Well ID: 34-059-24521 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97,"lon":-81.34,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Millwood Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001546 | |
Farm/Lease Name: JUPITER A UNIT | |
License Status: Producing | |
License Date: 2018-04-16 | |
Spud Date: 2018-05-16 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-05-31 | |
Well Total Depth: 25590.00 ft | |
Configuration: Horizontal | |
Latitude: 39.970000 | |
Longitude: -81.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-09-28 | Proposed Formations:TRENTON, Issued Date:9/28/2017, Expired Date:9/28/2019 12:00:00 PM, Drilling unit acres:, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2018-04-16 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/16/2018, Expired Date:4/15/2020 12:00:00 PM, Drilling unit acres:1178.185, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-05-31 | |
Correction to Well | 2018-08-24 | UPDATE TAKE TARGET ACREAGE AS-DRILLED |
Completion Report Received | 2018-11-29 | |
Record Last Modified | 2018-12-13 | |
Construction Permit Expires | 2020-04-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-12-12 | 7858 | 7972 | 0 |
2018-12-12 | 25297 | 25400 | 0 |
25297 | 25400 | 0 | |
7858 | 7972 | 0 | |
7858 | 7972 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/13/2018 | 08/17/2018 | 25297 | 37,277,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
HP-9601 | One AquaSource Inc. | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
LD-2850 | Multi-chem | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2220 | One AquaSource Inc. | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2816 | One AquaSource Inc. | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-30/50, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2814 | One AquaSource Inc. | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 9.20242 | 31,801,800.0 | |
Water | 7732-18-5 | 100 | 81.3365 | 281,083,000.0 | ||||
SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
LD-2550 | Multi-chem | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.000155576 | 538 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000153097 | 530 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00002593 | 90 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000153097 | 530 | ||||
Ammonium persulfate | 7727-54-0 | 95 | 0.00177035 | 6118 | ||||
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.00005602 | 194 | ||||
Glycerine | 56-81-5 | 5 | 0.00002749 | 95 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00000980 | 34 | ||||
Methanol | 67-56-1 | 60 | 0.000362486 | 1254 | ||||
Poly )oxy-1, 2-ethanediyl), a-tridecyl-w-hydroxy-, branched | 69011-36-5 | 5 | 0.000201975 | 698 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00005877 | 204 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005103 | 177 | ||||
Naphthalene | 91-20-3 | 5 | 0.00002593 | 90 | ||||
Ethanol | 64-17-5 | 60 | 0.000313112 | 1083 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00003241 | 112 | ||||
1-Propanaminium, 3-amino-n-(carboxymethyl)-n,
n-dimethyl-n-coco alkyl derivatives, hydroxides and inner salts |
61789-40-0 | 60 | 0.000329872 | 1140 | ||||
Citric acid | 77-92-9 | 60 | 0.00213427 | 7376 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000153097 | 530 | ||||
Ammonium chloride | 12125-02-9 | 1.5 | 0.000980143 | 3388 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.042268 | 146070 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.000194455 | 672 | ||||
Dazomet | 533-74-4 | 24 | 0.00576461 | 19922 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000519 | 18 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00000020 | 1 | ||||
9-Octodecenamide, n, n-bis-2 (hydroxy-ethyl)-, (Z) | 93-83-4 | 5 | 0.00003241 | 112 | ||||
Sodium hydroxide | 7647-14-5 | 10 | 0.00101575 | 3511 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 9.06643 | 31,331,800.0 | ||||
Olefins | Proprietary | 5 | 0.00006124 | 214 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.000207435 | 718 | ||||
Oraganic phosphate copolymer | 71050-62-9 | 25 | 0.00285214 | 9857 | ||||
Distillates (petroleum, hydrotreated light) | 64742-47-8 | 20 | 0.0125696 | 43439 | ||||
Sodium chloride | 7647-14-5 | 30 | 0.000194455 | 672 | ||||
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.284196 | 982127 | |
MB-7532 | One AquaSource Inc. | Biocide | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-07-13 | ACID | 0 | 321308 Gal | 270020 | Halliburton | Stage 1 completed by Halliburton. |
2018-08-18 | H2O | 15 | 300696 Gal | 277280 | Halliburton | STAGE 117/117
STAGES 1-116 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | 572414 | 169842 | 93 |
2019 | ECLIPSE RESOURCES I LP | 519636 | 128922 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | Brine | 43316 | 93 |
2019 | ECLIPSE RESOURCES I LP | Brine | 27781 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1167312264 | 2019-10-9 0:00: | PW | No Violations | 0.20 |
-1203018948 | 2020-1-15 0:00: | PW | No Violations | 0.50 |
-1249880142 | 2019-1-31 0:00: | PW | No Violations | 0.50 |
-1395427387 | 2020-1-15 0:00: | PW | No Violations | 0.50 |
-1751252516 | 2019-12-4 0:00: | PW | No Violations | 0.50 |
-405209031 | 2018-9-10 0:00: | PL | No Violations | 0.50 |
-564713284 | 2018-2-11 0:00: | CS | No Violations | 7.50 |
-97561102 | 2018-1-30 0:00: | DD | No Violations | 1.00 |
-994846541 | 2018-7-13 0:00: | CT | No Violations | 3.00 |
0097561102 | 2018-01-30 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Precision Rathole was drilling at 54 feet with a planned total depth of 120 feet. Upon reaching total depth Precision will run 120 feet of 24 inch diameter 94.62 pounds per foot conductor pipe with cementing to follow. |
