If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24522 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.95,"lon":-81.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Richland Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-000785 | |
Farm/Lease Name: RECTOR E RCH GR | |
License Status: Producing | |
License Date: 2018-03-09 | |
Spud Date: 2018-03-10 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-05-25 | |
Well Total Depth: 17921.00 ft | |
Configuration: Horizontal | |
Latitude: 39.950000 | |
Longitude: -81.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-09 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/9/2018, Expired Date:3/8/2020 12:00:00 PM, Drilling unit acres:415.698, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-05-25 | |
Correction to Well | 2018-09-14 | TAKE TARGET AS-DRILLED PLAT |
Record Last Modified | 2019-06-11 | |
Construction Permit Expires | 2020-03-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
17631 | 17728 | 0 | |
8185 | 8306 | 0 | |
8185 | 8306 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/16/2018 | 07/28/2018 | 7376 | 13,929,400.0 | 199411 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HVG-1 4.0 | FTSI | Water gelling agent | Listed Below Green Line | Listed Below | 0 | 0 | 0 |
10.1%-15.0% HCL | FTSI | Acid | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
CS-1000 SI | FTSI | Scale Inhibitor | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Water | Supplied by Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.848 | 116,171,000.0 | |
FRW-1450 | FTSI | Friction Reducer | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.0177443 | 0 | ||||
Orthophosphoric acid | 7664-38-2 | 0.75 | 0.000282468 | 0 | ||||
Citric Acid | 77-92-9 | 30 | 0.00203209 | 0 | ||||
Ethanol | 64-17-5 | 5 | 0.00105093 | 0 | ||||
Methanol | 67-56-1 | 90 | 0.00099397 | 0 | ||||
Phosphonic Acid, {(Dimethylamino) Methylene} Bis - | 29712-30-9 | 5 | 0.00188312 | 0 | ||||
Isotridecanol, ethoxylated | 9043-30-5 | 2 | 0.00000532 | 0 | ||||
N-olefins | Proprietary | 3 | 0.00003313 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.000146328 | 0 | ||||
Silica, Quartz | 14808-60-7 | 100 | 2.3973 | 0 | ||||
Suspending Agent | 1302-78-9 | 5 | 0.00001330 | 0 | ||||
Guar gum | 9000-30-0 | 55 | 0.000146328 | 0 | ||||
Hydrochloric acid | 7647-01-0 | 0.005 | 0.00000188 | 0 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.00004198 | 0 | ||||
Alcohol Ethoxylate Surfactants | Proprietary | 10 | 0.000110441 | 0 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00105093 | 0 | ||||
Thiourea-formaldehyde Copolymer | 68527-49-1 | 10 | 0.000110441 | 0 | ||||
Quartz | 14808-60-7 | 4 | 0.00001064 | 0 | ||||
Acetic acid | 64-19-7 | 40 | 0.00270945 | 0 | ||||
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.00295738 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00005522 | 0 | ||||
Hydrogen Chloride | 7647-01-0 | 15 | 0.00200727 | 0 | ||||
Phosphonic Acid, {Nitrilotris (methylene)} Tris | 6419-19-8 | 35 | 0.0131818 | 0 | ||||
Cationic Polyacrylamide | 9003-05-8 | 30 | 0.0177443 | 0 | ||||
Fatty Acids, Tall Oil | 61790-12-3 | 10 | 0.000110441 | 0 | ||||
Silica, Quartz | 14808-60-7 | 100 | 9.45156 | 0 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00210185 | 0 | ||||
Hydrogen Chloride | 7647-01-0 | 7.5 | 0.0872791 | 0 | ||||
Raffinates, Sorption Process | 64741-85-1 | 55 | 0.000146328 | 0 | ||||
Phosphorous Acid | 10294-56-1 | 2 | 0.000753247 | 0 | ||||
100 Mesh Sand | FTSI | Proppant | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
APB-1 | FTSI | Gel breaker | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 92.5 | 1.07644 | 0 | |
Water | 7732-18-5 | 45 | 0.00304814 | 0 | ||||
Water | 7732-18-5 | 100 | 0.0210185 | 0 | ||||
Water | 7732-18-5 | 85 | 0.0113745 | 0 | ||||
Water | 7732-18-5 | 50 | 0.0295738 | 0 | ||||
Water | 7732-18-5 | 55 | 0.0207143 | 0 | ||||
CI-150 | FTSI | Acid Corrosion Inhibitor | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
FE-200A | FTSI | Iron Control | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
0.1%-7.5% HCL | FTSI | Acid | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
