If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21191 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.1,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000710 | |
Farm/Lease Name: WRIGHT 35-11-5 | |
License Status: Producing | |
License Date: 2014-06-19 | |
Spud Date: 2014-07-02 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-09-23 | |
Well Total Depth: 16147.00 ft | |
Configuration: Horizontal | |
Latitude: 40.360000 | |
Longitude: -81.100000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-21 | Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-02-27 | Proposed Formations:POINT PLEASANT, Issued Date:2/27/2014, Expired Date:2/27/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-06-19 | Proposed Formations:POINT PLEASANT, Issued Date:6/19/2014, Expired Date:6/18/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-09-23 | |
Correction to Well | 2015-04-03 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-07-31 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM NEW PLAT. |
Completion Report Received | 2016-01-19 | |
Construction Permit Expires | 2016-06-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-01-21 | 8384 | 15911 | 0 |
8384 | 15911 | 0 | |
8384 | 15911 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/07/2015 | 05/28/2015 | 8186 | 8,287,360.0 | 737705 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.0002 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00007000 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00055 | 0 | ||||
Water | 007732-18-5 | 93 | 0.54411 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00082 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.5668 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00767 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00025 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.00856 | 0 | ||||
Aliphatic acid | NA | 30 | 0.0002 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00401 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00055 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.00856 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01534 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.04412 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.0952 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 16.6745 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00026 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00287 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 81.7647 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.1992 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-05 | H2O | 0 | 3836 Gal | 324450 | Schlumberger | STGAE 50/50
40 SHOTS |
2015-05-07 | H2O | 0 | 4547 Bbl | 330840 | Schlumberger | STAGE 1/50
25 SHOTS STAGES 2-49 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 231813 | 22615 | 94 |
2016 | CHESAPEAKE EXPLORATION LLC | 611676 | 36430 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 335474 | 13289 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 243697 | 7327 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 51349 | 1462 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 12539 | 94 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 19078 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 7504 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 440 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 1206 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1458157096 | 2015-5-28 0:00: | PL | No Violations | 0.20 |
-1832024815 | 2019-11-29 0:00 | PW | No Violations | 1.00 |
-961670394 | 2016-2-22 0:00: | PL | No Violations | 0.50 |
-968943545 | 2014-9-16 0:00: | DD | No Violations | 2.50 |
0645794594 | 2014-07-02 | Casing String Witnessed | No Violations | On the date of inspection, I accompanied ODNR Inspector Mark Moreland to witness the running and cementing of the 20 conductor casing. Express Drilling drilled a 26 hole to a depth of 120 and set 120 of 94# casing. Express Cementing Service cemented with 230sks Class A at 15.6# and yield of 1.18. Company man present on site is Brett Farnsworth. Express Energy Services established circulation in hole before cementing and received 8bbl of cement back to surface. Cement stayed to surface while I was on site. |
0857305974 | 2018-10-18 | Production Wells | No Violations | |
0961670394 | 2016-02-22 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 2 Horizontal heater-treaters 1 combustor 1 low pressure separator/ Vapor recovery system 4 compressors 2 NGL tanks The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0968943545 | 2014-09-16 | Drill / Deepen / Reopen | No Violations | On the date of inspection I was informed by Company Man Rodney Bean that the Patterson 261 rig had drilled an 8.75 inch hole to a depth of 7437 feet. The rig was currently preparing its Bottom Hole Assembly for its curve and lateral. I informed Rodney Bean that I had located a tear in the secondary containment around the rig chemicals. There was approximately a 12 inch tear through the liner along the berm. Rodney will be dispatching a crew to repair the liner. |
1308120801 | 2014-09-10 | Casing String Witnessed | No Violations | On the date of inspection I was informed by Chesapeake company man Rodney Bean that the Patterson 261 rig had drilled a 17.5 inch diameter hole to a total depth of 594 feet. Costvs Energy Servies then ran 13.375 inch casing weighing 54.5lbs/ft to a depth of 586 feet. O-Tex Pumping, LLC (O-Tex) pumped 540sks of Premium H Cement weighing 15.6ppg with a yield of 1.2. Additives include 2% CaCl, 0.4% C-41P, 0.25lbs/sk of Celloflake. O-Tex pumped 84.7bbl of fresh water to displace cement. 28bbl of cement returned to surface. |
1458157096 | 2015-05-28 | Preliminary Restoration | No Violations | On this date I am on site to conduct an inspection on the well site for Preliminary Restoration. The well passes for Preliminary Restoration per ORC 1509.072(A). |
1951199593 | 2014-07-02 | Casing String Witnessed | No Violations | Express Drilling drilled a 26 inch hole to 120 ft and set 120 ft of 20 inch casing. Express Cementing Service cemented with 230 sacks of class A cement at 15.6 lbs and a yield of 1.18. Establish circulation, then had 8 bbls of cement returns. |
645794594 | 2014-7-2 0:00:0 | CS | No Violations | 3.00 |
857305974 | 2018-10-18 0:00 | PW | No Violations | 1.00 |
For data sources see[10]