If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20618 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.21,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Freeport Township | |
Operator Name: BANDS GROUP LLC | |
Well Pad ID: | |
Farm/Lease Name: SAYRE LEASE | |
License Status: Plugged and Abandoned | |
License Date: 2017-02-17 | |
Spud Date: 1985-06-23 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1985-06-30 | |
Well Total Depth: 6033.00 ft | |
Configuration: Vertical | |
Latitude: 40.210000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-06-07 | 311 STOCKER & SITLER INC GeoDate 6/7/83 |
Oil and Gas | 1983-06-07 | Issued Date 6/7/83 Expired Date 12/4/83 Acres 0052960 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1984-10-01 | 311 STOCKER & SITLER INC GeoDate 10/1/84 |
Oil and Gas | 1984-10-01 | Issued Date 10/1/84 Expired Date 3/30/85 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1985-06-04 | 311 STOCKER & SITLER INC GeoDate 6/4/85 |
Oil and Gas | 1985-06-04 | Issued Date 6/4/85 Expired Date 12/1/85 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 06033 Proposed Drill Depth 06033 |
Original Spud | 1985-06-24 | R.I. 6-8-85, R.I. 10-6-84, LOG TYPE=QUICK LOOK |
Completed | 1985-06-30 | R.I. 6-8-85, R.I. 10-6-84, LOG TYPE=QUICK LOOK |
Reached Total Depth | 1985-06-30 | R.I. 6-8-85, R.I. 10-6-84, LOG TYPE=QUICK LOOK |
Completion Report Received | 1985-08-29 | R.I. 6-8-85, R.I. 10-6-84, LOG TYPE=QUICK LOOK |
Change of Owner | 2000-12-01 | Operator changed from 311, STOCKER & SITLER INC to 1966, PETROX INC |
Change of Owner | 2001-01-11 | Operator changed from 1966, PETROX INC to 6270, GAS & OIL PIPE SUPPLY |
Change of Owner | 2005-08-01 | Operator changed from 6270, GAS & OIL PIPE SUPPLY to 30, BANDS CO INC |
Change of Owner | 2015-01-01 | Operator changed from 30, BANDS CO INC to 9384, BANDS GROUP LLC |
APP | 2017-02-17 | Proposed Formations:CLINTON, Issued Date:2/17/2017, Expired Date:2/17/2019 12:00:00 PM, Drilling unit acres:52.96, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2017-03-13 | R.I. 6-8-85, R.I. 10-6-84, LOG TYPE=QUICK LOOK |
Record Last Modified | 2017-10-20 | R.I. 6-8-85, R.I. 10-6-84, LOG TYPE=QUICK LOOK |
Construction Permit Expires | 2019-02-17 | R.I. 6-8-85, R.I. 10-6-84, LOG TYPE=QUICK LOOK |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5767 | 5885 | 0 |
5767 | 5885 | 0 | |
2006-09-11 | 5781 | 5884 | 25 |
5781 | 5884 | 25 | |
5767 | 5885 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2245 Bbl | 60000 | FRAC;H2O,SAND,CO2 | ||
CO2 | 0 | 22 Tons | 0 | CO2=21 1/2 TONS LIQ. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | STOCKER & SITLER INC | 695.00 | 0.00 | 0 |
1986 | STOCKER & SITLER INC | 8653.00 | 0.00 | 365 |
1987 | STOCKER & SITLER INC | 18869.00 | 176.00 | 365 |
1988 | STOCKER & SITLER INC | 4682.00 | 0.00 | 0 |
1989 | STOCKER & SITLER INC | 3791.00 | 205.00 | 365 |
1990 | STOCKER & SITLER INC | 7465.00 | 384.00 | 365 |
1991 | STOCKER & SITLER INC | 8420.00 | 0.00 | 365 |
1992 | STOCKER & SITLER INC | 8107.00 | 79.00 | 365 |
1993 | STOCKER & SITLER INC | 6478.00 | 0.00 | 365 |
1994 | STOCKER & SITLER INC | 4648.00 | 0.00 | 0 |
1995 | STOCKER & SITLER INC | 4341.00 | 0.00 | 0 |
1996 | STOCKER & SITLER INC | 4622.00 | 88.00 | 0 |
1997 | STOCKER & SITLER INC | 3977.00 | 0.00 | 365 |
1998 | STOCKER & SITLER INC | 2819.00 | 0.00 | 365 |
1999 | STOCKER & SITLER INC | 2718.00 | 0.00 | 365 |
2000 | STOCKER & SITLER INC | 2448.00 | 95.00 | 365 |
2001 | GAS & OIL PIPE SUPPLY | 1520.00 | 0.00 | 365 |
2002 | GAS & OIL PIPE SUPPLY | 1868.00 | 0.00 | 365 |
2003 | GAS & OIL PIPE SUPPLY | 2785.00 | 0.00 | 365 |
2004 | GAS & OIL PIPE SUPPLY | 2870.00 | 0.00 | 365 |
2005 | BANDS COMPANY INC | 1029.00 | 0.00 | 365 |
2006 | BANDS COMPANY INC | 3924.00 | 67.00 | 365 |
2007 | BANDS COMPANY INC | 2878.00 | 0.00 | 365 |
2008 | BANDS COMPANY INC | 3372.00 | 0.00 | 365 |
