If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20828 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.27,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Washington Township | |
Operator Name: D & D ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: MALESKI | |
License Status: Producing | |
License Date: 1987-12-09 | |
Spud Date: 1988-08-08 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 1988-08-14 | |
Well Total Depth: 5966.00 ft | |
Configuration: Vertical | |
Latitude: 40.270000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1987-12-09 | 182 BELDEN & BLAKE CO GeoDate 12/9/87 |
Oil and Gas | 1987-12-09 | Issued Date 12/9/87 Expired Date 12/8/88 Acres 0080000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05966 Proposed Drill Depth 05966 |
Original Spud | 1988-08-08 | CHG. ACG. 2-13-88 |
Completed | 1988-08-14 | CHG. ACG. 2-13-88 |
Reached Total Depth | 1988-08-14 | CHG. ACG. 2-13-88 |
Completion Report Received | 1988-10-11 | CHG. ACG. 2-13-88 |
Construction Permit Expires | 1988-12-08 | CHG. ACG. 2-13-88 |
Change of Owner | 2002-08-06 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
Change of Owner | 2005-07-08 | Operator changed from 1966, PETROX, INC to 5660, S & S ENERGY CORPORATION |
Change of Owner | 2015-06-02 | Operator changed from 5660, S & S ENERGY CORPORATION to 5569, D & D ENERGY COMPANY |
Record Last Modified | 2017-02-15 | CHG. ACG. 2-13-88 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5720 | 5835 | 0 |
5720 | 5835 | 0 | |
2006-09-11 | 5738 | 5831 | 40 |
5738 | 5831 | 40 | |
5720 | 5835 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 97500 Gal | 80000 | FRAC:GELLED WATER/SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | BELDEN & BLAKE CORPORATION | 1432.00 | 0.00 | 202 |
1991 | BELDEN & BLAKE CORPORATION | 3255.00 | 0.00 | 365 |
1992 | BELDEN & BLAKE CORPORATION | 2214.00 | 158.00 | 348 |
1993 | BELDEN & BLAKE CORPORATION | 2002.00 | 0.00 | 353 |
1994 | BELDEN & BLAKE CORPORATION | 1318.00 | 109.00 | 365 |
1995 | BELDEN & BLAKE CORPORATION | 1100.00 | 0.00 | 365 |
1996 | BELDEN & BLAKE CORPORATION | 1518.00 | 92.00 | 357 |
1997 | BELDEN & BLAKE CORPORATION | 1520.00 | 0.00 | 253 |
1998 | BELDEN & BLAKE CORPORATION | 1178.00 | 0.00 | 230 |
1999 | BELDEN & BLAKE CORPORATION | 1079.00 | 0.00 | 268 |
2000 | BELDEN & BLAKE CORPORATION | 866.00 | 89.00 | 277 |
2001 | BELDEN & BLAKE CORPORATION | 619.00 | 0.00 | 338 |
2002 | PETROX, INC | 597.00 | 99.00 | 56 |
2003 | PETROX, INC | 526.00 | 47.00 | 365 |
2004 | PETROX, INC | 673.00 | 18.00 | 365 |
2005 | PETROX, INC | 401.00 | 0.00 | 180 |
2006 | S & S ENERGY CORP | 725.00 | 0.00 | 365 |
2007 | S & S ENERGY CORP | 545.00 | 0.00 | 365 |
2008 | S & S ENERGY CORP | 534.00 | 63.00 | 365 |
2009 | S & S ENERGY CORP | 254.00 | 0.00 | 365 |
2010 | S & S ENERGY CORP | 445.00 | 36.00 | 365 |
2011 | S & S ENERGY CORP | 513.00 | 0.00 | 365 |
2012 | S & S ENERGY CORP | 470.00 | 61.00 | 366 |
2013 | S & S ENERGY CORP | 430.00 | 9.00 | 365 |
2014 | S & S ENERGY CORP | 232.00 | 0.00 | 365 |
2015 | D & D ENERGY COMPANY | 240.00 | 0.00 | 365 |
2016 | D & D ENERGY COMPANY | 570.00 | 0.00 | 365 |
2017 | D & D ENERGY COMPANY | 251.00 | 59.00 | 365 |
2018 | D & D ENERGY COMPANY | 253.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | BELDEN & BLAKE CORPORATION | Brine | 121 | 202 |
1991 | BELDEN & BLAKE CORPORATION | Brine | 229 | 365 |
1992 | BELDEN & BLAKE CORPORATION | Brine | 108 | 348 |
1993 | BELDEN & BLAKE CORPORATION | Brine | 221 | 353 |
1994 | BELDEN & BLAKE CORPORATION | Brine | 66 | 365 |
1995 | BELDEN & BLAKE CORPORATION | Brine | 160 | 365 |
1996 | BELDEN & BLAKE CORPORATION | Brine | 204 | 357 |
1997 | BELDEN & BLAKE CORPORATION | Brine | 70 | 253 |
1998 | BELDEN & BLAKE CORPORATION | Brine | 75 | 230 |
1999 | BELDEN & BLAKE CORPORATION | Brine | 35 | 268 |
2000 | BELDEN & BLAKE CORPORATION | Brine | 156 | 277 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 153 | 338 |
2002 | BELDEN & BLAKE CORPORATION | Brine | 96 | 209 |
2003 | PETROX, INC | Brine | 0 | 365 |
2004 | PETROX, INC | Brine | 30 | 365 |
2005 | PETROX, INC | Brine | 0 | 180 |
2006 | S & S ENERGY CORP | Brine | 0 | 365 |
2007 | S & S ENERGY CORP | Brine | 0 | 365 |
2008 | S & S ENERGY CORP | Brine | 0 | 365 |
2009 | S & S ENERGY CORP | Brine | 0 | 365 |
2010 | S & S ENERGY CORP | Brine | 75 | 365 |
2011 | S & S ENERGY CORP | Brine | 145 | 365 |
2012 | S & S ENERGY CORP | Brine | 74 | 366 |
2013 | S & S ENERGY CORP | Brine | 72 | 365 |
2014 | S & S ENERGY CORP | Brine | 0 | 365 |
2015 | D & D ENERGY COMPANY | Brine | 0 | 365 |
2016 | D & D ENERGY COMPANY | Brine | 223 | 365 |
2017 | D & D ENERGY COMPANY | Brine | 47 | 365 |
2018 | D & D ENERGY COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0535940892 | 2017-08-23 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a 8.625 inch diameter wellhead, 4.5 inch diameter casing, 2.375 inch tubing, rods, domestic meter off 4.5 inch diameter casing, and walking beam pumping unit with an electric motor. Production equipment includes a 210 barrel steel tank, 40 barrel poly brine tank and horizontal separator. Meter box is equipped with 1.25 inch diameter sales line orifice, fresh chart, and valves were open on tubing and casing. Poly brine tank is outside of containment and the containment that holds 210 barrel tank does not have adequate storage volume for the contents of the tank. Tank is labeled incorrectly saying that this is a Tusc. County well. Production records current in RBDMS. |
1654345531 | 2015-04-17 | Production Wells | No Violations | On the date of inspection I found production equipment to include a 210bbl tank and a horizontal separator within a partial earthen dike. The well is equipped with a pumping unit, rods, 1.5 inch tubing, 4.5 inch casing, and 8.625 inch casing. The tubing valve is in open position and both casing valves are partially open, one connected to a domestic gas line. Identification is present and production records are current through 2013. |
535940892 | 2017-8-23 0:00: | PW | No Violations | 1.00 |
For data sources see[9]