34-059-24515

Well Details

Well ID: 34-059-24515
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001495
Farm/Lease Name: MERCURY A
License Status: Producing
License Date: 2017-08-15
Spud Date: 2017-08-15
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-09-23
Well Total Depth: 22015.00 ft
Configuration: Horizontal
Latitude: 39.980000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-08-15 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:8/15/2017, Expired Date:8/15/2019 12:00:00 PM, Drilling unit acres:607.065, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-09-23
Correction to Well 2017-12-29 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-07-09
Record Last Modified 2018-07-13
Construction Permit Expires 2019-08-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-07-12 8127 8252 0
2018-07-12 21754 21858 0
21754 21858 0
8127 8252 0
8127 8252 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/25/2018 03/21/2018 7600 24,140,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HP-2814 One AquaSource Inc. Friction Reducer Listed Below Listed Below 0 0 0
HP-2220 One AquaSource Inc. Scale Inhibitor Listed Below Listed Below 0 0 0
Dazomet 533-74-4 24 0.00525749 11902
Citric acid 77-92-9 60 0.00229985 5207
Ammonium persulfate 7727-54-0 95 0.00196566 4450
Ethoxylated alcohols Proprietary 30 0.000164975 374
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00002794 64
Organic phosphate copolymer 71050-62-9 25 0.00317409 7186
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000167647 380
Naphthalene 91-20-3 5 0.00002794 64
1,2,4 Trimethylbenzene 95-63-6 1 0.00000559 13
Poly (oxy-1, 2-ethanediyl), a-tridecyl-w-hydroxy-, branched 69011-36-5 5 0.00111737 2530
Fatty acids, tall oil Proprietary 30 0.000164975 374
Hydrochloric acid 7647-01-0 15 0.10932 247464
Propargyl alcohol 107-19-7 10 0.00005499 125
Modified thiourea polymer Proprietary 30 0.000164975 374
Crystalline silica, quartz 14808-60-7 100 10.1456 22,967,300.0
Ammonium chloride 12125-02-9 1.5 0.00081171 1838
Oxyalkylated phenolic resin Proprietary 30 0.000223529 507
Olefins Proprietary 5 0.00006599 152
Distillates (petroleum, hydrotreated light) 64742-47-8 20 0.01421 32169
Methanol 67-56-1 60 0.00032995 747
Ethanol 64-17-5 60 0.000335293 760
Sodium hydroxide 1310-73-2 4 0.000876248 1984
Fresh Water Operator Base Fluid Water 7732-18-5 100 86.6141 196,074,000.0
Water 7732-18-5 100 2.39344 5,418,170.0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HP-2816 One AquaSource Inc. Friction Reducer Listed Below Listed Below 0 0 0
MB-7530 One AquaSource Inc. Biocide Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.731069 1,654,970.0
HP-9601 One AquaSource Inc. Additive Listed Below Listed Below 0 0 0
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG Halliburton Proppant Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-02-25 H2O 15 284706 Gal 268937 Halliburton STAGE 1/84

STAGES 2-83 SEE IMAGES

2018-03-20 H2O 15 260500 Gal 268102 Halliburton STAGE 84/84

STAGES 2-83 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 1657380 203452 227
2019 ECLIPSE RESOURCES I LP 569244 39100 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 33142 227
2019 ECLIPSE RESOURCES I LP Brine 8522 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1013916252 2018-3-12 0:00: CT No Violations 1.50
-1359593387 2018-8-7 0:00:0 PL No Violations 3.00
-1534158836 2017-9-20 0:00: DD No Violations 1.00
-1909023565 2020-7-30 0:00: PW No Violations 1.00
-598936850 2018-7-19 0:00: PL No Violations 0.20
-92038525 2019-3-27 0:00: PW No Violations 0.20
-987760629 2017-9-12 0:00: DD No Violations 1.00
0092038525 2019-03-27 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. On the west side of the pad the top of the high wall on the cut slope was eroded toppling material sedimentation down near the tank battery. Mark Atkinson with ODNR Engineering was aware of the issue and he has been in contact with Eclipse Resources.
0598936850 2018-07-19 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure gauges for all casing strings were present and in plain view with a casing identification tag. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. Eight 500-barrel Frac tanks are located on the West side of the pad. Due to signs of erosion on the cut slope on the West side of the pad the location does not meet Preliminary restoration requirements written under ORC 1509.072 (A). I will consult ODNR Engineering section and discuss the cut slope erosion.
0987760629 2017-09-12 Drill / Deepen / Reopen No Violations On the day of my inspection, I accompanied ODNR Inspector Doug Bennett and witnessed H&P Flex Rig #531 had reached total depth at 7170 feet and tripped drill pipe from wellbore. Wyoming Casing Crew was onsite rigging up to run 9.625 inch diameter 40 pound per foot P-110 casing to be set at 7107 feet. A DV tool will be set at 1707 feet with a 2-stage cement job to follow. We met with Eclipse Consultant Neil Ingram and completed a walk around.
1013916252 2018-03-12 Completion Testing No Violations On the day of my inspection I witnessed Nine Wireline was onsite to plug and perforate stage 52 of 84. S3 Pumping pumped tools down with 254 barrels of produced water at 17 barrels per minute with 7200 pounds per square inch. Nine Wireline successfully set the plug at 13525 feet and perforated the casing with 36 shots from 13506 feet to 13375 feet. I met with Eclipse Consultants Jimmy Metcalf, Lance Crumbling and Cristo Giannareas and completed walk around. Frac operations were suspended as Halliburton was making repairs to their missile.
1359593387 2018-08-07 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure gauges for all casing strings were present and in plain view with a casing identification tag. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. Three 500-barrel Frac tanks are located on the West side of the pad. Signs of erosion remain on the cut slope on the West side of the pad. I spoke with Mark Atkinson with the ODNR Engineering Section and he stated that they would investigate the situation.
1503152342 2017-08-16 Casing String Witnessed No Violations On the day inspection I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 119 feet, hitting water at 17 feet and ran 120 feet of 24 inch diameter 94.62 pounds per foot conductor pipe with a 1 foot stick up. Stingray Pressure Pumping was onsite and pumped 2 barrels of fresh water, performed a 500 pounds per square inch pressure test and cemented pipe with 290 sacks Class A cement with 2% CaCl and .25 pound per sack of Celluseal weighing 15.6 pounds per gallon and a yield of 1.21 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 109 feet with 57.75 barrels of fresh water with good cement returns of 10 barrels to surface. Mix water was tested revealing chlorides of 46 parts per million, pH 7 and 65 degrees.
1505240185 2017-09-12 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by ODNR Inspector Tom Thomas, I witnessed H&P Flex Rig #531 had reached total depth at 7170 feet and tripped drill pipe from wellbore. Wyoming Casing Crew was onsite rigging up to run 9.625 inch diameter 40 pound per foot P-110 casing to be set at 7107 feet. A DV tool will be set at 1707 feet with a 2-stage cement job to follow. We met with Eclipse Consultant Neil Ingram and completed walk around.
1534158836 2017-09-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 had reached total depth of 22015 feet, circulating the wellbore with 12.5 pound per gallon mud and tripping out of the wellbore at 14180 feet. Upon completion Wyoming Casing Crew will run 21994 feet of 5.5 inch diameter production casing and upon completion Schlumberger will cement the casing. I completed walk around with Eclipse Consultant Jack Turner and reviewed the production casing cement proposal with Eclipse Cementing Supervisor Nathan Anderle.
1540213575 2018-10-16 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. Location meets requirements for preliminary restoration.
1958335632 2019-11-27 0:00 PW No Violations 0.30

For data sources see[10]