If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21118 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.18,"lon":-81.2,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Moorefield Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000514 | |
Farm/Lease Name: STOUT | |
License Status: Producing | |
License Date: 2012-11-26 | |
Spud Date: 2012-12-15 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2013-01-23 | |
Well Total Depth: 14510.00 ft | |
Configuration: Horizontal | |
Latitude: 40.180000 | |
Longitude: -81.200000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-11-26 | Proposed Formations:POINT PLEASANT, Issued Date:11/26/2012, Expired Date:11/26/2014 12:00:00 PM, Drilling unit acres:355.172, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-01-23 | |
Completion Report Received | 2013-10-18 | |
Correction to Well | 2013-10-25 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE & X, Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 359.582 ACRES. |
Construction Permit Expires | 2014-11-26 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/05/2013 | 03/17/2013 | 8053 | 7,465,880.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | X-Linker | Stingray | Guar Gel | Ethylene Glycol | NA | 30 | 0.00948 | 0 |
Water | 7732-18-5 | 70 | 0.02213 | 0 | ||||
Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 82.5864 | 0 | |
100 mesh | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 0.86769 | 0 | |
Acid Inhibitor | Stingray | Corossion Inhibitor | Water | 7732-18-5 | 40 | 0.00049 | 0 | |
Proprietary polycarboxylic acid mixture | NA | 60 | 0.00074 | 0 | ||||
FR-403 | Weatherford | Friction Reducer | Sodium Chloride | 7647-14-5 | 20 | 0.0106 | 0 | |
Distillates, Petroleum, Hydrotreated Light | 64742-47-8 | 20 | 0.0106 | 0 | ||||
Water | 7732-18-5 | 60 | 0.0318 | 0 | ||||
IC-250 | Stingray | Corossion Inhibitor | Water | 7732-18-5 | 80 | 0.00334 | 0 | |
Proprietary polycarboxylic acid mixture | NA | 20 | 0.00084 | 0 | ||||
FRS 51 | Weatherford | Non-Emulsifier | Alcohols, C6-C12, ethoxylated | 68439-45-2 | 15 | 0.00607 | 0 | |
N-dodecyl-2-pyrrolid one | 2687-96-9 | 2.5 | 0.00101 | 0 | ||||
Methyl Alcohol | 67-56-1 | 40 | 0.0162 | 0 | ||||
Water | 7732-18-5 | 42.5 | 0.01721 | 0 | ||||
Hydrochloric Acid 10 -15% | Stingray | Acid | Hydrochloric Acid | NA | 15 | 0.44227 | 0 | |
Water | 7732-18-5 | 85 | 0.53559 | 0 | ||||
Per Break | Stingray | Breaker | Ammonium Persulfate | 7727-54-0 | 99 | 0.01317 | 0 | |
ScaleClear 112 | Weatherford | Scale Inhibitor | Not Available | NA | 100 | 0.00118 | 0 | |
40/70 White | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 0 | 0 | |
OB-2 | Stingray | Breaker | Cured acrylic resin | NA | 16 | 0.00263 | 0 | |
Ammonium persulfate | 7727-54-0 | 75 | 0.01232 | 0 | ||||
Silica, Crystalline-Quartz | 14808-60-7 | 10 | 0.00164 | 0 | ||||
30/50 White | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 15.666 | 0 | |
BioClear 5000 | Weatherford | Biocide | Water | 7732-18-5 | 95 | 0.0237 | 0 | |
2,2-dibromo-3-nitril oprop ionam ide | 10222-01-2 | 5 | 0.00125 | 0 | ||||
Clean Gel | Stingray | Guar Gel | Solvent naphtha, (petroleum) | 64742-96-7 | 65 | 0.11257 | 0 | |
heavy aliphatic | NA | 35 | 0.06062 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-03-16 | H2O | 28 | 126000 Gal | 6865 | STINGRAY PRESSURE PUMPING LLC | STAGE 22, 36 SHOTS |
2013-03-12 | H2O | 28 | 274218 Gal | 388240 | STINGRAY PRESSURE PUMPING LLC | STAGE 11, 60 SHOTS |
2013-03-10 | H2O | 28 | 293076 Gal | 380120 | STINGRAY PRESSURE PUMPING LLC | STAGE 6, 36 SHOTS |
2013-03-15 | H2O | 28 | 271656 Gal | 418420 | STINGRAY PRESSURE PUMPING LLC | STAGE 21, 36 SHOTS |