0221050845 | 2018-01-29 | Casing String Witnessed | No Violations | On the day of my inspection after receiving a call from Eclipse Consultant Charlie Frazier concerning the wellbore caving in after spudding the well on 1/27/18, I witnessed that below the cellar the sand based material had collapsed into the wellbore with drilling ceased. A meeting with Mr. Frazier and Cement Specialist Lex Cook was held where they propose to clean the wellbore up with a 42 inch diameter bit and install 36 inch drive pipe into bedrock and remove any excess water and then utilizing 9-grout fill the backside to surface. Precision cleaned the wellbore up with a 42 inch diameter bit to 16 feet and ran 21 feet of 36 inch 195.175 pound per foot drive pipe and drove it to 26 feet leaving it set at 5 feet below surface. Water was removed from the annulus and Caldwell Redi-Mix pumped 10 yards of 9-sack grout bringing grout to surface. Tomorrow Precision Rathole will commence drilling a 30 inch diameter hole to the total depth of 120 feet and then running 24 inch diameter conductor pipe with cement to follow. |
0405209031 | 2018-09-10 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection Deep Well Services stand alone snubbing unit 10 was on location drilling out frac plugs on 3405924521 and production equipment was being assembled. The area affected by pad construction has all been remediated with vegetation growth. The lease road was paved with asphalt and concrete and the pad was gravel. The location meets the preliminary restoration requirements for 1509.072 (A). |
0564713284 | 2018-02-11 | Casing String Witnessed | No Violations | On the day inspection I witnessed that Yost Drilling Rig #5 had drilled a 17.5 inch diameter hole to the depth of 1214 feet. Wyoming Casing Crew ran 1216.56 feet of 13.375 inch 54.5#/ft. J-55 casing set at 6.5 feet above KB. KB height is 12 feet above ground level. Schlumberger was on site and loaded their lines with 5 barrels of fresh water and performed a low pressure test at 1000 pound per square inch and a high pressure test at 3000 pounds per square inch. Schlumberger gained circulation with 181.4 barrels of fresh water, 20 barrels of gel and 10 barrels of fresh water. Schlumberger cemented casing with 1040 sacks of Class A cement 15.6 pounds per gallon, 1.19 cubic foot per sack cement with 1% S001 CaCl, .1 pound per sack D130 Flake, .2% D202 Dispersant, .020 gallon per sack D047 Antifoam and .5% B348 FLAC. Cement weight was verified by pressurized mud scales and displaced with 181.4 barrels of fresh water. Cement was circulated to surface with good returns of 30 barrels. Plug was landed at 510 pounds per square inch and pressured to 1080 pounds per square inch for 5 minutes and the floats held with 1 barrel back. Mix water was tested revealing chlorides of 60 parts per million, pH 6 and 60 degrees. |
0803123742 | 2019-03-12 | Production Wells | No Violations | I was accompanied by ODNR Southeast Regional Manager Brent Bear and the purpose of our inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. The 13.375-inch diameter surface casing had 0 pounds per square inch, the 9.625-inch diameter intermediate casing had 0 pounds per square inch, the 5.5-inch diameter production casing had 205 pounds per square inch, and the 2.875-inch diameter tubing had 800 pounds per square inch. The production equipment consisted of four sand traps, four gas production units, and two 400-barrel tanks. The produced water was being separated on pad and being stored in the 400-barrel tanks. Produced oil and gas was being gathered at the Eclipse outlaw pad via pipeline. Identification was located at the wellhead. |
0994846541 | 2018-07-13 | Completion Testing | No Violations | The purpose of my inspection was to witness stage 1 of hydraulic stimulation operations on the 1H. During my inspection I witnessed Halliburton utilize sand boxes and an above ground storage tank to pump a total of 270,020 pounds of sand proppant and 321308 gallons of water. The average rate was 82.5 barrels per minute, breakdown pressure was 5012 pounds per square inch, and the treatment pressure was 9113 pounds per square inch. They were completing through a 5.5 inch diameter production casing and annular pressure monitoring was present and displayed in the Frac Van. |
1130943275 | 2018-10-09 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of four sand traps, 4 gas production units, and two 400-barrel tanks. Identification was posted at the wellhead. Southern Fencing company was on location installing chain link fencing around the pad. |
1249880142 | 2019-01-31 | Production Wells | No Violations | The purpose of my inspection was a status check. The pad is named Jupiter and on this date the pad consist of two production wells 3405924520 and 3405924521. During my inspection the well was equipped with a plunger lift system with valves in the open position. The 13.375-inch diameter surface casing had 0 pounds per square inch, the 9.625-inch diameter intermediate casing had 0 pounds per square inch, the 5.5-inch diameter production casing had 250 pounds per square inch, and the 2.875-inch diameter tubing had 900 pounds per square inch. The production equipment consisted of four sand traps, four gas production units, four frac tanks, and two 400-barrel tanks. The produced water was being separated on pad and distributed in the frac and 400-barrel tanks. The oil and gas were being gathered at the Eclipse outlaw pad via pipeline. Identification was located at the wellhead. |
1503744297 | 2020-7-29 0:00: | PW | No Violations | 1.00 |
1517431806 | 2018-01-31 | Casing String Witnessed | No Violations | On the day inspection I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 104 feet and ran 107 feet of 24 inch diameter 94.62 pounds per foot conductor pipe with a 3 foot stick up. Stingray Pressure Pumping was onsite and pumped 2 barrels of fresh water, performed a 300 pounds per square inch pressure test and cemented pipe with 350 sacks Class A cement with 2% CaCl and .25 pound per sack of Celluseal weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 97 feet with 51 barrels of fresh water with good cement returns of 20 barrels to surface. Mix water was tested revealing chlorides of 32 parts per million, pH 7 and 58 degrees. |
221050845 | 2018-1-29 0:00: | CS | No Violations | 4.00 |
803123742 | 2019-3-12 0:00: | PW | No Violations | 0.20 |
For data sources see[10]