Well Details

Well ID: 34-059-24495
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000926
Farm/Lease Name: OUTLAW C
License Status: Producing
License Date: 2017-03-07
Spud Date: 2017-03-15
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-05-17
Well Total Depth: 27739.00 ft
Configuration: Horizontal
Latitude: 39.990000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-07 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/7/2017, Expired Date:3/7/2019 12:00:00 PM, Drilling unit acres:693.838, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-05-17
Correction to Well 2017-09-15 UPDATE ACREAGE/TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2017-12-21
Record Last Modified 2018-09-13
Construction Permit Expires 2019-03-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-12-28 8003 8125 36
2017-12-28 27441 27583 12
27441 27583 12
8003 8125 36
8003 8125 36

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/29/2017 08/08/2017 7805 46,371,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND PREMIUM-30/50, BULK Halliburton Proppant Listed Below
HP-2220 One Aqua Source Scale Inhibitor Listed Below
Produced Water Operator Base Fluid Listed Below
Ingredients Listed Above Listed Above Listed Below
HP-9601 One Aqua Source Breaker Listed Below
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below
SAND-PRC PREMIUM-40/70, BULK Halliburton Proppant Listed Below
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below
HYDROCHLORIC ACID Halliburton Solvent Listed Below
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below
MB-7530 One Aqua Source Biocide Listed Below
Fresh Water Operator Base Fluid Listed Below
OILPERM A Halliburton Non-ionic Surfactant Listed Below
HP-2814 One Aqua Source Friction Reducer Listed Below
Produced Water 7732-18-5 100 11.8766 51,155,300.0
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000103222 445
Methanol 67-56-1 60 0.000206443 890
Ammonium Persulfate 7727-54-0 100 0.00198271 8540
1,2,4 Trimethylbenzene 95-63-6 1 0.00000350 16
Water 7732-18-5 100 78.782 339,333,000.0
Fatty acids, tall oil Proprietary 30 0.000103222 445
Sodium Hydroxide 1310-73-2 4 0.00111631 4809
Propargyl alcohol 107-19-7 10 0.00003441 149
Ethanol 64-17-5 60 0.000209786 904
Acetic anhydride 108-24-7 100 0.00208022 8960
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.00884821 38112
Hydrochloric acid 7647-01-0 15 0.0383319 294600
Dazomet 533-74-4 24 0.00669789 28850
Hexamethylenetetramine 100-97-0 2 0.00436024 18781
Acetic acid 64-19-7 60 0.00124813 5377
Naphthalene 91-20-3 5 0.00001748 76
Phenol / formaldehyde resin 9003-35-4 5 0.0109006 46952
Ammonium Chloride 12125-02-9 1.5 0.00073735 3176
Ethoxylated alcohols Proprietary 30 0.000103222 445
Water 7732-18-5 100 0.455977 1,964,000.0
Crystalline silica, quartz 14808-60-7 100 8.7904 37,862,300.0
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00001748 76
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000104893 452
Olefins Proprietary 5 0.00004129 180
Oxyalkylated phenolic resin Proprietary 30 0.000139858 603
Organic Phosphate Copolymer 71050-62-9 25 0.0032944 14190

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-07-27 H2O 0 353421 Gal 316240 Halliburton Stage 76 of 122. 36 total perforations from 15515 feet to 15392 feet
2017-06-29 H2O 15 415030 Gal 236020 Halliburton STAGE 1/122

