If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21093 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.34,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000315 | |
Farm/Lease Name: ADDY 9-12-6 | |
License Status: Producing | |
License Date: 2012-08-20 | |
Spud Date: 2012-09-08 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2012-09-22 | |
Well Total Depth: 14488.00 ft | |
Configuration: Horizontal | |
Latitude: 40.340000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-08-20 | Proposed Formations:POINT PLEASANT, Issued Date:8/20/2012, Expired Date:8/20/2014 12:00:00 PM, Drilling unit acres:164.93, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-09-22 | WCR IN PRELIM FILE |
Correction to Well | 2012-11-09 | UNIT SIZE DECREASED TO 156.59 ACRES. CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES (FROM AS DRILLED SURVEY). |
Correction to Well | 2012-12-14 | UNIT SIZE INCREASED TO 159.89 ACRES. |
Completion Report Received | 2013-11-01 | WCR IN PRELIM FILE |
Construction Permit Expires | 2014-08-20 | WCR IN PRELIM FILE |
Record Last Modified | 2017-10-24 | WCR IN PRELIM FILE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-11-01 | 8399 | 14342 | 288 |
8399 | 14342 | 288 | |
8399 | 14342 | 288 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/14/2012 | 11/14/2012 | 7773.00 | 3,773,364.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ENZYME G-NE | Baker Hughes | Breaker | No Hazardous Components | 0.00 | |||
NE-900 | Baker Hughes | Non-Emulsifier | Methanol | 67-56-1 | 30.00 | 0.02 | ||
Nonyl phenol ethoxylate | 9016-45-9 | 10.00 | 0.00691000 | |||||
ALPHA 1427 | Baker Hughes | Antibacterial Agent | Water | 7732-18-5 | 60.00 | 0.00686000 | ||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00343000 | |||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00080000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00114000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00057000 | |||||
Northern White Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 14.23 | ||
BF-9L, CI-14, ENZYME G-NE, FERROTROL
300L, FRW-18, GW-3LDF, NE-900, SCALETROL 720 |
Baker Hughes | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, Non-Emulsifier, pH Adjusting Agent, Scale Inhibitor | Proprietary Undisclosed by Supplier | |||||
Proprietary Weak Acid | ||||||||
Calcium chloride | 10043-52-4 | |||||||
Proprietary Surfactant | ||||||||
Proprietary Copolymer | ||||||||
Proprietary Solvent | ||||||||
Water | 7732-18-5 | |||||||
Proprietary Acid | ||||||||
Proprietary Disinfectant | ||||||||
Proprietary Biocide | ||||||||
Proprietary Silica | ||||||||
Proprietary Polymer | ||||||||
Proprietary Alcohol | ||||||||
Hemicellulase Enzyme Concentrate | 9025-56-3 | |||||||
GW-3LDF | Baker Hughes | Gelling Agent | Polysaccharide Blend | 60.00 | 0.10 | |||
Petroleum Distillate Blend | 60.00 | 0.10 | ||||||
100 Mesh Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 0.91 | ||
XLW-32 | Baker Hughes | Crosslinker | Boric acid | 10043-35-3 | 20.00 | 0.00197000 | ||
Methanol | 67-56-1 | 90.00 | 0.00888000 | |||||
Recycled Produced Water | Carrier/Base Fluid | 1.02 | ||||||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
FERROTROL 300L | Baker Hughes | Iron Control Agent | Citric acid | 77-92-9 | 50.00 | 0.00180000 | ||
Additional Ingredients Not Listed on MSDS | ||||||||
ClayCare | Baker Hughes | Clay Stabilizer | Choline chloride | 67-48-1 | 75.00 | 0.05 | ||
Water | 7732-18-5 | 30.00 | 0.02 | |||||
Fresh Water | Carrier/Base Fluid | 82.73 | ||||||
BF-9L | Baker Hughes | pH Adjusting Agent | Potassium hydroxide | 1310-58-3 | 15.00 | 0.00323000 | ||
CI-14 | Baker Hughes | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 5.00 | 0.00005000 | ||
