If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24450 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.01,"lon":-81.31,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Guernsey | |
| Municipality: Millwood Township | |
| Operator Name: EAP OHIO LLC | |
| Well Pad ID: US-OH-000788 | |
| Farm/Lease Name: HD MCCLAIN 28-9-7 | |
| License Status: Producing | |
| License Date: 2014-12-12 | |
| Spud Date: 2015-01-07 | |
| Spud Drilling Contractor: NOMAC DRILLING CORP | |
| Final Drill Date: 2015-05-19 | |
| Well Total Depth: 16204.00 ft | |
| Configuration: Horizontal | |
| Latitude: 40.010000 | |
| Longitude: -81.310000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-12-23 | Proposed Formations:POINT PLEASANT, Issued Date:12/23/2014, Expired Date:12/22/2016 12:00:00 PM, Drilling unit acres:461.43, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2015-05-19 | |
| Correction to Well | 2015-10-16 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
| Correction to Well | 2016-01-15 | UNIT CHANGE. CORRECTION TO TAKE POINT. |
| Completion Report Received | 2016-07-13 | |
| Construction Permit Expires | 2016-12-11 | |
| Record Last Modified | 2017-10-23 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2016-07-13 | 8455 | 16152 | 975 |
| 8455 | 16152 | 975 | |
| 8455 | 16152 | 975 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 11/30/2015 | 12/07/2015 | 7817 | 6,470,730.0 | 645450 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 11.8957 | 0 |
| PTLMP136 | PERFORMANCE TECHNOLOGIES | Acid | Water | 007732-18-5 | 85 | 0.37975 | 0 | |
| Hydrochloric Acid | 007647-01-0 | 15 | 0.06701 | 0 | ||||
| Northern White Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 18.1333 | 0 | |
| PTLBW112 | PERFORMANCE TECHNOLOGIES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00334 | 0 | |
| PTLAI161, PTLBW112, PTLCA104, PTLFR200, PTLGL341, PTLIS347 | PERFORMANCE TECHNOLOGIES | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent | Methanol (Methyl Alcohol) | 000067-56-1 | 0 | 0 | 0 | |
| Proprietary Substituted Fatty Acid Ester | TRADE SECRET | 0 | 0.01933 | 0 | ||||
| Proprietary Oxyalkylated Fatty Acid Derivative | TRADE SECRET | 0 | 0.01933 | 0 | ||||
| Proprietary Vinyl Copolymer | TRADE SECRET | 0 | 0.02097 | 0 | ||||
| Proprietary Fatty Amino Adduct | TRADE SECRET | 0 | 0.00036 | 0 | ||||
| Water | 007732-18-5 | 0 | 0.01969 | 0 | ||||
| Sodium Chloride | 007647-14-5 | 0 | 0.01933 | 0 | ||||
| Proprietary Polyether | TRADE SECRET | 0 | 0.00001000 | 0 | ||||
| Non-MSDS Components Not Provided by Supplier | NOT PROVIDED | 0 | 0 | 0 | ||||
| Proprietary Oxyalkylated Alcohol | TRADE SECRET | 0 | 0.00001000 | 0 | ||||
| Tetrasodium Ethylenediaminetetraacetate | 000064-02-8 | 0 | 0.01933 | 0 | ||||
| Sodium Erythorbate | 006381-77-7 | 0 | 0.00042 | 0 | ||||
| Proprietary Aliphatic Alcohol | TRADE SECRET | 0 | 0.01933 | 0 | ||||
| Copper Sulfate | 007758-98-7 | 0 | 0.00022 | 0 | ||||
| Chlorine Dioxide | TERRA SERVICES | Anti-Bacterial Agent | Chlorine Dioxide | 010049-04-4 | 100 | 0.01057 | 0 | |
| PTLAI161 | PERFORMANCE TECHNOLOGIES | Corrosion Inhibitor | Proprietary Aromatic Aldehyde | TRADE SECRET | 10 | 0.0001 | 0 | |
| Proprietary Ethoxylated Alcohol Blend | TRADE SECRET | 10 | 0.0001 | 0 | ||||
| Proprietary Fatty Alcohol Ethoxylate | TRADE SECRET | 30 | 0.00029 | 0 | ||||
| Proprietary Alkyl Amine Surfactant | TRADE SECRET | 5 | 0.00005000 | 0 | ||||
| Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 60 | 0.00058 | 0 | ||||
| PTLIS347 | PERFORMANCE TECHNOLOGIES | Iron Control Agent | No Hazardous Components | NONE | 0 | 0 | 0 | |
| 100 Mesh Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.61591 | 0 | |
| TS-30 | TERRA SERVICES | Scale Inhibitor | Proprietary Sodium Polycarboxylate | TRADE SECRET | 100 | 0.01694 | 0 | |
| Water | 007732-18-5 | 0 | 0.02085 | 0 | ||||
| PTLGL341 | PERFORMANCE TECHNOLOGIES | Gelling Agent | Solvent naptha, (petroleum) heavy aliphatic | 064742-96-7 | 65 | 0.12189 | 0 | |
| Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 68.4732 | 0 | |
| PTLFR200 | PERFORMANCE TECHNOLOGIES | Friction Reducer | Proprietary Oxyalkylated Alcohol | TRADE SECRET | 5 | 0.00088 | 0 | |
| Proprietary Aliphatic Hydrocarbon | TRADE SECRET | 30 | 0.00529 | 0 | ||||
| PTLCA104 | PERFORMANCE TECHNOLOGIES | Cross Linker | Sodium Hydroxide | 001310-73-2 | 30 | 0.01729 | 0 | |
| Sodium Tetraborate (Sodium Tetraborate Decahydrate) | 001303-96-4 | 30 | 0.01729 | 0 | ||||
| Proprietary Alkyl Alcohol | TRADE SECRET | 30 | 0.01729 | 0 | ||||
