Well ID: 34-067-21076 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000315 | |
Farm/Lease Name: ADDY 9-12-6 | |
License Status: Producing | |
License Date: 2012-06-06 | |
Spud Date: 2012-07-31 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2012-08-14 | |
Well Total Depth: 14125.00 ft | |
Configuration: Horizontal | |
Latitude: 40.340000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-06-06 | Proposed Formations:POINT PLEASANT, Issued Date:6/6/2012, Expired Date:6/6/2014 12:00:00 PM, Drilling unit acres:171.9, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-08-14 | |
Correction to Well | 2012-11-09 | UNIT SIZE DECREASED TO 159.90 ACRES. CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES (FROM AS DRILLED SURVEY PLAT). |
Correction to Well | 2012-12-14 | UNIT SIZE DECREASED TO 159.71 ACRES. |
Completion Report Received | 2013-09-26 | |
Construction Permit Expires | 2014-06-06 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/11/2012 | 11/11/2012 | 7774.00 | 4,304,958.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | XLW-32 | Baker Hughes | Crosslinker | Methanol | 67-56-1 | 90.00 | 0.01 | |
Boric acid | 10043-35-3 | 20.00 | 0.00225000 | |||||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.00712000 | ||
BF-9L, CI-14, ENZYME G-NE, FERROTROL
300L, FRW-18, GW-3LDF, NE-900, SCALETROL 720 |
Baker Hughes | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, Non-Emulsifier, pH Adjusting Agent, Scale Inhibitor | Proprietary Silica | |||||
Proprietary Weak Acid | ||||||||
Proprietary Disinfectant | ||||||||
Proprietary Biocide | ||||||||
Proprietary Surfactant | ||||||||
Calcium chloride | 10043-52-4 | |||||||
Proprietary Polymer | ||||||||
Proprietary Alcohol | ||||||||
Proprietary Undisclosed by Supplier | ||||||||
Water | 7732-18-5 | |||||||
Proprietary Solvent | ||||||||
Hemicellulase Enzyme Concentrate | 9025-56-3 | |||||||
Proprietary Copolymer | ||||||||
Proprietary Acid | ||||||||
GW-3LDF | Baker Hughes | Gelling Agent | Polysaccharide Blend | 60.00 | 0.10 | |||
Petroleum Distillate Blend | 60.00 | 0.10 | ||||||
Recycled Produced Water | Carrier/Base Fluid | 1.79 | ||||||
GBW-5 | Baker Hughes | Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00170000 | ||
ALPHA 1427 | Baker Hughes | Antibacterial Agent | Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00087000 | ||
Ethanol | 64-17-5 | 5.00 | 0.00062000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00372000 | |||||
Water | 7732-18-5 | 60.00 | 0.00743000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00124000 | |||||
SCALETROL 720 | Baker Hughes | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00661000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00094000 | |||||
Additional Ingredients Not Listed on MSDS | ||||||||
Fresh Water | Carrier/Base Fluid | 79.61 | ||||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.11 | ||
Water | 7732-18-5 | 85.00 | 0.62 | |||||
Northern White Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 16.35 | ||
ClayCare | Baker Hughes | Clay Stabilizer | Water | 7732-18-5 | 30.00 | 0.02 | ||
