Well ID: 34-067-20947 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Green Township | |
Operator Name: COAL GAS TRANSPORTATION LLC | |
Well Pad ID: | |
Farm/Lease Name: HARRISON MINING CORP | |
License Status: Final Restoration | |
License Date: 2015-12-07 | |
Spud Date: 1999-07-15 | |
Spud Drilling Contractor: CENTURY WELL SERVICES,INC | |
Final Drill Date: 1999-07-16 | |
Well Total Depth: 609.00 ft | |
Configuration: Vertical | |
Latitude: 40.270000 | |
Longitude: -80.950000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-07-01 | Proposed Formations:LOWER FREEPORT, Issued Date:7/1/99, Expired Date:6/30/00 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:CM, Proposed Well Class:ESPW |
Original Spud | 1999-07-15 | RBDMS Rec GMM STATUS WAS CHANED TO PA PER PLUG REPORT CHANGED SYMBOL TO PLUGGED GAS FROM CBM 2-14-17- KNR |
Completed | 1999-07-16 | RBDMS Rec GMM STATUS WAS CHANED TO PA PER PLUG REPORT CHANGED SYMBOL TO PLUGGED GAS FROM CBM 2-14-17- KNR |
Reached Total Depth | 1999-07-16 | RBDMS Rec GMM STATUS WAS CHANED TO PA PER PLUG REPORT CHANGED SYMBOL TO PLUGGED GAS FROM CBM 2-14-17- KNR |
Completion Report Received | 1999-07-26 | RBDMS Rec GMM STATUS WAS CHANED TO PA PER PLUG REPORT CHANGED SYMBOL TO PLUGGED GAS FROM CBM 2-14-17- KNR |
Change of Owner | 2005-03-11 | Operator changed from 6453, PENDRAGON ENERGY PTNRS INC to 5319, LAHD ENERGY INC |
Change of Owner | 2008-12-29 | Operator changed from 5319, LAHD ENERGY INC to 8454, COAL GAS TRANSPORTATION LLC |
APP | 2015-12-07 | Proposed Formations:LOWER FREEPORT 6A COAL SEAM, Issued Date:12/7/2015, Expired Date:12/6/2017 12:00:00 PM, Drilling unit acres:1, Proposed Well Type:CM, Proposed Well Class: |
Plugged/Abandoned | 2016-04-06 | RBDMS Rec GMM STATUS WAS CHANED TO PA PER PLUG REPORT CHANGED SYMBOL TO PLUGGED GAS FROM CBM 2-14-17- KNR |
Record Last Modified | 2017-05-25 | RBDMS Rec GMM STATUS WAS CHANED TO PA PER PLUG REPORT CHANGED SYMBOL TO PLUGGED GAS FROM CBM 2-14-17- KNR |
Construction Permit Expires | 2017-12-06 | RBDMS Rec GMM STATUS WAS CHANED TO PA PER PLUG REPORT CHANGED SYMBOL TO PLUGGED GAS FROM CBM 2-14-17- KNR |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | LAHD ENERGY INC | 39300.00 | 0.00 | 175 |
2001 | PENDRAGON ENERGY PTNRS INC | 19980.00 | 0.00 | 365 |
2002 | LAHD ENERGY INC | 10000.00 | 0.00 | 365 |
2003 | PENDRAGON ENERGY PTNRS INC | 18790.00 | 0.00 | 365 |
2004 | LAHD ENERGY INC | 20326.00 | 0.00 | 365 |
2005 | LAHD ENERGY INC | 3650.00 | 0.00 | 365 |
2006 | LAHD ENERGY INC | 7300.00 | 0.00 | 365 |
2007 | LAHD ENERGY INC | 1825.00 | 0.00 | 365 |
2008 | LAHD ENERGY INC | 0.00 | 0.00 | 344 |
2009 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2010 | COAL GAS TRANSPORTATION LLC | 238.00 | 0.00 | 60 |
2011 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2012 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2013 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2014 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2015 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | LAHD ENERGY INC | Brine | 0 | 175 |
2001 | PENDRAGON ENERGY PTNRS INC | Brine | 0 | 365 |
2002 | LAHD ENERGY INC | Brine | 0 | 365 |
2003 | PENDRAGON ENERGY PTNRS INC | Brine | 0 | 365 |
2004 | LAHD ENERGY INC | Brine | 0 | 365 |
2005 | LAHD ENERGY INC | Brine | 0 | 365 |
2006 | LAHD ENERGY INC | Brine | 0 | 365 |
2007 | LAHD ENERGY INC | Brine | 0 | 365 |
2008 | LAHD ENERGY INC | Brine | 0 | 344 |
2009 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2010 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 60 |
2011 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2012 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2013 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2014 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2015 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0207814453 | 2016-04-06 | Plug / Plug Back | No Violations | On site today accompanied by Inspector Mark Moreland to witness the plugging of this well bore. Cox Well Service will be providing a crane truck to run the 1.5 inch diameter tubing to set the plugs. Cemenco is the cement contractor preforming the cement work. Cox Well Service ran tubing to a depth of 590 feet to tag the bridge plug set inside the 4.5 inch diameter production casing (bon-log indicate cement was present on the backside all the way to surface) Appalachian Well Service set prior to the day of my inspection. Cemenco then established circulation and displaced cement to surface. Mark Clark (The contractor hired by the well owner to plug these wells) stated he would be back at a later date to top off the well bore with cement and cut the pipe 3 feet below ground level. |
0600619112 | 2016-03-15 | Plug / Plug Back | No Violations | I am on site accompanied by Inspector Mark Moreland to check on the static test of the well bore. A bridge plug was place inside the 7 inch diameter casing the previous day, in preparation for plugging the well bore. After the bridge plug was set the hole was then filled with fresh water to test the integrity of the bridge plug. On the day of my inspection I found that the bridge plug held indicating that the well could then be filled to surface with cement. |
0749415531 | 2016-04-07 | Plug / Plug Back | No Violations | |
1315839782 | 2016-04-04 | Plug / Plug Back | No Violations | I am on site today accompanied by inspector Mark Moreland, to witness Appalachian Well Service running a bond-log. The bond-log was ran a request by inspector Moreland, when the owner of the well stated that 4.5 inch diameter production casing was ran and cemented in place. The company provided documentation that indicated the 4.5 inch diameter pipe was placed in the well bore and cemented in place after an open hole collapse had occurred. However the documentation was not found in RBDMS records. With the conduction of the bond-log Mark and I witnessed the pipe was properly cemented. Mark then gave the approval to plug the well by using the bridge plug that was set in that 4.5 production casing and filling to surface. |
1434970579 | 2016-07-13 | Final Restoration | No Violations | On the day of my inspection, I found that the final restoration has been complete. The site passed final restoration according to ORC 1509.072(B). |
207814453 | 2016-4-6 0:00:0 | PB | No Violations | 5.00 |
600619112 | 2016-3-15 0:00: | PB | No Violations | 1.00 |
749415531 | 2016-4-7 0:00:0 | PB | No Violations | 3.00 |