Methanol | 67-56-1 | 68.00 | 0.00071000 | |||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.09 | ||
Water | 7732-18-5 | 85.00 | 0.54 | |||||
GBW-5 | Baker Hughes | Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00083000 | ||
SCALETROL 720 | Baker Hughes | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00464000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00066000 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-11-16 | H2O | 15 | 8309 Bbl | 582041 | BAKER-HUGHES | STAGE 8
32 SHOTS |
2012-11-15 | H2O | 15 | 9323 Bbl | 639148 | BAKER-HUGHES | STAGE 3
32 SHOTS |
2012-11-16 | H2O | 15 | 7864 Bbl | 636407 | BAKER-HUGHES | STAGE 7
32 SHOTS |
2012-11-15 | H2O | 15 | 9274 Bbl | 642276 | BAKER-HUGHES | STAGE 4
32 SHOTS |
2012-11-17 | H2O | 15 | 7941 Bbl | 645882 | BAKER-HUGHES | STAGE 9
32 SHOTS |
2012-11-16 | H2O | 15 | 8485 Bbl | 639304 | BAKER-HUGHES | STAGE 5
32 SHOTS |
2012-11-16 | H2O | 15 | 9895 Bbl | 642663 | BAKER-HUGHES | STAGE 6
32 SHOTS |
2012-11-14 | H2O | 15 | 8458 Bbl | 639812 | BAKER-HUGHES | STAGE 1
32 SHOTS |
2012-11-14 | H2O | 15 | 8349 Bbl | 638463 | BAKER-HUGHES | STAGE 2
32 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 127879 | 21940 | 164 |
2014 | CHESAPEAKE EXPLORATION LLC | 115231 | 18149 | 348 |
2015 | CHESAPEAKE EXPLORATION LLC | 79583 | 12738 | 348 |
2016 | CHESAPEAKE EXPLORATION LLC | 64139 | 11401 | 363 |
2017 | CHESAPEAKE EXPLORATION LLC | 56590 | 7708 | 354 |
2018 | CHESAPEAKE EXPLORATION LLC | 56316 | 7075 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 12459 | 1663 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 6302 | 164 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 2715 | 348 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 1224 | 348 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 79 | 363 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 369 | 354 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 660 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 496 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1000806173 | 2019-12-2 0:00: | PW | No Violations | 0.70 |
-1343443086 | 2016-2-22 0:00: | PL | No Violations | 0.50 |
-1999084328 | 2019-12-2 0:00: | PW | No Violations | 0.70 |
-2072651448 | 2018-8-13 0:00: | PW | No Violations | 1.00 |
1343443086 | 2016-02-22 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are utilizing a plunger lift system. RBDMS production records indicate that the wells are in producing order.
The production equipment on the pad consists of the following: 8 400 bbl. Production tanks 3 Producing wells 3 Sand separators 1 Horizontal heater-treater 1 combustor 1 Low pressure separator tower/Vapor recovery system unit. 1 compressor The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1347206008 | 2012-09-09 | Drill / Deepen / Reopen | No Violations | Patterson # 259 set 560 ft of 13 5/8 casing c/w 664 sks - 17.5 inch hole to 577 ft. Cemented by Schlumberger. Had 50 bbls of good cement returns. |
1499029352 | 2013-09-26 | Preliminary Restoration | No Violations | On the Day of my inspection the site passed preliminary restoration according to 1509.072A. |
1735964365 | 2020-8-17 0:00: | PW | No Violations | 1.00 |
2072651448 | 2018-08-13 | Production Wells | No Violations | On the day of my inspection I found this pad has 3 properly labeled plunger lift wells. Production equipment includes three sand traps, three GPUs, three 400 barrel steel produced water tanks, five 400 barrel steel condensate tanks, a compressor, and a combustor. Tanks are in their own steel containment. Surface annular pressure is 0 and intermediate is 390. Production records are current in RBDMS. |
For data sources see[10]