Choline chloride | 67-48-1 | 75.00 | 0.05 | |||||
NE-900 | Baker Hughes | Non-Emulsifier | Methanol | 67-56-1 | 30.00 | 0.02 | ||
Nonyl phenol ethoxylate | 9016-45-9 | 10.00 | 0.00742000 | |||||
FERROTROL 300L | Baker Hughes | Iron Control Agent | Citric acid | 77-92-9 | 50.00 | 0.00204000 | ||
ENZYME G-NE | Baker Hughes | Breaker | No Hazardous Components | 0.00 | ||||
100 Mesh Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 1.04 | ||
BF-9L | Baker Hughes | pH Adjusting Agent | Potassium hydroxide | 1310-58-3 | 15.00 | 0.00361000 | ||
CI-14 | Baker Hughes | Corrosion Inhibitor | Methanol | 67-56-1 | 68.00 | 0.00080000 | ||
Propargyl alcohol | 107-19-7 | 5.00 | 0.00006000 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-11-13 | H2O | 15 | 8102 Bbl | 639854 | BAKER-HUGHES | STAGE 8 |
2012-11-12 | H2O | 15 | 8959 Bbl | 635035 | BAKER-HUGHES | STAGE 6 |
0 | 0 | 0 | ||||
2012-11-13 | H2O | 15 | 7941 Bbl | 7799 | BAKER-HUGHES | STAGE 10 |
2012-11-11 | H2O | 15 | 8084 Bbl | 641167 | BAKER-HUGHES | STAGE 1 |
2012-11-13 | H2O | 15 | 7843 Bbl | 643246 | BAKER-HUGHES | STAGE 9 |
2012-11-12 | H2O | 15 | 8073 Bbl | 642084 | BAKER-HUGHES | STAGE 5 |
2012-11-12 | H2O | 15 | 7878 Bbl | 637216 | BAKER-HUGHES | STAGE 4 |
2012-11-14 | H2O | 15 | 7115 Bbl | 639909 | BAKER-HUGHES | STAGE 12 |
15 | 0 | 0 | BAKER-HUGHES | STAGE | ||
2012-11-12 | H2O | 15 | 9163 Bbl | 643760 | BAKER-HUGHES | STAGE 3 |
2012-11-13 | H2O | 15 | 7071 Bbl | 635437 | BAKER-HUGHES | STAGE 11 |
2012-11-13 | H2O | 15 | 7771 Bbl | 644393 | BAKER-HUGHES | STAGE 7 |
2012-11-12 | H2O | 15 | 7947 Bbl | 643319 | BAKER-HUGHES | STAGE 2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 177362 | 30649 | 173 |
2014 | CHESAPEAKE EXPLORATION LLC | 156271 | 22662 | 319 |
2015 | CHESAPEAKE EXPLORATION LLC | 106200 | 14745 | 339 |
2016 | CHESAPEAKE EXPLORATION LLC | 86552 | 13042 | 363 |
2017 | CHESAPEAKE EXPLORATION LLC | 63358 | 7131 | 353 |
2018 | CHESAPEAKE EXPLORATION LLC | 50634 | 7956 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 15432 | 1849 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 9845 | 173 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 4262 | 319 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 2307 | 339 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 1448 | 363 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1280 | 353 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1284 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 152 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1771654314 | 2012-8-16 0:00: | DD | No Violations | 8.70 |
-1883018791 | 2012-8-5 0:00:0 | DD | No Violations | 9.50 |
-2019199297 | 2012-8-2 0:00:0 | DD | No Violations | 3.50 |
-823743760 | 2016-2-22 0:00: | PL | No Violations | 0.50 |
-983555383 | 2012-8-15 0:00: | DD | No Violations | 2.00 |
0823743760 | 2016-02-22 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are utilizing a plunger lift system. RBDMS production records indicate that the wells are in producing order.