40/70 White | FTSI | Proppant | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Bactron K-139 | FTSI | Biocide | Listed Below Green Line | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 1758 | 406 | 1 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 21 | 1 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1601370742 | 2019-11-19 0:00 | PW | No Violations | 0.10 |
-1674089874 | 2019-12-13 0:00 | PW | No Violations | 0.20 |
-1901813013 | 2020-1-29 0:00: | PW | No Violations | 0.20 |
-416636268 | 2020-6-3 0:00:0 | PW | No Violations | 1.00 |
-764097180 | 2019-4-3 0:00:0 | PW | No Violations | 0.10 |
0007103977 | 2019-02-19 | Completion Testing | No Violations | The purpose of my inspection was a status check. The five wells on location were all shut in waiting for the new pipeline to arrive. During my inspection the well had not been flowed back after completion. The well was equipped with a production tree style wellhead. All valves were chained and locked in the closed position. The valves leading to annular pressure gauges were in the closed position. The production equipment consisted of six 400-barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, and one combustor. The identification was posted at the well, tank battery, and entry. |
0764097180 | 2019-04-03 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead. The production valves were in the open position. Select Energy Services were on location managing flowback operations on the five wells on the pad. I spoke with the Ascent Company man on location and he stated that the annular pressure was being monitored. The production equipment consisted of six 400-barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, and one combustor. The identification was posted at the well, tank battery, and entry. |
0881288474 | 2018-10-30 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead. Production valves were in the closed position with chains and locks on all gate valves. The production equipment consisted of six 400-barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, and one combustor. The area effected by the pad construction has been restored with vegetation coverage on the lease road and pad perimeters. The lease road and well pad consisted of a gravel surface with no erosion issues. The location has met preliminary restoration requirements written within 1509.072 (A). The identification was posted at the well, tank battery, and entry. Laminated copies of the Drilling permits were posted at entry. Roustabouts were on location assembling production lines for production equipment. |
1521476448 | 2018-03-11 | Casing String Witnessed | No Violations | On the day of my inspection accompanied by ODNR Inspector Ryan Armstrong, I witnessed that Express Energy Services had drilled a 36 inch diameter hole to the depth of 100 feet and ran 100 feet of 30 inch 118.65 pound per foot conductor pipe. Express performed a 400 pounds per square inch pressure test, gained circulation, pumped 8 barrels of water and cemented pipe with 315 sacks Class A cement with 2% calcium chloride and .25 pound per sack of poly-flake with a weight of 15.6 pounds per gallon and a yield of 1.18 cubic foot per sack. Cement weight was verified by mud scales. Cement was displaced to 90 feet with 74.8 barrels of fresh water circulating 20 barrels to surface. Mix water was tested revealing chlorides of 68 parts per million, pH 7 and 58 degrees. |
1526036154 | 2018-05-10 | Drill / Deepen / Reopen | No Violations | During my inspection Patterson drilling rig 577 was preparing to pick up the bottom hole assembly with the 17.5 inch diameter bit to spud the surface section of the wellbore. The 13.375 inch diameter surface casing was being hauled on to location and placed on the pipe racks. I spoke with the Ascent company man and he stated that the cement job for the 13.375 inch casing will possibly be Friday evening on 5/11/18. |
1536621378 | 2018-09-10 | Completion Testing | No Violations | The purpose of my inspection was a status check on drilling out frac plugs. During my inspection Deep Well Services was rigging down and preparing to move off location. The frac plugs have not yet been drilled out and the well was equipped with a Frac valve. |
25963081 | 2020-1-29 0:00: | PW | No Violations | 0.10 |
7103977 | 2019-2-19 0:00: | CT | No Violations | 0.20 |
881288474 | 2018-10-30 0:00 | PL | No Violations | 0.20 |
942577829 | 2019-11-19 0:00 | PW | No Violations | 0.20 |
For data sources see[9]