If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21175 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.38,"lon":-81.12,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: North Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000712 | |
Farm/Lease Name: VALDINGER 12-12-6 | |
License Status: Producing | |
License Date: 2013-05-08 | |
Spud Date: 2013-07-08 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-09-26 | |
Well Total Depth: 13463.00 ft | |
Configuration: Horizontal | |
Latitude: 40.380000 | |
Longitude: -81.120000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-08 | Proposed Formations:POINT PLEASANT, Issued Date:5/8/2013, Expired Date:5/8/2015 12:00:00 PM, Drilling unit acres:297.7, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-09-26 | |
Correction to Well | 2014-03-07 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-09-16 | |
Construction Permit Expires | 2015-05-08 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-09-16 | 8699 | 13260 | 480 |
8699 | 13260 | 480 | |
8699 | 13260 | 480 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/07/2014 | 06/11/2014 | 8007 | 5,425,220.0 | 410588 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
A264, B244, J218, J475, J580, J609,
J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Acid, Proppant - Natural | Alkenes, C>10 a- | 64743-02-8 | 0 | 0.00006000 | 0 | |
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0 | 0.00065 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00048 | 0 | ||||
Copper(II) sulfate | 7758-98-7 | 0 | 0 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.00067 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.03 | 0.00428 | 0 | ||||
Glycerol | 56-81-5 | 0.03 | 0.00378 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.05 | 0.00818 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0 | 0.00032 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0 | 0.00009000 | 0 | ||||
Guar gum | 9000-30-0 | 0.58 | 0.08698 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00013 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00035 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 1.01 | 0.15153 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0 | 0.00057 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00029 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.04 | 0.00604 | 0 | ||||
Crystalline silica | 14808-60-7 | 98.13 | 14.745 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00009000 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.04 | 0.00604 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00001000 | 0 | ||||
2-propenamid | 79-06-1 | 0 | 0.00002000 | 0 | ||||
Urea | 57-13-6 | 0 | 0.0004 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.02 | 0.00325 | 0 | ||||
Potassium borate | 1332-77-0 | 0.08 | 0.01158 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00002000 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 80.1574 | 0 | |
EC6486A | NALCO | Scale Inhibitor | Water | 007732-18-5 | 0 | 0.01103 | 0 | |
Proprietary Amine Triphosphate | TRADE SECRET | 30 | 0.00473 | 0 | ||||
Proprietary Organic Acid Derivatives | TRADE SECRET | 0 | 0.00551 | 0 | ||||
Diethylene Glycol | 000111-46-6 | 0 | 0.00018 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 30 | 0.00473 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 4.52309 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-06-11 | H2O | 15 | 2793 Bbl | 475440 | Schlumberger | STAGE 16/16
30 SHOTS |
2014-06-07 | H2O | 15 | 3023 Bbl | 476980 | Schlumberger | STAGE 1/16
30 SHOTS STAGES 2-15 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 180834 | 24953 | 154 |
2015 | CHESAPEAKE EXPLORATION LLC | 248687 | 21008 | 341 |
2016 | CHESAPEAKE EXPLORATION LLC | 162869 | 16512 | 355 |
2017 | CHESAPEAKE EXPLORATION LLC | 128557 | 11820 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 106445 | 9045 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 23676 | 1988 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 11369 | 154 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 9774 | 341 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2207 | 355 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1766 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 897 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 256 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-279368591 | 2016-2-17 0:00: | PL | No Violations | 0.50 |
-696418200 | 2013-9-16 0:00: | DD | No Violations | 1.00 |
0279368591 | 2016-02-17 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. All wells on location are using the plunger lift system as the method of production. RBDMS production records indicate that the wells are in production.
The production equipment on the pad consists of the following: 8 400 bbl. Production tanks 7 Producing wells 7 Sand separators 1 Low pressure separator tower/Vapor recovery system unit. 1 Combustor 1 Compressor 2 Horizontal heater-treater. There was approximately 4 to 5 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0696418200 | 2013-09-16 | Drill / Deepen / Reopen | No Violations | Chesapeake Energy is moving Nomac Drilling Rig # 71 on to drill this well. They are less than 50% moved at this time. Spud date for conductor was 07/08/2013 and 120 ft of 20 conductor was set. |
1373322416 | 2013-07-08 | Casing String Witnessed | No Violations | I am on site this evening to witness the running and the cementing of the 20 inch diameter casing string. Express Drilling Service drilled a 26 hole to 120 ft and set 120 ft of casing. Allied Cementing Service c/w 226 sks of class A cement @ 15.6 lb and 1.2 yield. Had good cement returns |
1380731516 | 2013-10-02 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to 1509.072A. |
615740621 | 2019-8-16 0:00: | PW | No Violations | 1.00 |
For data sources see[10]