If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20681 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.24,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Franklin Township | |
Operator Name: ATLAS NOBLE LLC | |
Well Pad ID: | |
Farm/Lease Name: A HARSHEY | |
License Status: Final Restoration | |
License Date: 2012-10-22 | |
Spud Date: 1984-09-10 | |
Spud Drilling Contractor: CHM DRLG | |
Final Drill Date: 1984-09-13 | |
Well Total Depth: 5716.00 ft | |
Configuration: Vertical | |
Latitude: 40.360000 | |
Longitude: -81.240000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1984-09-04 | 43 RESOURCE AMERICA INC GeoDate 9/4/84 |
Oil and Gas | 1984-09-04 | Issued Date 9/4/84 Expired Date 3/3/85 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05716 Proposed Drill Depth 05716 |
Original Spud | 1984-09-10 | |
Completed | 1984-09-13 | |
Reached Total Depth | 1984-09-13 | |
Completion Report Received | 1984-12-13 | |
Change of Owner | 2004-03-12 | Operator changed from 43, RESOURCE AMERICA INC to 6867, ATLAS AMERICA INC |
Change of Owner | 2011-01-27 | Operator changed from 6867, ATLAS AMERICA LLC to 6866, ATLAS NOBLE LLC |
Change of Owner | 2011-02-08 | Operator changed from 6867, ATLAS AMERICA LLC to 6866, ATLAS NOBLE LLC |
APP | 2012-10-22 | Proposed Formations:CLINTON, Issued Date:10/22/2012, Expired Date:10/22/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2014-03-12 | |
Construction Permit Expires | 2014-10-22 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5457 | 5527 | 0 |
5457 | 5527 | 0 | |
2006-09-11 | 5486 | 5524 | 48 |
5486 | 5524 | 48 | |
5457 | 5527 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | FRAC: H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | RESOURCE AMERICA INC | 0.00 | 0.00 | 365 |
1985 | RESOURCE AMERICA INC | 9984.00 | 384.00 | 365 |
1987 | RESOURCE AMERICA INC | 3572.00 | 387.00 | 365 |
1988 | RESOURCE AMERICA INC | 2082.00 | 305.00 | 365 |
1989 | RESOURCE AMERICA INC | 1206.00 | 292.00 | 365 |
1990 | RESOURCE AMERICA INC | 939.00 | 195.00 | 365 |
1991 | RESOURCE AMERICA INC | 1276.00 | 239.00 | 365 |
1993 | RESOURCE AMERICA INC | 730.00 | 89.00 | 306 |
1994 | RESOURCE AMERICA INC | 0.00 | 0.00 | 50 |
1995 | RESOURCE AMERICA INC | 460.00 | 0.00 | 40 |
1996 | RESOURCE AMERICA INC | 290.00 | 1040.00 | 71 |
1997 | RESOURCE AMERICA INC | 880.00 | 148.00 | 195 |
1998 | RESOURCE AMERICA INC | 1150.00 | 208.00 | 365 |
1999 | RESOURCE AMERICA INC | 1045.00 | 92.00 | 365 |
2000 | RESOURCE AMERICA INC | 1091.00 | 95.00 | 365 |
2001 | RESOURCE AMERICA INC | 963.00 | 0.00 | 324 |
2002 | RESOURCE AMERICA INC | 156.00 | 97.00 | 365 |
2003 | RESOURCE AMERICA INC | 0.00 | 0.00 | 365 |
2004 | CHEVRON APPALACHIA LLC | 0.00 | 0.00 | 365 |
2005 | CHEVRON APPALACHIA LLC | 0.00 | 0.00 | 365 |
2006 | CHEVRON APPALACHIA LLC | 0.00 | 0.00 | 365 |
2007 | CHEVRON APPALACHIA LLC | 0.00 | 0.00 | 365 |
2008 | CHEVRON APPALACHIA LLC | 0.00 | 0.00 | 366 |
2009 | CHEVRON APPALACHIA LLC | 0.00 | 0.00 | 365 |
2010 | ATLAS NOBLE LLC | 0.00 | 0.00 | 365 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0.00 | 365 |
2012 | ATLAS NOBLE LLC | 0.00 | 0.00 | 0 |
2013 | ATLAS NOBLE LLC | 0.00 | 0.00 | 0 |
2014 | ATLAS NOBLE LLC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | RESOURCE AMERICA INC | Brine | 0 | 365 |
1985 | RESOURCE AMERICA INC | Brine | 459 | 365 |
1987 | RESOURCE AMERICA INC | Brine | 0 | 365 |
