If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20827 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.27,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Washington Township | |
Operator Name: D & D ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: MALESKI | |
License Status: Producing | |
License Date: 1987-12-09 | |
Spud Date: 1988-01-04 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1988-01-10 | |
Well Total Depth: 6025.00 ft | |
Configuration: Vertical | |
Latitude: 40.270000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1987-12-09 | 182 BELDEN & BLAKE CO GeoDate 12/9/87 |
Oil and Gas | 1987-12-09 | Issued Date 12/9/87 Expired Date 12/8/88 Acres 0080000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 06025 Proposed Drill Depth 06025 |
Original Spud | 1988-01-04 | CHG. ACG. 2-6-88 |
Completed | 1988-01-10 | CHG. ACG. 2-6-88 |
Reached Total Depth | 1988-01-10 | CHG. ACG. 2-6-88 |
Completion Report Received | 1988-04-05 | CHG. ACG. 2-6-88 |
Construction Permit Expires | 1988-12-08 | CHG. ACG. 2-6-88 |
Change of Owner | 2002-08-06 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
Change of Owner | 2005-07-08 | Operator changed from 1966, PETROX, INC to 5660, S & S ENERGY CORPORATION |
Change of Owner | 2015-06-02 | Operator changed from 5660, S & S ENERGY CORPORATION to 5569, D & D ENERGY COMPANY |
Record Last Modified | 2017-02-15 | CHG. ACG. 2-6-88 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5777 | 5904 | 0 |
5777 | 5904 | 0 | |
2006-09-11 | 5811 | 5898 | 40 |
5811 | 5898 | 40 | |
5777 | 5904 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 97000 Gal | 80000 | FRAC: H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | BELDEN & BLAKE CORPORATION | 1622.00 | 0.00 | 197 |
1991 | BELDEN & BLAKE CORPORATION | 3519.00 | 0.00 | 365 |
1992 | BELDEN & BLAKE CORPORATION | 1882.00 | 89.00 | 313 |
1993 | BELDEN & BLAKE CORPORATION | 2151.00 | 62.00 | 352 |
1994 | BELDEN & BLAKE CORPORATION | 1619.00 | 0.00 | 357 |
1995 | BELDEN & BLAKE CORPORATION | 1582.00 | 56.00 | 333 |
1996 | BELDEN & BLAKE CORPORATION | 1152.00 | 68.00 | 345 |
1997 | BELDEN & BLAKE CORPORATION | 1000.00 | 19.00 | 364 |
1998 | BELDEN & BLAKE CORPORATION | 1463.00 | 50.00 | 314 |
1999 | BELDEN & BLAKE CORPORATION | 1206.00 | 35.00 | 282 |
2000 | BELDEN & BLAKE CORPORATION | 845.00 | 30.00 | 344 |
2001 | BELDEN & BLAKE CORPORATION | 550.00 | 41.00 | 359 |
2002 | PETROX, INC | 511.00 | 18.00 | 56 |
2003 | PETROX, INC | 626.00 | 13.00 | 365 |
2004 | PETROX, INC | 373.00 | 12.00 | 365 |
2005 | PETROX, INC | 316.00 | 41.00 | 180 |
2006 | S & S ENERGY CORP | 309.00 | 0.00 | 365 |
2007 | S & S ENERGY CORP | 411.00 | 0.00 | 365 |
2008 | S & S ENERGY CORP | 226.00 | 37.00 | 365 |
2009 | S & S ENERGY CORP | 159.00 | 0.00 | 365 |
2010 | S & S ENERGY CORP | 373.00 | 0.00 | 365 |
2011 | S & S ENERGY CORP | 332.00 | 17.00 | 365 |
2012 | S & S ENERGY CORP | 387.00 | 37.00 | 366 |
2013 | S & S ENERGY CORP | 31.00 | 0.00 | 365 |
2014 | S & S ENERGY CORP | 9.00 | 0.00 | 365 |
2015 | D & D ENERGY COMPANY | 0.00 | 0.00 | 0 |