| PTLMP075 | PERFORMANCE TECHNOLOGIES | Acid | Water | 007732-18-5 | 93 | 0.1297 | 0 | |
| Hydrochloric Acid | 007647-01-0 | 8 | 0.01052 | 0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-12-07 | H2O | 0 | 3937 Bbl | 330000 | Performance Technologies | STAGE 39/39
25 SHOTS |
| 2015-11-30 | H2O | 0 | 4239 Bbl | 329540 | Performance Technologies | STAGE 1/39
25 SHOTS STAGES 2-38 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2016 | CHESAPEAKE EXPLORATION LLC | 776097 | 52941 | 229 |
| 2017 | CHESAPEAKE EXPLORATION LLC | 450320 | 16899 | 364 |
| 2018 | CHESAPEAKE EXPLORATION LLC | 155802 | 8315 | 346 |
| 2019 | CHESAPEAKE EXPLORATION LLC | 51702 | 2141 | 89 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2016 | CHESAPEAKE EXPLORATION LLC | Brine | 16161 | 229 |
| 2017 | CHESAPEAKE EXPLORATION LLC | Brine | 6407 | 364 |
| 2018 | CHESAPEAKE EXPLORATION LLC | Brine | 15987 | 346 |
| 2019 | CHESAPEAKE EXPLORATION LLC | Brine | 1431 | 89 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1002880646 | 2019-4-25 0:00: | PW | No Violations | 0.20 |
| -1175369386 | 2018-10-16 0:00 | PW | No Violations | 0.10 |
| -1205773724 | 2017-5-31 0:00: | PW | No Violations | 0.20 |
| -1364361870 | 2016-9-15 0:00: | PW | No Violations | 0.20 |
| -1616650037 | 2017-10-25 0:00 | PW | No Violations | 0.30 |
| -367732477 | 2015-5-21 0:00: | PL | No Violations | 1.00 |
| -393649587 | 2018-10-4 0:00: | PW | No Violations | 0.20 |
| -718951003 | 2016-3-1 0:00:0 | DD | No Violations | 0.50 |
| 0355661287 | 2015-01-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Express Energy Services had drilled a 30 inch diameter hole to the depth of 120 feet hitting water at 105 feet and ran 120 feet of 24 inch conductor pipe. Express gained circulation and cemented pipe with 230 sacks Class A cement with 2% CaCl and .5#/sk. of floseal. Displaced cement with 39bbls of fresh water and had good cement returns of 16bbls to surface. |
| 0367732477 | 2015-05-21 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed Nomac Drilling Rig #72 had completed the cementing of the 5.5 inch production casing and was walking the rig to the 34059244510000 HD McClain 28-9-7 10H with plans to re-spud well this evening. The site passed preliminary restoration according to ORC 1509.072A. |
| 0393649587 | 2018-10-04 | Production Wells | No Violations | During my inspection the well was equipped with a plunger lift system with production valves in the open position. The production equipment consisted of twelve 400-barrel tanks with one vapor recovery tower, eight sand traps, eight gas production units, two heated horizontal separators, and one combustor. Identification was present and production records were current. Stone Well Services Rig 15 was on location servicing the 1H. |
| 0569566111 | 2015-05-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Nomac Drilling Rig #72 drilled a 12.25 inch diameter hole to the depth of 2015 feet. Wyoming Casing Crew ran and set 2005 feet of 9.625 inch 40#/ft. J- |
| 0657107718 | 2018-05-03 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of twelve 400 barrel tanks with one vapor recovery tower, eight sand traps, eight gas production units, two heated horizontal separators, and one combustor. Identification was present and production records were current. A Chesapeake contractor was on location preforming maintenance on the gas production unit. |
| 0718951003 | 2016-03-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed the location was gated, fenced and unlocked with identification present. The production equipment included 12-400bbl tanks within containment, 2-NGL tanks, a vapor recovery tower, 2 low pressure horizontal heated separators, a vertical volume pot, an oil stabilizer unit and a gas combustor all shared with the 1H, 2H, 3H, 5H, 7H, 8H and 10H Also present for the well was a GP unit and sand traps planned for installation are currently not on site. The well was equipped with a frac valve in the closed position and drill out is scheduled to begin the week ending 3/26/16. |
| 1002880646 | 2019-04-25 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Gauges were present on all casing strings. The 13.375-inch diameter surface casing had 0 pounds per square inch, the 9.625-inch diameter intermediate casing had 260 pounds per square inch, the 5.5-inch diameter production casing had 400 pounds per square inch, and the 2.875-inch diameter production tubing had 180 pounds per square inch. The production equipment consisted of twelve 400-barrel tanks with one vapor recovery tower, eight sand traps, eight gas production units, two heated horizontal separators, and one combustor. Identification was present and production records were current. |
