was rigged up on location drilling out frac plugs at a measured depth of 18773 feet. A walk around inspection was completed with Eclipse Company Man. Annular pressure monitoring was present. Production equipment was being assembled on the East Side of the pad.
0517844844 2017-09-06 Casing String Witnessed No Violations On the day of my inspection I witnessed H&P Flex Rig #608 had reached total depth in the 12.25 inch intermediate section at 6955 feet. Wyoming Casing Crew had run 9.625 inch diameter 40 pound per foot P-110 casing set at 6910.58 feet. Casing was set 3.8 feet above KB which is 26.5 feet. DV tool was set at 1859.9 feet. Schlumberger was onsite to complete a 2--established circulation with 5.3 barrels of fresh water, pumped 24 barrels of MPE, then pumped 255 sacks of Surface Set 15.6 pounds per gallon 1.21 cubic foot per sack cement with .4% B348 FLAC, .55% DO13 Retarder, .02 gallon per sack D047 Antifoam, .12 gallon per sack D801 Retarder, .05 gallon per sack D145A Dispersant and .4% D202 Dispersant. Cement was displaced with 10 barrels of fresh water, 126 barrels of pound per gallon mud and 15 barrels of fresh water. Plug was landed at 250 pounds per square inch and pressured up to 1550 pounds per square inch to ensure DV tool had closed plug held
0685085320 2019-01-31 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. A gauge was present on the 9.625-inch diameter intermediate casing reading 1100 pounds per square inch and 0 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of five sand traps, five gas production units, three frac tanks, two 400-barrel tanks, and a triethylene glycol dehydration unit. Identification was located on the tank battery. Produced water was being separated here and stored on pad. The produced oil and produced natural gas were being transported to the Outlaw pad for gathering via pipeline.
0933488397 2017-07-10 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed the well formerly known as the Law 2H has been changed to the Outlaw A 1H. The air package and the mud tanks have been set with containment place in preparation for H&P Flex Rig #608 to arrive after drilling the lateral on the Fineran 2H.
1166163323 2020-7-29 0:00: PW No Violations 1.00
126885781 2017-9-12 0:00: DD No Violations 1.00
1287673196 2015-05-05 Preliminary Restoration No Violations On the day of my inspection I met with Eclipse Construction Supervisor Doug Rennicker and EHS Field Rep Rocky King to review slip repairs and re-seeding has been completed and the site passed preliminary restoration according to ORC 1509.072A.
1305881807 2015-04-01 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, I witnessed that the slip along the northeast side of the access road is being repaired with additional gabion baskets with one more layer and drainage to be completed by CTL by the end of the week.
1429189245 2015-04-16 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that the slip along the northeast side of the access road has been completed with seed and straw being applied. There are no plans to continue drilling operations at this time.
1705630005 2015-03-16 Drill / Deepen / Reopen No Violations On the day of my inspection I received a phone call from Eclipse Construction Supervisor Doug Rennicker stating that along the access road another slip has developed. Upon arrival I met with Doug and EHS Field Representative Mike Hartshorn, I witnessed that at the end of the existing gabion baskets another slip has developed on the Northeast side of the access road. CTL will be excavating and continuing with the gabion baskets toward the well pad and installing drainage.
1742018717 2016-07-01 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that there is no current activity and the drilling permit expires on 9/16/16. The last activity was on 11/14/14 with 24 inch conductor pipe being set at 100 feet. A slip is developing along the eastside of the access road with a section of the access road eroding.
177682922 2019-12-19 0:00 PW No Violations 0.10
1798863856 2017-09-12 Drill / Deepen / Reopen No Violations On the day of my inspection, I accompanied ODNR Inspector Doug Bennett and witnessed H&P Flex Rig #608 was drilling ahead in the lateral with an 8.5 inch diameter bit on 11.8 pound per gallon mud at 17662 feet with a planned total depth of 27865 feet. We met with Eclipse Consultant Billy Shafer and completed walk around.
1882675953 2018-09-10 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. A gauge was present on the 9.625-inch diameter intermediate casing reading 1300 pounds per square inch and 0 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of five sand traps, five gas production units, three 500-barrel frac tanks, and two 400-barrel tanks. Roustabouts were on location assembling the triethylene glycol dehydration unit on the South East side of the pad beside the pipeline tie in.
1943947675 2017-08-31 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed H&P Flex Rig #608 had completed the skid, connecting the flowline and preparing to pick up 17.5 inch diameter bottom hole assembly to re-spud well and drill the surface section. I met with Eclipse Consultant Matt Hayes reviewed the proposal for the surface section and completed walk around.
370010488 2018-7-13 0:00: CT No Violations 1.50
517844844 2017-9-6 0:00:0 CS No Violations 7.80