If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21202 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Archer Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000814 | |
Farm/Lease Name: HELEN HALTER 23-11-5 | |
License Status: Producing | |
License Date: 2014-04-30 | |
Spud Date: 2013-08-13 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-09-23 | |
Well Total Depth: 17301.00 ft | |
Configuration: Horizontal | |
Latitude: 40.350000 | |
Longitude: -81.050000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-06-11 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:6/11/2013, Expired Date:6/11/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Correction to Well | 2013-06-21 | CHANGE IN WELL NUMBER |
APP | 2014-04-30 | Proposed Formations:POINT PLEASANT, Issued Date:4/30/2014, Expired Date:4/29/2016 12:00:00 PM, Drilling unit acres:606.64, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2014-09-23 | |
Correction to Well | 2015-02-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-06-15 | |
Construction Permit Expires | 2016-04-29 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-06-15 | 8661 | 17175 | 775 |
8661 | 17175 | 775 | |
8661 | 17175 | 775 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/05/2015 | 02/13/2015 | 8219 | 7,006,940.0 | 576758 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 83.9372 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 7.5pct, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Ammonium sulfate | 7783-20-2 | 0.04 | 0.00656 | 0 | |
Guar gum | 9000-30-0 | 0.67 | 0.10621 | 0 | ||||
Non-crystalline silica (impurity) | 7631-86-9 | 0 | 0.00033 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00001000 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0 | 0.00052 | 0 | ||||
Hexadec-1-ene | 629-73-2 | 0 | 0.00002000 | 0 | ||||
Glycerol | 56-81-5 | 0.03 | 0.00533 | 0 | ||||
Calcium chloride | 10043-52-4 | 0.08 | 0.0126 | 0 | ||||
Potassium chloride (impurity) | 7447-40-7 | 0 | 0.00035 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00002000 | 0 | ||||
Crystalline silica | 14808-60-7 | 98.21 | 15.6089 | 0 | ||||
Potassium borate | 1332-77-0 | 0.1 | 0.01634 | 0 | ||||
1-Octadecene (C18) | 112-88-9 | 0 | 0.00001000 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.04 | 0.00604 | 0 | ||||
Hydrochloric acid | 7647-01-0 | 0.75 | 0.11865 | 0 | ||||
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00028 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00011 | 0 | ||||
Formaldehyde | 50-00-0 | 0 | 0 | 0 | ||||
Propargyl alcohol | 107-19-7 | 0 | 0.00007000 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0 | 0.00047 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00007000 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.0004 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0 | 0 | ||||
2-propenamid | 79-06-1 | 0 | 0.00002000 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.00065 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.03 | 0.00484 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.02 | 0.00328 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Sodium chloride (impurity) | 7647-14-5 | 0 | 0.00019 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.03 | 0.00537 | 0 | ||||
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen
phosphate), sodium salt |
68171-29-9 | 0.01 | 0.00158 | 0 | ||||
Urea | 57-13-6 | 0 | 0.00032 | 0 | ||||
Copper(II) sulfate | 7758-98-7 | 0 | 0 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0 | 0.0007 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00023 | 0 | ||||
Ethylene Glycol | 107-21-1 | 0 | 0.0002 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-02-05 | H2O | 15 | 2286 Bbl | 326035 | Schlumberger | STAGE 1/31
25 SHOTS STAGES 2-30 SEE IMAGES |
2015-02-14 | H2O | 8 | 1777 Bbl | 330420 | Schlumberger | STAGE 31/31
25 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 556658 | 34157 | 232 |
2016 | CHESAPEAKE EXPLORATION LLC | 375069 | 16808 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 274798 | 8624 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 218080 | 5939 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | 46964 | 1310 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 25096 | 232 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 1506 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3901 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1944 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 770 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1193986849 | 2014-9-7 0:00:0 | CS | No Violations | |
-1422561716 | 2014-9-17 0:00: | DD | No Violations | |
-2121375891 | 2016-1-11 0:00: | PL | No Violations | 0.50 |
-2136273968 | 2014-9-9 0:00:0 | CS | No Violations | |
-410942271 | 2014-9-15 0:00: | DD | No Violations | |
-999209569 | 2013-8-15 0:00: | CS | No Violations | 4.00 |
0410942271 | 2014-09-15 | Drill / Deepen / Reopen | No Violations | Drilling ahead at 12000 in the lateral. |
0699449089 | 2013-08-12 | Drill / Deepen / Reopen | No Violations | Precision Drilling has two rigs drilling conductor holes and should be ready to cement tonight or Tues. |
0912390710 | 2014-09-29 | Drill / Deepen / Reopen | No Violations | Still trying to get their 5-1/2 casing to bottom. |
0999209569 | 2013-08-15 | Casing String Witnessed | No Violations | This job was scheduled for 10 am and then rescheduled for 1 pm . Precision Drilling drilled a 26inch diameter hole to 120 ft and set 120 ft of 20 inch diameter casing. Allied Cementing Service c/w 242 sks. Had to wait on water trucks and vacuum trucks. |
1193986849 | 2014-09-07 | Casing String Witnessed | No Violations | The rig ran 603 of 13-3/8 casing and the associated float equipment and Schlumberger cemented it with 580 sacks of Class cement. See the casing ticket for the details. |
1258134883 | 2016-02-19 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. With the exception of permitted well no. 34067212030000, which is utilizing a plunger lift system to produce. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 1 Horizontal heater-treater that was disconnected 1 combustor 1 low pressure separator/ Vapor recovery system 1 compressor There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1422561716 | 2014-09-17 | Drill / Deepen / Reopen | No Violations | A piece of the downhole moter was lost in the hole at 14592. The well will be sidetracked around the junk starting at 13800. |
1560231155 | 2019-8-22 0:00: | PW | No Violations | 0.60 |
2121375891 | 2016-01-11 | Preliminary Restoration | No Violations | On the day of my inspection, I witnessed the well was equipped with a production tree. Production equipment for the well included a sand trap and a gas production unit. Production equipment that was shared with permitted wells 34067212010000, 34067212030000, 34067212040000, 34067212050000, 34067212060000, 34067213240000, and 34067213250000 included a vapor recovery system, a gas compressor, a flare stack and 12-400 bbl. tanks that where placed inside proper containment. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
2136273968 | 2014-09-09 | Casing String Witnessed | No Violations | The rig ran 9-5/8 40 # R-3 J-55 casing and the associated float equipment to 1985. Schlumberger cemented the casing with 742 sacks of Class A SurfaceSet cement. 30 bbls of good cement were returned to surface. See the casing ticket for the details. |
699449089 | 2013-8-12 0:00: | DD | No Violations | 0.50 |
912390710 | 2014-9-29 0:00: | DD | No Violations |
For data sources see[10]