The production equipment on the pad consists of the following: 8 400 bbl. Production tanks 3 Producing wells 3 Sand separators 1 Horizontal heater-treater 1 combustor 1 Low pressure separator tower/Vapor recovery system unit. 1 compressor The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0983555383 | 2012-08-15 | Drill / Deepen / Reopen | No Violations | Patterson rig # 259 has drill string out of hole. Will run 5 1/2 casing and cement Thursday 8-16-2012 |
1203095568 | 2012-08-09 | Drill / Deepen / Reopen | No Violations | Patterson rig # 259 is at 6977 ft. drilling ahead with oil base mud. |
1217171815 | 2012-08-14 | Drill / Deepen / Reopen | No Violations | Patterson rig # 259 is at 14,125 ft. They plan to circulate bottoms up, trip out of hole and log. Then run casing and cement some time Weds. 8-15-2012 |
1310395843 | 2020-8-17 0:00: | PW | No Violations | 1.00 |
1343923817 | 2012-07-31 | Drill / Deepen / Reopen | No Violations | I arrived on site to check on the drilling status of Patterson Drilling Rig # 259. I found that the rig was at 0 and would begin drilling within the hour or around 11 AM. The conductor was already drilled and cemented by a Top Hole rig. Patterson will be drilling a 17.5 hole to set 13 3/8 casing. I passed out my ODNR cards and advised the Company man to contact me at the same time as he contacts his cement crew. He advised that it would be about 8 hours prior to cementing. |
1344254263 | 2012-08-05 | Drill / Deepen / Reopen | No Violations | DNR Supervisor Gene Chini was on site 08/03/2012 to witness a Cement Bond Log on the 13 3/8 inch casing. Chief Simmers had ordered a Cement Bond Log of the 13 3/8 inch casing because the Operator had failed to notify ODNR before that casing was cemented. Supervisor Chini witnessed and approved the Cement Bond Log. Chesapeake was contacted and the Compliance Notice was resolved at that time. Patterson Drilling Rig # 259 will be setting the 9 5/8 inch casing string today. I am on site to witness the running and cementing of the casing. |
1399953014 | 2012-08-01 | Drill / Deepen / Reopen | No Violations | I arrived to check on Patterson Drilling Rig # 259 and found that the drill string had been tripped out of the hole. A logging truck was on site to log the 17.5 inch hole. I found out that there had been a mistake on drilling depth and the hole had not been drilled deep enough. Patterson is to go back in and drill to 610 and no deeper than 640 ft. I again passed out more ODNR cards to the Company man (Josh) on site. I also passed out a 3 page sheet with all of the Inspectors, Supervisors, Central Office staff phone contact information. I again spoke with the Company Man on site and advised that I be contacted along with the cement crew. I also advised that I had been on Nomac Rig # 39 and that they had not contacted me. I was advised that that would not occur this time. |
1451894217 | 2019-12-2 0:00: | PW | No Violations | 0.70 |
1554827807 | 2012-08-16 | Drill / Deepen / Reopen | No Violations | I am on site today to witness the running and cementing of the 5 1/2 casing. See cement ticket for more information. |
1554926890 | 2013-09-26 | Preliminary Restoration | No Violations | On the Day of my inspection the site passed preliminary restoration according to 1509.072A. |
1669347014 | 2019-12-2 0:00: | PW | No Violations | 0.70 |
1752218051 | 2018-08-13 | Production Wells | No Violations | On the day of my inspection I found this pad has 3 properly labeled plunger lift wells. Production equipment includes three sand traps, three GPUs, three 400 barrel steel produced water tanks, five 400 barrel steel condensate tanks, a compressor, and a combustor. Tanks are in their own steel containment. Surface annular pressure is 0 and intermediate is 520. Production records are current in RBDMS. |
1771654314 | 2012-08-16 | Drill / Deepen / Reopen | No Violations | I am on site today to witness the running and cementing of the 5 1/2 inch casing. See cement ticket for more cement information. |
1883018791 | 2012-08-05 | Drill / Deepen / Reopen | No Violations | I am on site today to witness the running and cementing of the 9 5/8 casing string. See Cement Ticket for more cement information. |
2019199297 | 2012-08-02 | Drill / Deepen / Reopen | Violations Noted | I am inspecting this site today because I felt that this job should have happened last night. When I arrived I found that the 13 3/8 casing had already been installed and cemented. Next, I spoke to the Company Man on site and he informed me that I had been notified 48 hours ago. I replied that I had been on site 3 times and during each time I passed out my ODNR card and advised that I be contacted at the same time as the cementers. Each time I was advised that I would be contacted and not to worry. This is the second time this week that a rig drilling for Chesapeake has not called me before installing casing and cementing. I contacted Chief Simmers and he advised me that the Patterson # 259 be shut down and that they be required to submit a copy of the cement bond log to Tom Tomastik before drilling continues. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
2019199297 | US-OH-120517 | 2012-08-02 | Failure to notify inspector; failure to submit cement tickets | |
2019199297 | US-OH-120518 | 2012-08-02 | Permit violation |