| 1175369386 | 2018-10-16 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of twelve 400-barrel tanks with one vapor recovery tower, eight sand traps, eight gas production units, two heated horizontal separators, and one combustor. Identification was present and production records were current. A swabbing rig was on location parked near the 1H well. |
| 1183801662 | 2017-02-09 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 12-400 barrel tanks within containment, 2-NGL tanks, a vapor recovery tower, 2 low pressure horizontal heated separators, a vertical volume pot, 2-oil stabilizer units and a gas combustor all shared with the 1H, 2H, 3H, 5H, 7H, 8H and 10H. Also present for the well was a line heater, a GP unit and a sand trap. The well was equipped with a production tree with the valves in the open position. Gauges present read 245 pounds per square inch on the tubing and 445 pounds per square inch on the casing with annular pressure monitoring in place. Identification was present and production records were current. |
| 1205773724 | 2017-05-31 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 12-400 barrel tanks within containment, 2-NGL tanks, a vapor recovery tower, 2 low pressure horizontal heated separators, a vertical volume pot, 2-oil stabilizer units and a gas combustor all shared with the 1H, 2H, 3H, 5H, 7H, 8H and 10H. Also present for the well was a disconnected line heater, a GP unit and a sand trap. The well was equipped with a plunger lift system with the valves in the open position. Gauges present read 215 pounds per square inch on the tubing and 375 pounds per square inch on the casing with annular pressure monitoring in place. Identification was present and production records were current. |
| 1240163362 | 2020-6-17 0:00: | PW | No Violations | 1.00 |
| 135039647 | 2019-9-6 0:00:0 | PW | No Violations | 0.20 |
| 1364361870 | 2016-09-15 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 12-400 barrel tanks within containment, 2-NGL tanks, a vapor recovery tower, 2 low pressure horizontal heated separators, a vertical volume pot, 2-oil stabilizer units and a gas combustor all shared with the 1H, 2H, 3H, 5H, 7H, 8H and 10H. Also present for the well was a line heater, a GP unit and a sand trap. The well was equipped with a production tree with the valves in the open position. Gauges present read 1070 pounds per square inch on the tubing and 1315 pounds per square inch on the casing with annular pressure monitoring in place.pro |
| 1616650037 | 2017-10-25 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 12-400 barrel tanks within containment, 2-disconnected NGL tanks, a vapor recovery tower, 2 low pressure horizontal heated separators, a vertical volume pot, 2-disconnected oil stabilizer units and a gas combustor all shared with the 1H, 2H, 3H, 5H, 7H, 8H and 10H. Also present for the well was a disconnected line heater, a GP unit and a sand trap. The well was equipped with a plunger lift system with the valves in the open position. Gauges present read 310 pounds per square inch on the tubing and 345 pounds per square inch on the casing with annular pressure monitoring in place. Identification was present and production records were current. |
| 1851064393 | 2015-05-13 | Casing String Witnessed | No Violations | On the day of my inspection accompanied by ODNR Inspector Matt Fulk, I witnessed that Nomac Drilling Rig #72 drilled a 17.5 inch diameter hole to a total depth of 627 feet. Wyoming Casing Crew ran and set 617 feet of 13.375 inch 54.5#/ft. J- |
| 2127199022 | 2016-06-03 | Production Wells | No Violations | On the day of my inspection I witnessed the location was gated, fenced and unlocked with identification present. The production equipment included 12-400bbl tanks within containment, 2-NGL tanks, a vapor recovery tower, 2 low pressure horizontal heated separators, a vertical volume pot, an oil stabilizer unit and a gas combustor all shared with the 1H, 2H, 3H, 5H, 7H, 8H and 10H. Also present for the well was a line heater, a GP unit and a sand trap. The well is now online and was equipped with a production tree and valves in the open position. Gauges present read 2960psi on the tubing and 3120psi on the casing with annular pressure monitoring in place. |
| 355661287 | 2015-1-7 0:00:0 | DD | No Violations | |
| 569566111 | 2015-5-14 0:00: | DD | No Violations | 3.00 |
| 657107718 | 2018-5-3 0:00:0 | PW | No Violations | 0.20 |
For data sources see[10]