34-067-21195

Well Details

Well ID: 34-067-21195
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Athens Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000720
Farm/Lease Name: BEACON CDZ HR
License Status: Producing
License Date: 2013-06-07
Spud Date: 2013-07-07
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2014-01-31
Well Total Depth: 18345.00 ft
Configuration: Horizontal
Latitude: 40.220000
Longitude: -81.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-06-05 Proposed Formations:POINT PLEASANT, Issued Date:6/5/2013, Expired Date:6/5/2015 12:00:00 PM, Drilling unit acres:155.51, Proposed Well Type:OG, Proposed Well Class:EW
APP 2013-06-07 Proposed Formations:POINT PLEASANT, Issued Date:6/7/2013, Expired Date:6/7/2015 12:00:00 PM, Drilling unit acres:919.192, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-01-31
Correction to Well 2014-02-14 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2014-08-30
Construction Permit Expires 2015-06-07
Change of Owner 2018-10-15 Operator changed from 8870, HESS OHIO DEVELOPMENTS LLC to 9520, ASCENT RESOURCES UTICA LLC
Correction to Well 2018-10-19 CHANGE IN WELL NAME AND NUMBER (PREVIOUS: CADIZ B #1H-14)
Record Last Modified 2018-10-19

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/07/2014 04/17/2014 8756 13,089,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl, 5.1 - 7.5% Baker Hughes Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0719864 92552.6
Water 7732-18-5 92.5 0.887832 1,141,480.0
Ferrotrol 300L Baker Hughes Iron Control Water 7732-18-5 50 0.00347481 4467.55
Citric Acid 77-92-9 60 0.00416977 5361.05
GBW-5 Baker Hughes Breaker Ammonium Persulfate 7727-54-0 100 0.0022727 2922
MaxPerm-20A Baker Hughes Friction Reducer Aliphatic Hydrocarbon Trade Secret 30 0.0726668 93427.4
Oxyalkylated Alcohol Trade Secret 5 0.0121111 15571.2
GasFlo G Baker Hughes Surfactant Oxyalkylated Alkylphenol Trade Secret 10 0.00008918 114.654
Methanol 67-56-1 30 0.000267531 343.963
Polyoxyalkylene Trade Secret 10 0.00008918 114.654
Oxyalkylated Amine Trade Secret 5 0.00004459 57.3272
Water 7732-18-5 60 0.000535062 687.926
Water Operator Carrier Water 7732-18-5 100 84.8877 109,140,000.0
CI-14 Baker Hughes Corrosion Inhibitor Water 7732-18-5 1 0.00001590 20.4368
Modified Thiourea Polymer 68527-49-1 7 0.000111269 143.058
Hydrochloric acid 7647-01-0 1 0.00001590 20.4368
Formaldehyde 50-00-0 1 0.00001590 20.4368
Other Chemicals Fatty Acids Trade secret 0 0.000158955 204.368
Methanol 67-56-1 0 0.00158955 2043.68
Sodium Chloride 7647-14-5 0 0.00000817 10.5095
Water 7732-18-5 0 0.0136237 17515.9
Polyacrylate Trade Secret 0 0.00544947 7006.36
Polyoxyalkylenes Trade secret 0 0.000476866 613.105
Potassium Chloride 7447-40-7 0 0.00001362 17.5159
Olefin Trade secret 0 0.00007948 102.184
Propargyl Alcohol 107-19-7 0 0.00007948 102.184
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium Chloride 10043-52-4 5 0.00136237 1751.59
Ethylene Glycol 107-21-1 30 0.00817421 10509.5
Sand, White Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 14.024 18,030,600.0
NE-900 Baker Hughes Non-emulsifier Oxyalkylated Alkyiphenol 9016-45-9 10 0.00009289 119.431
Inorganic Solvent Trade Secret 80 0.000743134 955.444
Copolymer Trade Secret 40 0.000371567 477.722
Methanol 67-56-1 30 0.000278675 358.292

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-04-17 H2O 8 8045 Bbl 501560 BAKER-HUGHES STAGE 36

