If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20951 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.24,"lon":-81.01,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Cadiz Township | |
Operator Name: COAL GAS TRANSPORTATION LLC | |
Well Pad ID: | |
Farm/Lease Name: HARRISON CO COMMISSIONERS | |
License Status: Final Restoration | |
License Date: 2014-07-22 | |
Spud Date: 2000-03-06 | |
Spud Drilling Contractor: CENTURY WELL SERVICES,INC | |
Final Drill Date: 2000-03-07 | |
Well Total Depth: 600.00 ft | |
Configuration: Vertical | |
Latitude: 40.240000 | |
Longitude: -81.010000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-08-26 | Proposed Formations:LOWER FREEPORT, Issued Date:8/26/99, Expired Date:8/25/00 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:CM, Proposed Well Class:ESPW |
Original Spud | 2000-03-06 | RBDMS Rec GMM STATUS UPDATED TO PA PER PLUG REPORT - CHANGED SYMBOL FROM COALBEDMETHANE TO PLUGGED GAS PER PLUG REPORT 2-14-17 KNR |
Completed | 2000-03-07 | RBDMS Rec GMM STATUS UPDATED TO PA PER PLUG REPORT - CHANGED SYMBOL FROM COALBEDMETHANE TO PLUGGED GAS PER PLUG REPORT 2-14-17 KNR |
Reached Total Depth | 2000-03-07 | RBDMS Rec GMM STATUS UPDATED TO PA PER PLUG REPORT - CHANGED SYMBOL FROM COALBEDMETHANE TO PLUGGED GAS PER PLUG REPORT 2-14-17 KNR |
Completion Report Received | 2000-09-18 | RBDMS Rec GMM STATUS UPDATED TO PA PER PLUG REPORT - CHANGED SYMBOL FROM COALBEDMETHANE TO PLUGGED GAS PER PLUG REPORT 2-14-17 KNR |
Change of Owner | 2008-12-29 | Operator changed from 5319, LAHD ENERGY INC to 8454, COAL GAS TRANSPORTATION LLC |
APP | 2014-07-22 | Proposed Formations:LOWER FREEPORT 6A COAL SEAM, Issued Date:7/22/2014, Expired Date:7/21/2016 12:00:00 PM, Drilling unit acres:1, Proposed Well Type:CM, Proposed Well Class: |
Plugged/Abandoned | 2016-04-08 | RBDMS Rec GMM STATUS UPDATED TO PA PER PLUG REPORT - CHANGED SYMBOL FROM COALBEDMETHANE TO PLUGGED GAS PER PLUG REPORT 2-14-17 KNR |
Construction Permit Expires | 2016-07-21 | RBDMS Rec GMM STATUS UPDATED TO PA PER PLUG REPORT - CHANGED SYMBOL FROM COALBEDMETHANE TO PLUGGED GAS PER PLUG REPORT 2-14-17 KNR |
Record Last Modified | 2017-05-25 | RBDMS Rec GMM STATUS UPDATED TO PA PER PLUG REPORT - CHANGED SYMBOL FROM COALBEDMETHANE TO PLUGGED GAS PER PLUG REPORT 2-14-17 KNR |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | LAHD ENERGY INC | 1386.00 | 0.00 | 175 |
2001 | LAHD ENERGY INC | 2698.00 | 0.00 | 183 |
2002 | LAHD ENERGY INC | 1825.00 | 0.00 | 365 |
2003 | LAHD ENERGY INC | 1200.00 | 0.00 | 365 |
2004 | LAHD ENERGY INC | 1825.00 | 0.00 | 365 |
2005 | LAHD ENERGY INC | 189.00 | 0.00 | 365 |
2007 | LAHD ENERGY INC | 0.00 | 0.00 | 0 |
2008 | LAHD ENERGY INC | 0.00 | 0.00 | 0 |
2009 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2010 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2011 | COAL GAS TRANSPORTATION LLC | 267.00 | 0.00 | 334 |
2012 | COAL GAS TRANSPORTATION LLC | 112.00 | 0.00 | 59 |
2013 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2014 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
2015 | COAL GAS TRANSPORTATION LLC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | LAHD ENERGY INC | Brine | 0 | 175 |
2001 | LAHD ENERGY INC | Brine | 0 | 183 |
2002 | LAHD ENERGY INC | Brine | 0 | 365 |
2003 | LAHD ENERGY INC | Brine | 0 | 365 |
2004 | LAHD ENERGY INC | Brine | 0 | 365 |
2005 | LAHD ENERGY INC | Brine | 0 | 365 |
2007 | LAHD ENERGY INC | Brine | 0 | 0 |
2008 | LAHD ENERGY INC | Brine | 0 | 0 |
2009 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2010 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2011 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 334 |
