If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24474 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.08,"lon":-81.26,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Oxford Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001210 | |
Farm/Lease Name: TROYER E LND GR | |
License Status: Producing | |
License Date: 2016-11-16 | |
Spud Date: 2017-12-10 | |
Spud Drilling Contractor: PRECISION DRILLING | |
Final Drill Date: 2018-01-20 | |
Well Total Depth: 16975.00 ft | |
Configuration: Horizontal | |
Latitude: 40.080000 | |
Longitude: -81.260000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-05-19 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/19/2015, Expired Date:5/18/2017 12:00:00 PM, Drilling unit acres:502.396, Proposed Well Type:OG, Proposed Well Class:EDPW |
Change of Owner | 2015-08-31 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC |
APP | 2015-09-28 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/28/2015, Expired Date:9/27/2017 12:00:00 PM, Drilling unit acres:502.396, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2016-11-16 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/16/2016, Expired Date:11/16/2017 12:00:00 PM, Drilling unit acres:502.396, Proposed Well Type:OG, Proposed Well Class: |
Correction to Well | 2017-09-01 | as drilled plat revised surface x/y's |
Construction Permit Expires | 2017-11-16 | |
Reached Total Depth | 2018-01-20 | |
Completion Report Received | 2018-09-06 | |
Record Last Modified | 2018-12-20 | |
Correction to Well | 2018-12-21 | UPDATE TAKE/TARGET PER AS-DRILLED PLAT |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-09-10 | 8511 | 9079 | 0 |
2018-09-10 | 16110 | 16290 | 0 |
8511 | 9079 | 0 | |
16110 | 16290 | 0 | |
8511 | 9079 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/01/1900 | 05/09/2018 | 9200 | 12,036,700.0 | 187377 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Supplied by Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.4887 | 100,386,000.0 |
HVG-1 4.0 | FTSI | Water gelling agent | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
FE-200A | FTSI | Iron Control | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
ICI-3240 | FTSI | Biocide | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
FRW-920 | FTSI | Friction Reducer - Zwitter ionic | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
100 Mesh Sand | FTSI | Proppant | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Phenol, 4-methoxy | 150-76-5 | 0.1 | 0.00005314 | 0 | ||||
Copolymer of 2-Propenamide | Proprietary | 30 | 0.0159429 | 0 | ||||
Alcohol Ethoxylate Surfactants | Proprietary | 10 | 0.00011911 | 0 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.00000806 | 0 | ||||
Quartz | 14808-60-7 | 4 | 0.00000269 | 0 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.00176366 | 0 | ||||
Isotridecanol, ethoxylated | 9043-30-5 | 2 | 0.00000135 | 0 | ||||
Thiourea-formaldehyde Copolymer | 68527-49-1 | 10 | 0.00011911 | 0 | ||||
Sodium Hydroxide | 1310-73-2 | 23 | 0.0111675 | 0 | ||||
Methyl Alcohol | 67-56-1 | 15 | 0.00529099 | 0 | ||||
Methanol | 67-56-1 | 90 | 0.00107199 | 0 | ||||
Sodium chloride | 7647-14-5 | 10 | 0.0053143 | 0 | ||||
Acetic acid | 64-19-7 | 40 | 0.00283339 | 0 | ||||
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1,
3, 5-thiadiazine-2-thione. |
533-74-4 | 24 | 0.011653 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.00053143 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00005956 | 0 | ||||
Guar gum | 9000-30-0 | 55 | 0.00003702 | 0 | ||||
Suspending Agent | 1302-78-9 | 5 | 0.00000337 | 0 | ||||
Silica, Quartz | 14808-60-7 | 100 | 2.42769 | 0 | ||||
Hydrocarbon | Proprietary | 3 | 0.00003573 | 0 | ||||
Glycine, N,N'-1,2-ethanediylbis[N-(carboxymethyl)-,
sodium salt (1:4) |
64-02-8 | 0.1 | 0.00005314 | 0 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 2.5 | 0.00132858 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.00003702 | 0 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 2.5 | 0.00132858 | 0 | ||||
Hydrogen Chloride | 7647-01-0 | 7.5 | 0.0945694 | 0 | ||||
Raffinates, Sorption Process | 64741-85-1 | 55 | 0.00003702 | 0 | ||||
N-olefins | Proprietary | 3 | 0.00003573 | 0 | ||||
Citric Acid | 77-92-9 | 30 | 0.00212504 | 0 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0132858 | 0 | ||||
Silica, Quartz | 14808-60-7 | 100 | 9.67736 | 0 | ||||
ORGANIC PHOSPHONIC ACIDS SALTS | 15827-60-8 | 20 | 0.00705465 | 0 | ||||
Sorbitan, mono-(9Z)-9-octadecenoate,
poly(oxy-1,2-ethanediyl) derivs |
9005-65-6 | 1 | 0.00053143 | 0 | ||||
Fatty Acids, Tall Oil | 61790-12-3 | 10 | 0.00011911 | 0 | ||||
APB-1 | FTSI | Gel breaker | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
0.1%-7.5% HCL | FTSI | Acid | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
SI-680 | FTSI | Scale Inhibitor | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
CI-150 | FTSI | Acid Corrosion Inhibitor | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 55 | 0.0267049 | 0 | |
Water | 7732-18-5 | 92.5 | 1.16636 | 0 | ||||
Water | 7732-18-5 | 80 | 0.0282186 | 0 | ||||
Water | 7732-18-5 | 50 | 0.0265715 | 0 | ||||
Water | 7732-18-5 | 45 | 0.00318757 | 0 | ||||
40/70 White | FTSI | Proppant | Listed Below Green Line | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-09 | H2O | 7 | 5045 Bbl | 248655 | Frac Tech Services | STAGE 56 OF 56 SEE IMAGES FOR STAGES 2-55 |
2018-04-22 | H2O | 7 | 5961 Bbl | 250480 | Frac Tech Services | STAGE 1 OF 56 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 618145 | 91429 | 192 |