STAGES 2-121 SEE IMAGES

2020-08-08 H2O 15 332993 Gal 315840 Halliburton STAGE 122/122

STAGES 2-121 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP 465756 153693 72
2018 ECLIPSE RESOURCES I LP 1027641 295530 275
2019 ECLIPSE RESOURCES I LP 296761 57408 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP Brine 27816 72
2018 ECLIPSE RESOURCES I LP Brine 141093 275
2019 ECLIPSE RESOURCES I LP Brine 13731 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1092203834 2019-12-19 0:00 PW No Violations 0.10
-132249534 2017-10-2 0:00: CT No Violations 0.20
-1428095779 2017-5-2 0:00:0 DD No Violations 2.00
-1641525264 2018-3-12 0:00: PW No Violations 0.30
-1709863523 2020-3-10 0:00: PW No Violations 0.10
-1780476016 2017-3-18 0:00: CS No Violations 3.00
-1829249913 2017-6-27 0:00: CT No Violations 0.50
-1868501491 2017-5-11 0:00: DD No Violations 1.50
-197964964 2018-1-16 0:00: PW No Violations 0.50
-1980723937 2018-2-26 0:00: PW No Violations 0.50
-2110869874 2017-9-5 0:00:0 CT No Violations 2.50
-470112650 2017-3-14 0:00: ND No Violations 1.00
-570958310 2017-10-25 0:00 CT No Violations 1.00
-589311483 2017-5-16 0:00: CS No Violations 3.00
-590535851 2018-7-19 0:00: PL No Violations 0.20
0132249534 2017-10-02 Completion Testing No Violations On the day of my inspection I witnessed drill out operations were completed with preliminary rig up of flowback equipment taking place. Flowback operations will commence later this month after completing operations on the 34059244140000 Fineran 2H.
0190705901 2017-07-27 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services frac stage 76 of 122 with a breakdown pressure of 7052 pounds per square inch, an average treating pressure of 8784 pounds per square inch, an average rate of 90.2 barrels per minute and a total of 316240 pounds of proppant pumped. I completed walk around with Eclipse Consultant Anthony Torrez and Eclipse EHS Supervisor Ken Durst revealing proper secondary containment was in place.
0197964964 2018-01-16 Production Wells No Violations On the day of my inspection with the ground snow covered, I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 1315 pounds per square inch on the tubing and 1570 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included 2-GP units, 2-line heaters and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243660000, 34059243670000, 34059243650000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP units and then transferred to the Hayes CGF.
0470112650 2017-03-14 Not Drilled No Violations On the day of my inspection I witnessed the cellar has been set. I met with Eclipse Consultants Ryan Bartholomew and Matt Amos who stated that rig mats and containment will be laid today. Precision Rathole will be onsite tomorrow with in preparation of spudding of the well this week.
0570958310 2017-10-25 Completion Testing No Violations On the day of my inspection I witnessed the well was flowing back with through Tetra Technologies flowback equipment to sales with 2975 pounds per square inches on the tubing and 2190 pounds per square inches on the casing at 5 MMCF per day and 240 barrels per hour of oil and 2 barrels per hour of water through a 20/64 inch choke. I met with Consultant Cristo Giannareas and completed walk around. Mr. Giannareas stated that the well will be turned over to production tomorrow.
0589311483 2017-05-16 Casing String Witnessed No Violations
0590535851 2018-07-19 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection Deep Well Services Rig 4 was rigged up on the Yost B5H. I spoke with Eclipse Company man and he stated that they were in the process of installing a plunger lift system. Two 500-barrel frac tanks and one 500-barrel gas buster were being utilized. All casing strings were equipped with a pressure gauge and were being monitored. The area effected by the construction of the pad has been restored with vegetation established. The location meets preliminary restoration requirements listed under ORC 1509.072(A).
0714311841 2017-11-13 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 2330 pounds per square inch on the tubing and 2200 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included 2-GP units, 2-line heaters and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243660000, 34059243670000, 34059243650000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP units and then transferred to the Hayes CGF.
0924367556 2018-10-22 Production Wells No Violations During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring and identification was present. The production equipment included a gas production unit, a line heater, a sand trap, and three 400-barrel tanks.
0969934161 2017-07-13 Completion Testing No Violations On the day of my inspection I witnessed frac operations were down for maintenance on Halliburton pump trucks. Nine Wireline was onsite to plug and perforate stage 39 of 122. Tools were pumped down with 531 barrels of produced water at 15 barrels per minute with 6400 pounds per square inch. Nine Wireline successfully set the plug at 25467 feet and perforated the casing with 36 shots from 21456 feet to 21336 feet. I completed walk around with Consultant Rueben Garza revealing proper secondary containment was in place and frac operations were to resume later this morning upon completion of maintenance.
1236721517 2017-09-05 Production Wells No Violations On the day of my inspection I accompanied ODNR Inspector Doug Bennett. Deep Well Service Stand Alone Snubbing Unit # 6 (DWS SN #6) is drilling out frac plug # 54 of 122 at 16,325 feet with a 4 1/2 inch diameter tricone bit. Mid-Atlantic Services is onsite controlling well pressure at 4400 pounds per square inch, along with Tetra Services assisting with flowback of fluids.
1242581610 2020-6-18 0:00: PW No Violations 1.00
1254977596 2019-01-31 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position on the production tubing. Two production flow lines are attached to the well, one to produce from the tubing and one to produce from the production casing. The 13.375-inch diameter surface casing had 0 pounds per square inch, the 9.625-inch diameter intermediate casing had 500 pounds per square inch, the 5.5-inch diameter production casing had 1000 pounds per square inch, and the 2.875-inch diameter tubing had 733 pounds per square inch. The production equipment consisted of eight sand traps, eight gas production units, and three 400-barrel tanks. The produced water was being separated on pad and distributed in 400-barrel tanks. The oil and gas were being gathered at the Eclipse Hayes CGF pad via pipeline. Identification was located at the wellhead.