2013-03-16 | H2O | 28 | 245238 Gal | 349600 | STINGRAY PRESSURE PUMPING LLC | STAGE 23, 36 SHOTS |
2020-03-05 | H2O | 28 | 187992 Gal | 10000 | STINGRAY PRESSURE PUMPING LLC | STAGE 1, 36 SHOTS |
2013-03-15 | H2O | 28 | 273210 Gal | 8305 | STINGRAY PRESSURE PUMPING LLC | STAGE 19, 36 SHOTS |
2013-03-11 | H2O | 28 | 19698 Gal | 2720 | STINGRAY PRESSURE PUMPING LLC | STAGE 8, 36 SHOTS |
2013-03-10 | H2O | 28 | 249564 Gal | 351180 | STINGRAY PRESSURE PUMPING LLC | STAGE 5, 48 SHOTS |
2013-03-09 | H2O | 28 | 323022 Gal | 368100 | STINGRAY PRESSURE PUMPING LLC | STAGE 4, 36 SHOTS |
2013-03-12 | H2O | 28 | 280854 Gal | 380680 | STINGRAY PRESSURE PUMPING LLC | STAGE 10, 48 SHOTS |
2013-03-15 | H2O | 28 | 331254 Gal | 401330 | STINGRAY PRESSURE PUMPING LLC | STAGE 20, 36 SHOTS |
2013-03-13 | H2O | 28 | 217098 Gal | 385890 | STINGRAY PRESSURE PUMPING LLC | STAGE 16, 60 SHOTS |
2013-03-14 | H2O | 28 | 268338 Gal | 378220 | STINGRAY PRESSURE PUMPING LLC | STAGE 18, 60 SHOTS |
2013-03-12 | H2O | 28 | 245532 Gal | 374421 | STINGRAY PRESSURE PUMPING LLC | STAGE 13, 60 SHOTS |
2013-03-11 | H2O | 28 | 249564 Gal | 1000 | STINGRAY PRESSURE PUMPING LLC | STAGE 7, 36 SHOTS |
2013-03-12 | H2O | 28 | 232092 Gal | 395190 | STINGRAY PRESSURE PUMPING LLC | STAGE 12, 60 SHOTS |
2013-03-12 | H2O | 28 | 252294 Gal | 381390 | STINGRAY PRESSURE PUMPING LLC | STAGE 14, 60 SHOTS |
2013-03-13 | H2O | 28 | 261366 Gal | 401100 | STINGRAY PRESSURE PUMPING LLC | STAGE 15, 60 SHOTS |
2013-03-13 | H2O | 28 | 263886 Gal | 371979 | STINGRAY PRESSURE PUMPING LLC | STAGE 17, 60 SHOTS |
2013-06-07 | H2O | 28 | 128688 Gal | 8531 | STINGRAY PRESSURE PUMPING LLC | STAGE 3, 36 SHOTS |
2013-03-11 | H2O | 28 | 220458 Gal | 423740 | STINGRAY PRESSURE PUMPING LLC | STAGE 9, 48 SHOTS |
2013-03-07 | H2O | 28 | 146286 Gal | 3400 | STINGRAY PRESSURE PUMPING LLC | STAGE 2, 36 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | GULFPORT ENERGY CORPORATION | 258540 | 44640 | 241 |
2014 | GULFPORT ENERGY CORPORATION | 320723 | 21930 | 349 |
2015 | GULFPORT ENERGY CORPORATION | 200461 | 12279 | 301 |
2016 | GULFPORT ENERGY CORPORATION | 193236 | 10303 | 362 |
2017 | GULFPORT ENERGY CORPORATION | 155874 | 6928 | 353 |
2018 | GULFPORT ENERGY CORPORATION | 135749 | 4607 | 361 |
2019 | GULFPORT ENERGY CORPORATION | 30583 | 961 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | GULFPORT ENERGY CORPORATION | Brine | 19988 | 241 |
2014 | GULFPORT ENERGY CORPORATION | Brine | 994 | 349 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 1824 | 301 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 2678 | 362 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 2663 | 353 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 1990 | 361 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 447 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-257904996 | 2019-12-9 0:00: | PW | No Violations | 1.00 |
1355691251 | 2012-12-16 | Drill / Deepen / Reopen | No Violations | I am on site today to witness the running and cementing of the 18 5/8 surface casing. UDI Drilling # 121 ran 354 ft of casing c/w 500 sks by Petroset Cementing Service. 24 inch hole to 365 ft. Had new driller on rig today and casing did take longer to install. |
1356009824 | 2012-12-20 | Drill / Deepen / Reopen | No Violations | I am on site today to witness the running and cementing of the 13 3/8 casing string. UDI Drilling rig # 121 set 1813 ft of casing and Universal Well cemented with 1310 sks of class A cement. 17.5 inch hole to 1820 ft. Had 50 bbls of good returns |
1377607603 | 2013-08-26 | Production Wells | No Violations | I am on site today to check on any off site impact from brine spills which may have occurred on this pad from past drilling practices. I did not find any dead or kill area around the perimeter of the drilling pad or below. |