2019 | ASCENT RESOURCES UTICA LLC | 216369 | 23558 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 1558 | 192 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 1934 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1031877103 | 2020-7-10 0:00: | PW | No Violations | 1.00 |
-1352095471 | 2018-1-9 0:00:0 | DD | No Violations | 1.50 |
-1588990744 | 2017-12-20 0:00 | DD | No Violations | 1.50 |
-1664531945 | 2017-12-11 0:00 | CS | No Violations | 2.00 |
-2023871759 | 2017-12-13 0:00 | CS | No Violations | 1.50 |
-2137456070 | 2019-8-13 0:00: | PW | No Violations | 0.50 |
-881343605 | 2019-8-13 0:00: | PW | No Violations | 0.30 |
0124787059 | 2018-01-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection at -10 degrees, I witnessed after 3 trips from the wellbore due to motor failures Precision Drilling Rig #110 was drilling ahead in the intermediate section with a 12.25 inch diameter bit at 3429 feet with a planned total depth of 7150 feet. I completed walk around revealing proper secondary containment was in place and 9.625 inch diameter 40 pound per foot casing has been offloaded for upcoming job. KLX Energy Services was onsite preparing to make up the shoe track. |
124787059 | 2018-1-3 0:00:0 | DD | No Violations | 1.50 |
1352095471 | 2018-01-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection following up from a call at 00:10 where Precision Drilling Rig 110 stated that during the 2nd stage of the 9.625 inch diameter casing cement job returns were lost at 200 barrels into displacement. Total displacement of the 2nd stage was 281.7 barrels. I met with Ascent Resources Consultant Heath Satterfield and discussed the job. Mr. Satterfield stated that a cement bond log will be performed prior to reaching total depth and will be forwarded. |
1514558786 | 2017-12-28 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness 1255 feet of 13.375 inch diameter surface casing being cemented into a 17.5 inch diameter borehole. I witnessed Wyoming casing crew run the entire string in hole. A safety meeting was held with all personnel on location including Schlumberger, Precision Drilling, and Ascent Company Men. Water and gel returns will be taken to the half rounds and when the returns change over to cement the water trucks will vacuum out the cement returns out of the cellar. Following the safety meeting Schlumberger pressure tested their lines and pumped 25 barrels gel spacer, 5 barrels of fresh water, and 288 barrels of class H cement at 15.6 pounds per gallon. A cement sampled was pulled and weighed in pressurized scales confirming the weight of 15.6 pounds per gallon. The top plug was dropped and 160 barrels of fresh water were pumped for displacement. At 100 barrels within displacement cement retuned to surface and at 160 barrels within displacement the water trucks on location could no longer vacuum up the cement returns. At that point the Ascent Superintendent shut the job down due to being overcome with cement returns and having no place for them to go. Ascent plans to wait on the cement to reach 500 pounds per square inch compressive strength and then pressure up on the casing with 500 pounds per square inch and hold that pressure for 30 minutes. |
1516370075 | 2018-01-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Precision Drilling Rig #110 had reached total depth in their lateral at 16975 feet and Wyoming Casing Crew had just landed 5.5 inch diameter 23 pound per foot P-110 casing at 16975 feet and was rigging down. Schlumberger was onsite rigging up to cement the casing. I met with Ascent Consultant John Wilson and completed a walk around along with reviewing the cement pump schedule for the upcoming job. |
1588990744 | 2017-12-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I met with Ascent Resources Consultant Steve Derment and reviewed the drilling proposal. Precision Drilling Rig #110 was onsite rigging up with plans to commence drilling on Saturday. |
1664531945 | 2017-12-11 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Express Energy Services had drilled a 36 inch diameter hole to the depth of 100 feet and ran 100 feet of 30 inch 118.65 pound per foot conductor pipe. Express Energy Services performed a 300 pounds per square inch pressure test, gained circulation, pumped 4 barrels of water and cemented pipe with 275 sacks Class A cement with 2% calcium chloride and .25 pound per sack of poly-flake with a weight of 15.6 pounds per gallon and a yield of 1.18 cubic foot per sack. Cement weight was verified by mud scales. Cement was displaced to 85 feet with 70 barrels of fresh water. Mix water was tested revealing chlorides of <32 parts per million, pH 7 and 63 degrees. Cement fell 10 feet from surface and will be checked and topped off tomorrow. |
2023871759 | 2017-12-13 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that the top of cement was at 35 feet from surface. Express Energy Services was onsite and topped off conductor with 64 sacks of 9 sack grout and cement stayed at the surface. |
2104553953 | 2018-07-10 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of seven 500 barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, one vent scrubber, and one combustor. The area effected by the pad construction has been restored with vegetation coverage. The lease road and well pad consisted of a gravel surface with no erosion issues. The location has met preliminary restoration requirements written within 1509.072 (A). The identification was posted at the well, tank battery, and entry. |
For data sources see[10]