36 SHOTS

2014-04-16 H2O 8 8429 Bbl 503920 BAKER-HUGHES STAGE 34

36 SHOTS

2014-04-15 H2O 8 8422 Bbl 506220 BAKER-HUGHES STAGE 28

36 SHOTS

2014-04-10 H2O 8 7904 Bbl 493260 BAKER-HUGHES STAGE 10

36 SHOTS

2014-04-13 H2O 8 7970 Bbl 501080 BAKER-HUGHES STAGE 18

36 SHOTS

2014-04-17 H2O 8 7804 Bbl 505320 BAKER-HUGHES STAGE 33

36 SHOTS

2014-04-11 H2O 8 7917 Bbl 501820 BAKER-HUGHES STAGE 13

36 SHOTS

2014-04-16 H2O 8 8079 Bbl 440680 BAKER-HUGHES STAGE 30

36 SHOTS

2014-04-08 H2O 8 6593 Bbl 262840 BAKER-HUGHES STAGE 1

36 SHOTS

2014-04-12 H2O 8 7811 Bbl 497920 BAKER-HUGHES STAGE 17

36 SHOTS

2014-04-12 H2O 8 8079 Bbl 500320 BAKER-HUGHES STAGE 16

36 SHOTS

2014-04-08 H2O 8 8409 Bbl 494640 BAKER-HUGHES STAGE 2

36 SHOTS

2014-04-09 H2O 8 7908 Bbl 483765 BAKER-HUGHES STAGE 4

36 SHOTS

2014-04-13 H2O 8 8082 Bbl 506460 BAKER-HUGHES STAGE 19

36 SHOTS

0 0 0
2014-04-16 H2O 8 8423 Bbl 543585 BAKER-HUGHES STAGE 31

36 SHOTS

2014-04-14 H2O 8 8100 Bbl 502920 BAKER-HUGHES STAGE 24

36 SHOTS

2014-04-13 H2O 8 8036 Bbl 503500 BAKER-HUGHES STAGE 21

36 SHOTS

2014-04-08 H2O 8 9192 Bbl 496460 BAKER-HUGHES STAGE 3

36 SHOTS

2014-04-17 H2O 8 7511 Bbl 415080 BAKER-HUGHES STAGE 37

36 SHOTS

2014-04-15 H2O 8 7557 Bbl 439938 BAKER-HUGHES STAGE 27

36 SHOTS

2014-04-10 H2O 8 7831 Bbl 498340 BAKER-HUGHES STAGE 11

36 SHOTS

2014-04-15 H2O 8 8744 Bbl 496040 BAKER-HUGHES STAGE 26

36 SHOTS

2014-04-10 H2O 8 7954 Bbl 500320 BAKER-HUGHES STAGE 9

36 SHOTS

2014-04-14 H2O 8 8287 Bbl 507620 BAKER-HUGHES STAGE 23

36 SHOTS

0 0 0
2014-04-16 H2O 8 7896 Bbl 501526 BAKER-HUGHES STAGE 32

36 SHOTS

2014-04-11 H2O 8 8017 Bbl 496480 BAKER-HUGHES STAGE 12

36 SHOTS

2014-04-09 H2O 8 8573 Bbl 502840 BAKER-HUGHES STAGE 7

36 SHOTS

2014-04-14 H2O 8 7904 Bbl 503960 BAKER-HUGHES STAGE 25

36 SHOTS

2014-04-09 H2O 8 8075 Bbl 509940 BAKER-HUGHES STAGE 6

36 SHOTS

2014-04-13 H2O 8 8036 Bbl 503500 BAKER-HUGHES STAGE 20

36 SHOTS

2014-04-12 H2O 8 7805 Bbl 493680 BAKER-HUGHES STAGE 14

36 SHOTS

2014-04-10 H2O 8 7936 Bbl 501040 BAKER-HUGHES STAGE 8

36 SHOTS

0 0 0
2014-04-15 H2O 8 8004 Bbl 502040 BAKER-HUGHES STAGE 29

36 SHOTS

2014-04-17 H2O 8 8239 Bbl 515000 BAKER-HUGHES STAGE 35

36 SHOTS

2014-04-14 H2O 8 7923 Bbl 499100 BAKER-HUGHES STAGE 22

36 SHOTS

2014-04-09 H2O 8 9113 Bbl 486400 BAKER-HUGHES STAGE 5

36 SHOTS

2014-04-12 H2O 8 11507 Bbl 501300 BAKER-HUGHES STAGE 15

36 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 HESS OHIO DEVELOPMENTS LLC 554724 8287 128
2015 HESS OHIO DEVELOPMENTS LLC 1744100 17932 319
2016 HESS OHIO DEVELOPMENTS LLC 1295191 1630 364
2017 HESS OHIO DEVELOPMENTS LLC 506575 586 282
2018 ASCENT RESOURCES UTICA LLC 2365 0 2
2019 ASCENT RESOURCES UTICA LLC 26961 5 26

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 HESS OHIO DEVELOPMENTS LLC Brine 7003 128
2015 HESS OHIO DEVELOPMENTS LLC Brine 23404 319
2016 HESS OHIO DEVELOPMENTS LLC Brine 6499 364
2017 HESS OHIO DEVELOPMENTS LLC Brine 2747 282
2018 ASCENT RESOURCES UTICA LLC Brine 14 2
2019 ASCENT RESOURCES UTICA LLC Brine 176 26

