X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21178

Well Details

Well ID: 34-067-21178
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: North Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000712
Farm/Lease Name: VALDINGER 12-12-6
License Status: Producing
License Date: 2013-05-08
Spud Date: 2013-07-06
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-11-27
Well Total Depth: 15412.00 ft
Configuration: Horizontal
Latitude: 40.380000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-08 Proposed Formations:POINT PLEASANT, Issued Date:5/8/2013, Expired Date:5/8/2015 12:00:00 PM, Drilling unit acres:777.8, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-11-15 CORRECTION TO CASING PROGRAM.
Reached Total Depth 2013-11-27
Correction to Well 2014-03-07 CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2014-09-30
Construction Permit Expires 2015-05-08
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-10-02 8654 15205 655
8654 15205 655
8654 15205 655

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/19/2014 05/24/2014 7945 7,578,770.0 562809

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6486A NALCO Scale Inhibitor Proprietary Organic Acid Derivatives TRADE SECRET 0 0.00549 0
Water 007732-18-5 0 0.01098 0
Proprietary Inorganic Phosphate TRADE SECRET 0 0.00183 0
Diethylene Glycol 000111-46-6 0 0.00018 0
Ethylene Glycol 000107-21-1 30 0.00472 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 79.6293 0
A264, B244, J218, J475, J580, J609,

J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Acid, Proppant - Natural Fatty acids, tall-oil 61790-12-3 0 0.00034 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Urea 57-13-6 0 0.00054 0
Diammonium peroxidisulphate 7727-54-0 0.03 0.00472 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00001000 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00062 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.01 0.00089 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00002000 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.06 0.00827 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Potassium hydroxide 1310-58-3 0.02 0.00356 0
poly(tetrafluoroethylene) 9002-84-0 0 0.00001000 0
Ammonium sulfate 7783-20-2 0.08 0.0112 0
Sodium erythorbate 6381-77-7 0 0.00057 0
Glutaraldehyde 111-30-8 0.03 0.00478 0
Prop-2-yn-1-ol 107-19-7 0 0.00009000 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
2-propenamid 79-06-1 0 0.00003000 0
Sodium sulfate 7757-82-6 0 0.00013 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.00013 0
Hydrogen chloride 7647-01-0 1 0.14942 0
Potassium borate 1332-77-0 0.06 0.00963 0
Crystalline silica 14808-60-7 98.27 14.6506 0
Guar gum 9000-30-0 0.42 0.06268 0
Glycerol 56-81-5 0.02 0.00314 0
Alkenes, C>10 a- 64743-02-8 0 0.00006000 0
Non-crystalline silica 7631-86-9 0 0.00028 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Methanol 67-56-1 0 0.00047 0
Copper(II) sulfate 7758-98-7 0 0 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00028 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 5.27349 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-24 H2O 15 4805 Bbl 485315 Schlumberger STAGE 22/22

30 SHOTS

2014-05-19 H2O 15 3580 Bbl 489960 Schlumberger STAGE 1/22

30 SHOTS STAGES 2-21 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 177753 28349 147
2015 CHESAPEAKE EXPLORATION LLC 347957 39849 329
2016 CHESAPEAKE EXPLORATION LLC 202183 21808 343
2017 CHESAPEAKE EXPLORATION LLC 165825 15830 365
2018 CHESAPEAKE EXPLORATION LLC 130300 11291 359
2019 CHESAPEAKE EXPLORATION LLC 35669 2354 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 11955 147
2015 CHESAPEAKE EXPLORATION LLC Brine 9842 329
2016 CHESAPEAKE EXPLORATION LLC Brine 3741 343
2017 CHESAPEAKE EXPLORATION LLC Brine 2578 365
2018 CHESAPEAKE EXPLORATION LLC Brine 404 359
2019 CHESAPEAKE EXPLORATION LLC Brine 451 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2118002357 2016-2-17 0:00: PL No Violations 0.50
-259605842 2014-1-17 0:00: PL No Violations 0.30
0259605842 2014-01-17 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
0363099820 2013-11-18 Casing String Witnessed No Violations I was contacted and advised that they would be ready around 5 am to cement surface. I arrived and found that Nomac Drilling Rig # 71 is at 744ft broke down at this time and will be ready around 11 am to cement. Received a call to advise me that they are now running behind and will be ready around 3. Received a call to advise me that it would be 5:30 now. Then went to the job and found that they are broke down again and it will be later tonight.
1384985244 2013-11-20 Casing String Witnessed No Violations I am on site tonight to witness the running and the cementing of the 9-5/8 inch casing string. Nomac Drilling Rig # 71 drilled a 12-1/4 inch hole to 2023 ft and set 2008 ft of casing. Schlumberger Cementing Service c/w 730 sks of Class A @ 15.85 lb Had good cement returns
1393324872 2019-8-16 0:00: PW No Violations 1.00
2118002357 2016-02-17 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. All wells on location are using the plunger lift system as the method of production. RBDMS production records indicate that the wells are in production.
The production equipment on the pad consists of the following:

8 400 bbl. Production tanks 7 Producing wells 7 Sand separators

1 Low pressure separator tower/Vapor recovery system unit. 1 Combustor 1 Compressor 2 Horizontal heater-treaters. There was approximately 4 to 5 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A.

363099820 2013-11-18 0:00 CS No Violations 4.50

For data sources see[10]

References