2016 | D & D ENERGY COMPANY | 0.00 | 0.00 | 0 |
2017 | D & D ENERGY COMPANY | 0.00 | 0.00 | 0 |
2018 | D & D ENERGY COMPANY | 13.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | BELDEN & BLAKE CORPORATION | Brine | 83 | 197 |
1991 | BELDEN & BLAKE CORPORATION | Brine | 46 | 365 |
1992 | BELDEN & BLAKE CORPORATION | Brine | 116 | 313 |
1993 | BELDEN & BLAKE CORPORATION | Brine | 138 | 352 |
1994 | BELDEN & BLAKE CORPORATION | Brine | 102 | 357 |
1995 | BELDEN & BLAKE CORPORATION | Brine | 105 | 333 |
1996 | BELDEN & BLAKE CORPORATION | Brine | 121 | 345 |
1997 | BELDEN & BLAKE CORPORATION | Brine | 92 | 364 |
1998 | BELDEN & BLAKE CORPORATION | Brine | 118 | 314 |
1999 | BELDEN & BLAKE CORPORATION | Brine | 89 | 282 |
2000 | BELDEN & BLAKE CORPORATION | Brine | 125 | 344 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 101 | 359 |
2002 | BELDEN & BLAKE CORPORATION | Brine | 51 | 192 |
2003 | PETROX, INC | Brine | 80 | 365 |
2004 | PETROX, INC | Brine | 35 | 365 |
2005 | PETROX, INC | Brine | 0 | 180 |
2006 | S & S ENERGY CORP | Brine | 0 | 365 |
2007 | S & S ENERGY CORP | Brine | 3 | 365 |
2008 | S & S ENERGY CORP | Brine | 0 | 365 |
2009 | S & S ENERGY CORP | Brine | 0 | 365 |
2010 | S & S ENERGY CORP | Brine | 0 | 365 |
2011 | S & S ENERGY CORP | Brine | 74 | 365 |
2012 | S & S ENERGY CORP | Brine | 75 | 366 |
2013 | S & S ENERGY CORP | Brine | 0 | 365 |
2014 | S & S ENERGY CORP | Brine | 0 | 365 |
2015 | D & D ENERGY COMPANY | Brine | 0 | 0 |
2016 | D & D ENERGY COMPANY | Brine | 15 | 0 |
2017 | D & D ENERGY COMPANY | Brine | 0 | 0 |
2018 | D & D ENERGY COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-460331890 | 2015-4-17 0:00: | PW | No Violations | 0.50 |
0460331890 | 2015-04-17 | Production Wells | No Violations | On the date of inspection I found production equipment to include a 100bbl tank, a 50bbl plastic brine tank, a drip, and horizontal separator within a partial earthen dike. The well is equipped with a gas plunger lift system, 1.5 inch tubing, 4.5 inch casing, and 8.625 inch casing. The tubing valve is in closed position and one casing valve is partially open to a domestic gas line. All valves connected to flow line are in closed position. Production records for 2013 did not meet minimum for commercial production. Production has not yet been reported for 2014. |
1168274110 | 2017-08-23 | Production Wells | No Violations | On the day of my inspection I found this plunger lift well equipped with 4.5 inch diameter caisng and 1.9 inch diameter tubing. RBDMS shows no production since 2014. Tubing valve is closed and a partially open valve on 4.5 inch diameter casing going to domestic meter. Production equipment includes a 100 barrel steel tank, 40 barrel poly tank, horizontal seperator, and meter box with 1.25 inch diameter sales line orfice, all contained in an earthen dike. Tank is not plumbed to seperator. Chart indicates well is not producing. Tank is identified by name but not permit number. Wellhead has correct name and incorrect permit number, it should be 827 not 822, as shown on wellhead. |
For data sources see[9]