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1264303890 2014-8-20 0:00: PW No Violations 4.00
-1307165247 2014-8-19 0:00: PW No Violations 3.50
-1630758246 2014-8-14 0:00: PW No Violations 4.00
-1906631879 2017-8-31 0:00: PL No Violations 1.00
-683998914 2013-12-30 0:00 DD No Violations 1.50
0458370068 2014-01-29 Drill / Deepen / Reopen No Violations I am on site today to pick up the cementing information from 5.1/2 diameter casing string. They set 18,319ft of casing and Halliburton Cementing Ser.did the cement job. The rig is moving out of Harrison Co for 1 well and will return.
0664168394 2014-08-19 Production Wells No Violations I am on site today to review the clean up of the defoaming agent which was spilled Aug 12 th or 13 th. It appears that the spill area has been covered with a plastic liner and no further excavation has occurred. Review info with Rick Triple and Rocky King.
0683998914 2013-12-30 Drill / Deepen / Reopen No Violations I am checking on the drilling status of H & P Drilling Rig # 284 and found that they have now moved to this well and will drill it to total depth.
0698428531 2014-11-17 Production Wells No Violations The clean up from the defoamer has been completed. The contaminated soil has been removed and the ditch which was blocked to prevent water from driving the contamination off site has been opened. It should function as it did prior to the spill.
0992546656 2014-09-22 Production Wells No Violations The line heater for the Number 2 well has not been totally fixed or replaced. The well remains shut down while the other 3 wells on the pad are in operation. The clean up of the defoamer spill continues and is around 95% complete. Rick Trippel is working on details of the clean up with Mark Scrobacz. Mark is to send the results for the last soil analyses.
1264303890 2014-08-20 Production Wells No Violations On the date of my inspection I accompanied ODNR Inspector Mark Moreland to meet with Hess personnel regarding the lightning strike that occurred at one of their production tanks. We also met with Hess and Envirotrac personnel regarding the spill clean up efforts. Ron Trivisonno and Rick Trippel with ODNR were also on site to take over the handling of the spill clean up. Refer to Mark Morelands report for further details.
1307165247 2014-08-19 Production Wells No Violations On the date of my inspection I met ODNR Inspector Mark Moreland on the spill site to go over actions that had been taken over the weekend and to check the current status. Refer to Mark Morelands report for further details.
1373376650 2013-07-08 Casing String Witnessed No Violations I am on site today to witness the running and the cementing of the 18-5/8 inch diameter casing string. H&P Drilling Rig # 284 is running casing but is having trouble getting casing to bottom. I remained on site for as long as they were making progress. It appears that they will not be able to run casing to total depth.
1373485162 2013-07-10 Casing String Witnessed No Violations I am on site today training with Mark Moreland to witness the running and cementing of the 18.625 inch diameter surface casing. H&P Drilling Rig # 284 drilled a 22 inch diameter hole to 410 feet and set 385 feet of casing. Halliburton cemented with 220 sacks of Class A cement @ 15.6lb and 1.18 yield. During our cement job a thunder storm with high winds and rain shut down the operation until it passed. The storm lasted for more than 2 hours.
1373939885 2013-07-15 Casing String Witnessed No Violations I was contacted early this morning to inform that casing would be run and cemented at around noon today. I arrived on site to witness the running and the cementing of the 13-3/8 inch casing string. H &P Drilling Rig # 284 drilled a 17-1/2 inch hole to 1930 ft. I arrived with Doug Bennett to witness the cementing operation. During the running of the casing a hydraulic line broke and sprayed a floor hand. The operation was shut down for several hours until repairs could be made. We left at that time to return later.
1376926404 2013-08-19 Drill / Deepen / Reopen No Violations I arrived today for a site inspection and found H &P Drilling # 284 drilling at 4800 ft on the vertical section of the well. I also checked on the cement info and rig schedule.
1390326593 2014-01-21 Drill / Deepen / Reopen No Violations I am on site today to check on the drilling status of H & P Drilling Rig # 284 and found that they are at 18,345 ft and are just reaching total depth. They will make several wiper runs back to bottom and then trip out to run 5-1/ inch casing in the 8.5 inch diameter hole. Should be ready to cement casing Friday or Sat.
1408138042 2014-08-15 Production Wells No Violations On the date of inspection I was on site to witness Hess contain their spill and cover the contaminated area in case of rain. The Hess company representative on site was Renee Cowell, EHS & SR Supervisor. The contractor on site was Envirotrac with representatives Dennis Furmanek and Diane Webb. Envirotrac and Hess attempted to use an old liner they had stored to cover the contaminated area. The liner was found to be in poor condition so a new one will be delivered the following morning. Envirotrac performed field screenings of soils in the ditch area with a PID and readings ranging from 0.0ppm to 6390ppm. They were unsuccessful in attempts to procure a geoprobe to delineate the contamination range as well as an excavator to dig a sump in the ditchline to prevent down gradient contamination. They plan to have both pieces of equipment on site as well as utilities marked first thing in the morning. Envirotrac and Hess did not show up on site until 14:00.