1988 | RESOURCE AMERICA INC | Brine | 0 | 365 |
1989 | RESOURCE AMERICA INC | Brine | 0 | 365 |
1990 | RESOURCE AMERICA INC | Brine | 56 | 365 |
1991 | RESOURCE AMERICA INC | Brine | 0 | 365 |
1993 | RESOURCE AMERICA INC | Brine | 0 | 306 |
1994 | RESOURCE AMERICA INC | Brine | 0 | 50 |
1995 | RESOURCE AMERICA INC | Brine | 0 | 40 |
1996 | RESOURCE AMERICA INC | Brine | 0 | 71 |
1997 | RESOURCE AMERICA INC | Brine | 0 | 195 |
1998 | RESOURCE AMERICA INC | Brine | 302 | 365 |
1999 | RESOURCE AMERICA INC | Brine | 0 | 365 |
2000 | RESOURCE AMERICA INC | Brine | 0 | 365 |
2001 | RESOURCE AMERICA INC | Brine | 0 | 324 |
2002 | RESOURCE AMERICA INC | Brine | 182 | 365 |
2003 | RESOURCE AMERICA INC | Brine | 0 | 365 |
2004 | CHEVRON APPALACHIA LLC | Brine | 70 | 365 |
2005 | CHEVRON APPALACHIA LLC | Brine | 0 | 365 |
2006 | CHEVRON APPALACHIA LLC | Brine | 0 | 365 |
2007 | CHEVRON APPALACHIA LLC | Brine | 0 | 365 |
2008 | CHEVRON APPALACHIA LLC | Brine | 0 | 366 |
2009 | CHEVRON APPALACHIA LLC | Brine | 0 | 365 |
2010 | ATLAS NOBLE LLC | Brine | 0 | 365 |
2011 | CHEVRON APPALACHIA LLC | Brine | 0 | 365 |
2012 | ATLAS NOBLE LLC | Brine | 0 | 0 |
2013 | ATLAS NOBLE LLC | Brine | 0 | 0 |
2014 | ATLAS NOBLE LLC | Brine | 75 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1765152116 | 2015-7-9 0:00:0 | FR | No Violations | 2.00 |
-1904175785 | 2014-3-11 0:00: | PB | No Violations | 7.00 |
1394550382 | 2014-03-10 | Plug / Plug Back | No Violations | Arrive totday to begin plugging well to surface. NicksWell Plugging is on site with all of the equipment needed to plug the well. I found that they are at the break over point with time to begin plugging. Before they begin they want to be able to pull tubing out after setting the bottom plug. The job was later schduled for Tuesday at 8:00 am |
1394632016 | 2014-03-12 | Plug / Plug Back | No Violations | Arrive to plug the well and did not find any vehicles parked as they have been before. Both dozers are parked out front at the entrance and nobody has answered the phone. Wait to make sure they are plugging today because it is almost 1 mile off the road and it has been raining all night. Set # 2 plug and # 3 plug thru tubing and now they need to pull all of the tubing out so they can go in to rip casing. Inspector Grimm is to cover the remaining 2 plugs to surface. |
1765152116 | 2015-07-09 | Final Restoration | No Violations | Location has met 1509.072B requirements. |
1904175785 | 2014-03-11 | Plug / Plug Back | No Violations | Nicks Well Plugging has 2-3/8 inch diameter tubing set at 5450 ft and will set the bottom plug with 25 sks of class A cement. After the bottom plug is set they will pull up to 4717 ft and shoot off the tubing. Next they will shoot 15 holes in the 4-1/2 inch diameter casing and pull up to 3900 ft and shoot the 4-1/2 inch casing again. Then run tubing bask to 4717 ft and set # 2 plug and up to set # 3 plug before pulling all of the tubing out. Then go in and rip 4-1/2 casing and lay it all down run back to plug thru 2-3/8 tubing to surface. After shooting the tubing off Appalachian Well Service could not get back down the tubing to shoot the 4-1/2 inch casing. Nicks Well Service had to pull all of the tubing out and clear it, then run back in to shoot. They did get all of the shots in place and now the job is scheduled for Weds. @ 7:30 to start plugging. |
For data sources see[9]