1428095779 2017-05-02 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 had completed drill out of 9.625 inch diameter float equipment at 7141 feet and was tripping out of the wellbore. H&P Flex Rig #531 will pick up 8.75 inch diameter bottom hole assembly and trip back in and begin to drill curve and landing the curve at 8350 feet.
1493039457 2017-04-24 Drill / Deepen / Reopen No Violations During my inspection H&P Drilling Rig 531 was preparing to spud the 17.5 inch diameter surface section. I discussed the proposed time for a cement job with the company man on location and he plans to have 13.375 inch diameter surface casing landed and ready to cement in place at 1:00 PM on 4/25/17.
1493208399 2017-04-25 Casing String Witnessed No Violations The purpose of my inspection was to witness 1331 feet of 13.375 inch diameter surface casing being cemented within a 17.5 inch diameter borehole that was 1374 feet in depth. A mixed casing string was run with 129 feet of 61 pound per foot and 1205 feet of 54.5 pound per foot casing. The shoe track was 46 feet. During my inspection I witnessed Halliburton pump 250 barrels fresh water, 25 barrels gel spacer, and 223.5 barrels of 15.8 pound per gallon cement. The top plug was launched and displaced with 197 barrels fresh water. The plug was bumped and held for 5 minutes. Gel returned to surface 150 barrels into displacement and 17 barrels of good cement was circulated back to surface. 2 barrels were bled back to the truck to check floats and the floats held. Mix water was tested and cement was weighed in pressurized mud scales and results were satisfactory.
1493208794 2017-04-25 Drill / Deepen / Reopen No Violations During my inspection the H&P Drilling Rig 531 was drilling the 17.5 inch diameter surface borehole at 1037 feet in depth. 13.375 inch diameter surface casing will be ran and cemented when the rig reaches a depth of 1374 feet. The company man on location stated that the estimated time for the cement job was 5:00 PM this evening.
1499093169 2017-07-03 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services frac stage 12 of 122 with a breakdown pressure of 6818 pounds per square inch, an average treating pressure of 10138 pounds per square inch, an average rate of 89.9 barrels per minute and a total of 315465 pounds of proppant pumped. I completed walk around with Eclipse Consultant Diamon Girod revealing proper secondary containment was in place.
1641525264 2018-03-12 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 890 pounds per square inch on the tubing and 1035 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included 2-GP units, 2-line heaters and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243660000, 34059243670000, 34059243650000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP units and then transferred to the Hayes CGF. The site passed preliminary restoration according to ORC 1509.072A.
1780476016 2017-03-18 Casing String Witnessed No Violations On the day inspection I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 120 feet, hitting water at 40 feet and ran 120 feet of 24 inch diameter 94.62 pounds per foot conductor pipe. Stingray Pressure Pumping was onsite and pumped 2 barrels of fresh water, performed a 500 pounds per square inch pressure test, gained circulation with 17 barrels of fresh water, pumped 15 barrels of gel, pumped 10 barrels of fresh water and cemented pipe with 290 sacks Class A cement with 2% CaCl and .25 pound per sack of Celluseal weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 110 feet with 57.75 barrels of fresh water with good cement returns of 17 barrels to surface. Mix water was tested revealing chlorides of 54 parts per million, pH 7 and 53 degrees.
1829249913 2017-06-27 Completion Testing No Violations On the day of my inspection I met with Eclipse Consultant Dustin Moore and reviewed upcoming frac schedule which will consist Halliburton fracing 122 stages beginning late Wednesday or early Thursday. The well will be zipper fraced with the 34059244940000 Great Scott 3H. I completed walk around confirming at this time containment is being completed for the installation of the onsite produced water tanks. Upon completion tanks will be set and offloading of sand will begin with commencement of frac to follow.
1868501491 2017-05-11 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 was drilling ahead in their lateral on 11.8 pound per gallon mud an 8.5 inch diameter Schlumberger Orbit tool with 26,000 pounds of torque at 27,012 feet with planned total depth of 27,739 feet. Upon reaching total depth the rig will perform a clean-up cycle and begin to lay down drill pipe in preparation of running 5.5 inch diameter production casing.
190705901 2017-7-27 0:00: CT No Violations 3.20
1918885215 2018-02-26 Production Wells No Violations Accompanied Guernsey County Inspector Doug Bennett, Reference his Report for further details
1957190269 2017-07-10 Completion Testing No Violations On the day of my inspection I witnessed frac operations were down for the morning as Xandu Road is being chipped and sealed in efforts to reduce dust and road failure.
1980723937 2018-02-26 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Ryan Armstrong, I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 900 pounds per square inch on the tubing and 1200 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included 2-GP units, 2-line heaters and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243660000, 34059243670000, 34059243650000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP units and then transferred to the Hayes CGF.
2062040468 2017-07-18 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services frac stage 53 of 122 with a breakdown pressure of 6199 pounds per square inch, an average treating pressure of 10090 pounds per square inch, an average rate of 76.05 barrels per minute and a total of 312030 pounds of proppant pumped. I completed walk around with Consultant Rueben Garza revealing proper secondary containment was in place.
2110869874 2017-09-05 Completion Testing No Violations On the day of my inspection accompanied by ODNR Inspector Tom Thomas, I witnessed Deep Well Service Stand Alone Snubbing Unit # 6 (DWS # 6) was drilling out frac plug # 54 of 122 at 16325 feet with a 4.5 inch diameter tricone bit. Mid-Atlantic Services was onsite controlling well pressure at 4400 pounds square inch along Tetra Services assisting with flowback of fluids.
538096309 2019-10-9 0:00: PW No Violations 0.20
714311841 2017-11-13 0:00 PW No Violations 0.50
924367556 2018-10-22 0:00 PW No Violations 0.10
969934161 2017-7-13 0:00: CT No Violations 2.50

For data sources see[10]

References