2009 | BANDS COMPANY INC | 2602.00 | 57.00 | 365 |
2010 | BANDS COMPANY INC | 2222.00 | 0.00 | 365 |
2011 | BANDS COMPANY INC | 1938.00 | 0.00 | 365 |
2012 | BANDS COMPANY INC | 2008.00 | 0.00 | 366 |
2013 | BANDS COMPANY INC | 2129.00 | 20.00 | 365 |
2014 | BANDS COMPANY INC | 1743.00 | 0.00 | 365 |
2015 | BANDS GROUP LLC | 1798.00 | 0.00 | 365 |
2016 | BANDS GROUP LLC | 1108.00 | 0.00 | 365 |
2017 | BANDS GROUP LLC | 0.00 | 0.00 | 72 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | STOCKER & SITLER INC | Brine | 0 | 0 |
1986 | STOCKER & SITLER INC | Brine | 0 | 365 |
1987 | STOCKER & SITLER INC | Brine | 0 | 365 |
1988 | STOCKER & SITLER INC | Brine | 0 | 0 |
1989 | STOCKER & SITLER INC | Brine | 0 | 365 |
1990 | STOCKER & SITLER INC | Brine | 0 | 365 |
1991 | STOCKER & SITLER INC | Brine | 0 | 365 |
1992 | STOCKER & SITLER INC | Brine | 0 | 365 |
1993 | STOCKER & SITLER INC | Brine | 0 | 365 |
1994 | STOCKER & SITLER INC | Brine | 0 | 0 |
1995 | STOCKER & SITLER INC | Brine | 0 | 0 |
1996 | STOCKER & SITLER INC | Brine | 0 | 0 |
1997 | STOCKER & SITLER INC | Brine | 50 | 365 |
1998 | STOCKER & SITLER INC | Brine | 0 | 365 |
1999 | STOCKER & SITLER INC | Brine | 35 | 365 |
2000 | STOCKER & SITLER INC | Brine | 0 | 365 |
2001 | GAS & OIL PIPE SUPPLY | Brine | 0 | 365 |
2002 | GAS & OIL PIPE SUPPLY | Brine | 0 | 365 |
2003 | GAS & OIL PIPE SUPPLY | Brine | 0 | 365 |
2004 | GAS & OIL PIPE SUPPLY | Brine | 0 | 365 |
2005 | BANDS COMPANY INC | Brine | 75 | 365 |
2006 | BANDS COMPANY INC | Brine | 55 | 365 |
2007 | BANDS COMPANY INC | Brine | 0 | 365 |
2008 | BANDS COMPANY INC | Brine | 75 | 365 |
2009 | BANDS COMPANY INC | Brine | 0 | 365 |
2010 | BANDS COMPANY INC | Brine | 0 | 365 |
2011 | BANDS COMPANY INC | Brine | 75 | 365 |
2012 | BANDS COMPANY INC | Brine | 0 | 366 |
2013 | BANDS COMPANY INC | Brine | 57 | 365 |
2014 | BANDS COMPANY INC | Brine | 22 | 365 |
2015 | BANDS GROUP LLC | Brine | 0 | 365 |
2016 | BANDS GROUP LLC | Brine | 0 | 365 |
2017 | BANDS GROUP LLC | Brine | 0 | 72 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1161001891 | 2016-12-21 0:00 | PW | No Violations | 1.50 |
0688705643 | 2018-02-01 | Production Wells | No Violations | On the day of my inspection I found an earthen containment with a 210 barrel steel tank, horizontal seperator, and concrete brine vault. The production equipment has been sold to the landowner but the concrete brine vault must be cleaned and removed prior to doing a final restoration. Tank is identified. Compliance notices 1479233221 and 1479910123 previously issued can be passed as well has been plugged. |
1161001891 | 2016-12-21 | Production Wells | No Violations | I am on site today accompanied by Inspector Randy Akins to perform a follow up inspection on a compliance issue. On the day of my inspection I discovered the well is still shut in and H2S readings of around 118 parts per million were collected on the 4.5 inch diameter well head. |
1479233221 | 2016-11-15 | Production Wells | Violations Noted | I am on site today to conduct a pre exempt transfer inspection. With the conduction of my inspection I discovered the permitted well bore is utilizing a plunger lift system for means of production. The casing program for the well consists of 8.625 inch diameter surface casing, 4.5 inch diameter production casing and 1.5 inch diameter production tubing. The plunger is set up to be operated by a motor valve or with manual valves. Upon my arrival at the well head an odor of H2S could be smelled and gas could be heard coming from the well bore. After inspecting the well head I discovered severe corrosion on the valves that controlled the well and also severe corrosion on the production tubing and production casing above their well heads. I then gathered gas readings with my Industrial Scientific Tango TX1 hydrogen sulfide meter and received H2S readings at 375 ppm around the well head. Production equipment for the well consists