34-059-24532

Well Details

Well ID: 34-059-24532
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Richland Township
Operator Name: UTICA RESOURCE OPERATING LLC
Well Pad ID: US-OH-000877
Farm/Lease Name: DYNAMITE
License Status: Producing
License Date: 2018-09-14
Spud Date: 2018-09-21
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2019-01-09
Well Total Depth: 20214.00 ft
Configuration: Horizontal
Latitude: 39.970000
Longitude: -81.420000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-09-14 Proposed Formations:POINT PLEASANT /UTICA SHALE, Issued Date:9/14/2018, Expired Date:9/13/2020 12:00:00 PM, Drilling unit acres:462.578, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-01-09
Record Last Modified 2019-03-26
Construction Permit Expires 2020-09-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
19860 19980 0
7782 7904 0
7782 7904 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1023338959 2019-7-1 0:00:0 PW No Violations 0.30
-108313279 2018-10-9 0:00: DD No Violations 0.20
-1126367047 2020-1-24 0:00: PW No Violations 0.20
-1413044061 2019-12-11 0:00 PW No Violations 0.10
-1457848575 2019-4-15 0:00: CT No Violations 0.50
-1490176111 2019-1-17 0:00: DD No Violations 0.40
-1760346139 2018-10-15 0:00 DD No Violations 0.50
-1986019001 2018-12-30 0:00 DD No Violations 0.40
-411384964 2018-12-29 0:00 DD No Violations 0.10
-504010071 2018-11-19 0:00 DD No Violations 1.00
-609003421 2018-10-11 0:00 DD No Violations 0.20
-670743359 2019-2-6 0:00:0 PL No Violations 0.20
0108313279 2018-10-09 Drill / Deepen / Reopen No Violations During my inspection the well consisted of a 30-inch diameter conductor. The pad was being prepared for a top-hole rig to arrive and drill the surface borehole. Rig components were being brought on location.
0114588093 2018-11-05 Drill / Deepen / Reopen No Violations During my inspection I spoke with Company Man Dave Gray and he stated that Patterson 342 should be arriving on location today and hopefully start drilling on the 7H by Friday. There was not a rig on location. The well was equipped with a night cap with the 30-inch diameter conductor, the 20-inch diameter surface casing, and the 13.375-inch diameter first intermediate all installed and cemented to surface.
0411384964 2018-12-29 Drill / Deepen / Reopen No Violations
0449869265 2018-10-22 Drill / Deepen / Reopen No Violations The 13.375-inch diameter Intermediate casing was set at 1895 feet and cemented to surface on 10/17/18. During my inspection today, the rig was preparing to skid over to the 8H after drilling the 12.25-inch diameter intermediate number 2 borehole to 3912 feet.
0504010071 2018-11-19 Drill / Deepen / Reopen No Violations

- inch casing at Thanksgiving.

0609003421 2018-10-11 Drill / Deepen / Reopen No Violations During my inspection Fountain Qual Rig 4 was rigged up on location and preparing to spud the surface borehole. Dave Grey was the company Man on location for Utica Resources. The 20-inch diameter surface casing was on the pipe racks. Mr. Grey stated that the 4 production wells were currently production.
0670743359 2019-02-06 Preliminary Restoration No Violations Drilling operations have been completed and the well was awaiting completion. During my inspection the wells were equipped with a night cap and the wellheads were not assembled. The location meets requirements for preliminary restoration.
114588093 2018-11-5 0:00: DD No Violations 0.10
1322190688 2019-04-25 Completion Testing No Violations The purpose of my inspection was a status check on drill out operations. During my inspection standalone snubbing unit rig 10 was on location and rigged up on the 8H well. The snubbing unit was utilizing a 2.875-inch diameter tubing as their working string and they will be installing 2.375-inch diameter tubing for production. The 7H well has not been drilled out yet. Utica Resources Bub Six and Catlin Ball were on location.
1457848575 2019-04-15 Completion Testing No Violations The purpose of my inspection was a status check. During my inspection hydraulic stimulation operations had recently been completed and the well was being prepared for drill-out. 4 frac tanks 1 gas buster were staged on pad. I spoke with Utica Resources Company Man Catlin Ball and he stated that they were waiting on the arrival of the workover rig to complete drill out operations.
1490176111 2019-01-17 Drill / Deepen / Reopen No Violations
1538410481 2018-09-25 Drill / Deepen / Reopen No Violations On 9/21/18 a 30 inch diameter conductor was cemented in a 36 inch diameter borehole at 100 feet in depth. Accompanied by ODNR Kenn Frye, during our inspection today cement was at the base of the cellar and cuttings from the conductors were being used to increase the height of the pad berms.
1540219825 2018-10-17 Casing String Witnessed No Violations Fountain Qual Top-Hole rig #4 was running 13.375-inch diameter intermediate casing. The 17.5-inch borehole was drilled to 1926 feet. I spoke with Larry, the company man on location and he stated that the cement job would be late tonight or early tomorrow morning.
1541776873 2018-11-09 Drill / Deepen / Reopen No Violations During my inspection Patterson 343 was rigging up on location. The sub base was set over the well and cranes were on location preparing to stand the derrick up.
1543906687 2018-12-03 Drill / Deepen / Reopen No Violations

- inch casing to 6421 feet. There was a two- stage tool ran to depth 2841.11 feet. Gas block cement was ran on the first and second stage. The 9 5/8- inch casing weighs 40 lb. /ft and was 8 round threads. The grade was n-80 and j-55 grade on the pipe. The rig is moving over to 059-24533.

1547444295 2019-01-11 Drill / Deepen / Reopen No Violations The inspection was conducted as a simultaneous operation inspection on a drilling- operations. The well at total depth of 20,228 feet was reached on 1-9-19. Dave Gray called and stated that they would be cleaning up the well bore and tripping all drill pipe and bottom hole assembly out of the well. The inspection today revealed that Patterson rig 343 was running 5 1/2inch casing and was a depth of 11,000 feet.
1760346139 2018-10-15 Drill / Deepen / Reopen No Violations During my inspection Fountain Qual rig 8 was preparing to spud the first intermediate 17.5 inch diameter borehole. The 24 inch diameter surface borehole was drilled to a total depth of 360 feet and 20 inch diameter surface casing was cemented to surface from 340 feet in depth on 10/12/18.
1986019001 2018-12-30 Drill / Deepen / Reopen No Violations
449869265 2018-10-22 0:00 DD No Violations 0.20
561588420 2019-10-17 0:00 PW No Violations 0.30

For data sources see[4]

References