1408201719 2014-08-16 Production Wells No Violations On the date of inspection I witnessed Hess and Envirotrac establishing containment of the spill on site and the delineation of the extent of contamination. Hess representative on site was Brian Lockwood. Envirotrac Project Specialist on site is Dennis Furmanek. At the time of my inspection I witnessed that a heavy duty liner had been placed across most of the known contaminated area including between heated separators. The up gradient culvert and the down gradient culvert have been sealed with silicone and plywood to prevent water from leaving site in the event of a storm. A pit approximately 3 feet by 3 feet was excavated within the drainage ditch in front of where the spill took place. At the time of my inspection Envirotrac was in the process of delineating the contaminated area using a geoprobe. The geoprobe contractor is Geo Environmental Drilling Company from Pittsburgh, PA.
1408396652 2014-08-18 Production Wells No Violations On the date and time of my inspection there had been no significant changes to the site of the spill since my report on date 8-16-14. There were sections of the liner over the contaminated area that had been cut and glued back together in areas where test borings were performed on 8-16-14.
1593644138 2013-07-15 Casing String Witnessed No Violations I am on site tonight to witness the running and the cementing of the 13-3/8inch diameter casing string. H & P Drilling Rig # 284 drilled a 17-1/2 inch diameter hole to 1930 ft. and tried to set 1925 ft of casing but could not get it to bottom. Pull out last joint of casing and set 1880 ft. Halliburton C/W 830 sks of class A cement @ 15.6
1620961742 2014-08-14 Production Wells No Violations I received a call from Hess Ohio Development Rene Cowell that a spill of Defoaming agent had leaked at the production facility. The Defoaming agent is very hazardous and requires a Haz Mat crew to respond. The crew responding to the spill is Weavertown and they are to mobilize and be on site today around noon. Myself and Inspector Brandon Trigg went to the site and met with the Weavertown Crew along with Rene Cowell and Brian Lockwood both from Hess Ohio. They reported that a spill of 20 to 150 gallons could have occurred. The spill went undetected because the line carrying the Defoaming agent was below ground level and out of site. It could have leaked a day or more before being detected. When Inspector Trigg and I arrived we found that the area in front of the line heaters contained most of the spill in the dirt under and next to the line heaters and in the road ditch in front of the Defoamer tanks. We witnessed Weavertown remove soil under the Defoamer tanks once they had been removed and in the road ditch. Booms and absorbent pads were placed in the ditch and in front of the line heaters to absorb some of the free defoamer while still liquid. After a very short time, digging, on site was stopped once it became clear that it was too close to high pressure lines and electrical lines. More info is to be gathered and a plan on how to continue developed. Samples are to be collected and shared with ODNR by Weavertown.
1630758246 2014-08-14 Production Wells No Violations Arrive on site today to meet with Weavertown Consulting Group to see when and how they are going to contain and remediate the spill site. Hess Ohio Development has had a defoamer leak out of containment and into a road ditch in front of the production pad. Rene Cowell reported a spill of the Hughes Defoamer at around 150 gallons or 3.6 barrels of DF03043U defoamer. They are to review the spill and submit a plan for remediation to ODNR as soon as possible. They are to collect samples to determine the extent of the area contaminated and share the results with ODNR.
1906631879 2017-08-31 Preliminary Restoration No Violations On the day of my inspection I found the Cadiz B pad seperated between a production equipment pad and a wellhead pad. Five properly labeled chritsmas tree style welheads are on location. Production equipment includes three 400 barrel steel condensate tanks, one 400 barrel brine tank, five line heaters, one seperator, flare, and vapor recovery system. Production equipment is fenced and locked and access the wellheads is also restricted by fence. Production records are current in RBDMS. Site passes preliminary restoration according to ORC 1509.072A.
458370068 2014-1-29 0:00: DD No Violations 1.00
664168394 2014-8-19 0:00: PW No Violations 2.50
698428531 2014-11-17 0:00 PW No Violations 1.50
786121747 2019-10-8 0:00: PW No Violations 1.00
992546656 2014-9-22 0:00: PW No Violations 1.50

For data sources see[9]

References