2012 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 59 |
2013 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2014 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2015 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1724775015 | 2016-3-10 0:00: | PB | No Violations | 2.50 |
-1863635813 | 2016-4-19 0:00: | PB | No Violations | 1.00 |
-713944438 | 2016-5-26 0:00: | PB | No Violations | 1.00 |
0025906652 | 2016-04-12 | Plug / Plug Back | No Violations | |
0027487831 | 2016-07-13 | Final Restoration | No Violations | On the day of my inspection, I found that the final restoration has been complete. The site passed final restoration according to ORC 1509.072(B). |
0713944438 | 2016-05-26 | Plug / Plug Back | No Violations | One the day of my inspection I witnessed, the site could not pass final restoration due to lack of vegetation and production equipment being present on location. |
1458564111 | 2016-03-10 | Plug / Plug Back | No Violations | Appalachian was running in to check depth and run a bond log. I accompanied Joe Zellers on day of inspection. Company man was Mark Clark. |
1460375749 | 2016-04-08 | Plug / Plug Back | No Violations | Ran 4-1/2 casing to approximately 265 and Cemenco Services filled the well to the surface with cement. Good returns to the surface. Pulled the casing and topped off with cement back to the surface. Rigged down and moved the rig off. Left cement at the top of the hole. |
1724775015 | 2016-03-10 | Plug / Plug Back | No Violations | Appalachian Well Service is on site to run a CCL log inside the 4.5 inch diameter casing to indicate if there is a packer set on the backside of the casing, in order to discover what will need to be done to plug this well bore. After Appalachian ran the CCL log there was no indication that a packer was set on the 4 inch diameter casing. After the log I placed a call to Mark Moreland who informed me that a service rig will have to pull the casing in order to plug the well or a bon-log will need to be run to indicate if there is cement on the backside of the casing. I was accompanied by inspector Pat Shreve on the day of my inspection. |
1827353745 | 2016-04-07 | Plug / Plug Back | No Violations | I am on site where I witnessed Davis Well Service used a service rig to unset the packer and pull out 615 feet of 4.5 inch diameter surface casing. Appalachian Well Service is on site to set a wire line bridge plug inside the 7 inch diameter surface casing in preparation for plugging this well. Appalachian hit an obstruction in the hole at 315 feet. The last collar for the 7 inch diameter pipe was found at 300 feet. The bridge plug was then set at 285 feet. The well will be filled with cement on a later date. |
1863635813 | 2016-04-19 | Plug / Plug Back | No Violations | On the day of my inspection I witnessed the well location has been restored, but vegetation has yet to be established. I will return at a later date to indicate if the site can pass final restoration. |
2101445252 | 2015-03-09 | Production Wells | No Violations | I am on site accompanied by inspector Mark Moreland to meet with Mark Clark to review the plans on what will need to be done to plug the well bore. After approximately an hour of waiting we realized Mark was not going to show up. We then conducted a site overview and Mark informed of what shall be done to plug the well bore. |
25906652 | 2016-4-12 0:00: | PB | No Violations | 3.00 |
27487831 | 2016-7-13 0:00: | FR | No Violations | 1.00 |
iDIAN00456 | 2000-06-21 | Preliminary Restoration | No Violations | |
iDIAN004566 | 2000-6-21 0:00: | PL | No Violations |
For data sources see[8]