of a 140 barrel production tank and a horizontal separator. The production equipment was placed in an earthen dike that measured approximately 40*40 feet with an average height of 2 foot around the perimeter of the dike. Also placed in the earthen dike was the production equipment for permitted well number 34-067-2-0356 (Sayre #1) which consisted of a 210 barrel production tank and a horizontal separator. Over the duration of my inspection of the well head and the production equipment I did not witness any signs or indications that a domestic hook up was present or that any domestic gas was being used. Proper identification was placed on the production tank and at the well head. The well owner/operator shall submit a written plugging schedule to Joe Zollars at 2207 Reiser Ave. S.E. New Philadelphia, Ohio 44663 within 30 days, per OAC 1501:9-11-05(B), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. |
1479910123 | 2016-11-15 | Production Wells | Violations Noted | I am on site today to conduct a pre exempt transfer inspection. With the conduction of my inspection I discovered the permitted well bore is utilizing a plunger lift system for means of production. The casing program for the well consists of 8.625 inch diameter surface casing, 4.5 inch diameter production casing and 1.5 inch diameter production tubing. The plunger is set up to be operated by a motor valve or with manual valves. Upon my arrival at the well head an odor of H2S could be smelled and gas could be heard coming from the well bore. After inspecting the well head I discovered severe corrosion on the valves that controlled the well and also severe corrosion on the production tubing and production casing above their well heads. I then gathered gas readings with my Industrial Scientific Tango TX1 hydrogen sulfide meter and received H2S readings at 375 ppm around the well head. Production equipment for the well consists of a 140 barrel production tank and a horizontal separator. The production equipment was placed in an earthen dike that measured approximately 40*40 feet with an average height of 2 foot around the perimeter of the dike. Also placed in the earthen dike was the production equipment for permitted well number 34-067-2-0356 (Sayre #1) which consisted of a 210 barrel production tank and a horizontal separator. Over the duration of my inspection of the well head and the production equipment I did not witness any signs or indications that a domestic hook up was present or that any domestic gas was being used. Proper identification was placed on the production tank and at the well head. The well owner/operator shall submit a written plugging schedule to Joe Zollars at 2207 Reiser Ave. S.E. New Philadelphia, Ohio 44663 within 30 days, per OAC 1501:9-11-05(B), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. |
1521040418 | 2017-08-22 | Production Wells | No Violations | On the day of my inspection I found an earthen containment with a 210 barrel steel tank, horizontal seperator, and concrete brine vault. Phone call to Inspector Randy Adkins indicated that this well, as well as permit 20356 have both been plugged. The production equipment has been sold to the landowner but the concrete brine vault must be cleaned and removed prior to doing a final restoration. Tank is identified. |
688705643 | 2018-2-1 0:00:0 | PW | No Violations | 1.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1479233221 | US-OH-113690 | 2016-12-13 | Defective casing, leaking well | |
1479910123 | US-OH-113701 | 2016-11-25 | Well operation causing pollution and contamination | |
1479910123 | US-OH-113702 | 2016-11-25 | General Safety | |
1479910123 | US-OH-113703 | 2016-11-25 | Well insufficiently equipped to prevent escape of oil and gas | |
1479910123 | US-OH-113704 | 2016-11-25 | Well shall be plugged | |
1479910123 | US-OH-113705 | 2016-11-25 | Defective casing, leaking well |
For data sources see[9]