If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24523 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.12,"lon":-81.34,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Londonderry Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-000908 | |
Farm/Lease Name: RED HILL FARM SE MDS GR | |
License Status: Producing | |
License Date: 2018-05-25 | |
Spud Date: 2018-06-26 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-09-03 | |
Well Total Depth: 21059.00 ft | |
Configuration: Horizontal | |
Latitude: 40.120000 | |
Longitude: -81.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-05-25 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:5/25/2018, Expired Date:5/24/2020 12:00:00 PM, Drilling unit acres:708.437, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-09-03 | |
Correction to Well | 2018-12-21 | UPDATE TAKE.TARGET PER AS-DRILLED PLAT |
Record Last Modified | 2019-06-11 | |
Construction Permit Expires | 2020-05-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
20770 | 20872 | 0 | |
7550 | 7702 | 0 | |
7550 | 7702 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/05/2018 | 11/25/2018 | 7440 | 15,832,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-Bac 1005 | UPP | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.000972948 | 1477.3 |
Polyethylene glycol | 7732-18-5 | 50 | 0.00844573 | 12823.8 | ||||
Water | 7732-18-5 | 44.3 | 0.00748292 | 11361.9 | ||||
HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.104904 | 159283 | |
FR-11 | UPP | Friction reducer | Ammonium Chloride | 12125-02-9 | 2 | 0.00111207 | 1688.54 | |
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00166811 | 2532.81 | ||||
Water | 7732-18-5 | 55 | 0.030582 | 46434.9 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00166811 | 2532.81 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.00834055 | 12664.1 | ||||
CHEMPLEX-Polymer_00019 | Trade Secret | 25 | 0.0139009 | 21106.8 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0139009 | 21106.8 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000556036 | 844.27 | ||||
Unihib G | UPP | Acid inhibitor | Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000546909 | 830.411 | |
Butyl diglycol | 112-34-5 | 75 | 0.000820363 | 1245.62 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001094 | 16.608 | ||||
Methanol | 67-56-1 | 5 | 0.00005469 | 83.041 | ||||
Thiourea | 62-56-6 | 1 | 0.00001094 | 16.608 | ||||
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.0177 | 132,125,000.0 | |
Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 11.4658 | 17,409,400.0 | |
I-7L | UPP | Iron Control | Ammonium glycolate | 35249-89-9 | 20 | 0.00145842 | 2214.43 | |
Ethylene glycol | 107-21-1 | 20 | 0.00145842 | 2214.43 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000364606 | 553.607 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Polyethylene glycol | 7732-18-5 | 50 | 0.00844573 | 12823.8 | |
Methanol | 67-56-1 | 5 | 0.00005469 | 83.041 | ||||
Ethylene glycol | 107-21-1 | 20 | 0.00145842 | 2214.43 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000556036 | 844.27 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.0101701 | 15442 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.00111207 | 1688.54 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.00834055 | 12664.1 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001094 | 16.608 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00166811 | 2532.81 | ||||
Water | 7732-18-5 | 44.3 | 0.00748292 | 11361.9 | ||||
Thiourea | 62-56-6 | 1 | 0.00001094 | 16.608 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000546909 | 830.411 | ||||
Water | 7732-18-5 | 55 | 0.030582 | 46434.9 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0139009 | 21106.8 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000364606 | 553.607 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00166811 | 2532.81 | ||||
Scale Hib PE-18 | UPP | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 30 | 0.00762757 | 11581.5 | |
Ethylene glycol | 107-21-1 | 40 | 0.0101701 | 15442 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 83692 | 27047 | 41 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 3011 | 41 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1278389989 | 2019-12-12 0:00 | PW | No Violations | 0.10 |
-1767540783 | 2020-6-22 0:00: | PW | No Violations | 1.00 |
-304261920 | 2018-12-28 0:00 | PL | No Violations | 0.10 |
-442475883 | 2019-1-14 0:00: | CT | No Violations | 0.50 |
-506630900 | 2018-6-28 0:00: | CS | No Violations | 1.40 |
-835393595 | 2019-2-21 0:00: | PW | No Violations | 0.30 |
-948953175 | 2019-1-18 0:00: | CT | No Violations | 0.30 |
0304261920 | 2018-12-28 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. There were a total of 7 wells on pad, three remain temporarily abandoned, and four had just completed hydraulic stimulation operations and are awaiting drill-out and flow back operations. Frac equipment was demobilizing off pad. The location meets the requirements for preliminary restorations within the Ohio Revised Code 1509.072 (A). |
0442475883 | 2019-01-14 | Completion Testing | No Violations | On the day of my inspection the production company Ascent has a Fortis service rig over the well with snubbing unit to drill the frac plugs out. They were pressure testing the Blow Out Prevention equipment and the treatment lines and pumps. I spoke with company man Chuck Davies on the progress of the work. |
0506630900 | 2018-06-28 | Casing String Witnessed | No Violations | The inspection was conducted as a casing string. The temperature is 82 degrees Fahrenheit. Ascent is setting 30-inch conductor pipe in 36-inch open hole. The tin horn measures 10 foot across and 13 feet deep. The 30-inch conductor inside diameter is 29.25 inch and weighs 118.76 lbs. /ft. The rig ran the conductor pipe to 100-foot-deep and had a shoe of 10 foot on the bottom. O-tex cementing services had mixed 67.3 barrels of slurry and displaced down with 75 barrels of fresh water. The slurry was mixed with 50 percent excess. There was good circulation with 8 barrels of slurry returns. |
0835393595 | 2019-02-21 | Production Wells | No Violations | The purpose of my inspection was a status check on flow back operations. During my inspection the well was equipped with a production tree style wellhead with open valves. The flow back equipment on location consisted of three gas buster tanks, one frac tank, and three horizontal line heaters. The production equipment on location consisted on seven sand traps, seven gas production units, three horizontal heater treaters, four compressors, six 400-barrel tanks, five 500-barrel tanks, two vapor recovery towers, and one combustor. |
0948953175 | 2019-01-18 | Completion Testing | No Violations | The purpose of my inspection was a status check on drilling out frac plugs. During my inspection Fortis Energy Services had a derrick service rig on location. Frac plugs have been drilled out and 6.5 pound per foot 2.875-inch diameter production tubing had been installed. |
1107289063 | 2018-10-11 | Drill / Deepen / Reopen | No Violations | During my inspection Patterson 577 was no longer on location, drilling operations have been completed, and the well was awaiting to be completed. |
1383812175 | 2018-08-19 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness the cementing of the surface casing. 13.35-inch diameter surface casing was ran to 1235 feet within the 17.5 inch diameter borehole. During my inspection I witnessed C&J Services O-Tex Cementing rig up on location. A safety meeting was held with all personnel on location. Following the safety meeting O-Tex pumped 50 barrels of gel, 10 barrels of fresh water, 1165 sacks (251 barrels) of class A cement, and 185 barrels for displacement. The cement was weighed in pressurized mud scales confirming the weight of 15.6 pounds per gallon. Cement returns established. |
1418175537 | 2019-03-18 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with open valves. Gauges present read 0 pounds per square inch on the 13.375-inch diameter surface casing, 0 pounds per square inch on the 9.625-inch diameter intermediate casing, 3000 pounds per square inch on the 5.5-inch diameter production casing, 2700 pounds per square inch on the production tubing. The production equipment on location consisted on seven sand traps, seven gas production units, three horizontal heater treaters, four compressors, six 400-barrel tanks, five 500-barrel tanks, two vapor recovery towers, and one combustor. |
For data sources see[9]