1379591208 | 2013-09-18 | Production Wells | No Violations | I am checking this site for low vegetation near the edge of the drilling pad. A check of the perimeter found good vegetation all the way around the pad. The production tanks are being spray painted during my inspection. |
1421355826 | 2015-01-15 | Production Wells | No Violations | I am on site today with Brad Burwell to go over the clean up of this site. The production tanks have been removed after finding a problem with the seal of the liner around the tanks. They had decided to work over the production tanks and reconfigure the liner. Gulfport wanted to test the area under the liner for contamination before replacing the tanks and installing the new liner. Jen Masters conducted tests by drilling bore holes down about one ft. deep and using a PID meter to screen for condensate. Her readings were high in several of the areas. Next Brad Burwell contacted me to advise that during a test for condensate, contamination was discovered. Brad said that they would be moving equipment in to remove the contaminated soil. Hull and Associates will be on site to conduct the sample screening using a PID meter. During my inspection today they have excavated the inside of the dike down 1 1/2 ft. x 30 ft. x 80 ft. The contaminated soil has been removed to a roll off container and the rest stored in a pile in the center of the dike. |
1421773174 | 2015-01-20 | Production Wells | No Violations | I arrived on site today to find that the excavation of the contaminated area inside the dike has been completed. Brad Burwell informed me that the condensate contamination inside the dike area has been completed. Hull collected confirmatory soil samples and has sent them to the lab. The production area will not be installed back inside the dike until the lab verifies that the samples are clean of condensate contamination. There is a pile of soil which has been excavated and is outside the dike area and covered by plastic. I contacted Brad Burwell and he said that the soil is contaminated and is on a liner. It is to be removed to roll off containers today. |
1505242172 | 2017-09-12 | Production Wells | No Violations | On the day of my inspection I came to follow up on a report of oil at the end of lease road from Gulfports Brad Burwell. It appears that a vehicle pulled off of the public road onto the lease road entrance and was leaking oil. It is my opinion that the oil spot has no connection to the well. Pad contains two proerly identified producing wells. Well is a plunger lift with with no pressure on the surface casing. Well is in production during my inspection. Production equipment includes four 400 barrel steel production tanks, two horizontal gas production units, one vapor recovery tower and a combustor. |
1836051245 | 2014-01-13 | Preliminary Restoration | No Violations | The site passed preliminary restoration according to 1509.072A. Well is identified but incorrect API number Gulfport was notified and correct number will be posted. |
1851407420 | 2016-04-28 | Preliminary Restoration | No Violations | I arrived on location, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells on site are utilizing a plunger lift system for means of production. RBDMS indicated that the wells on site are in producing order.
The production equipment on the pad consists of the following: 4 400 bbl. Production tanks 2 Producing wells 2 Sand separators 1 Vapor recovery tower 1 combustor The site passed preliminary restoration in accordance with ORC 1509.072 A. |
For data sources see[9]