Well ID: 34-067-21237 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Freeport Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: US-OH-000822 | |
Farm/Lease Name: E CLARK SOUTH | |
License Status: Producing | |
License Date: 2013-08-29 | |
Spud Date: 2013-11-12 | |
Spud Drilling Contractor: NABORS DRILLING | |
Final Drill Date: 2014-04-06 | |
Well Total Depth: 16498.00 ft | |
Configuration: Horizontal | |
Latitude: 40.220000 | |
Longitude: -81.290000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-08-29 | Proposed Formations:POINT PLEASANT, Issued Date:8/29/2013, Expired Date:8/29/2015 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-11-29 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. TOTAL DEPTH CHANGED TO 13,088 FEET AND UNIT SIZE INCREASED TO 203.22 ACRES. |
Reached Total Depth | 2014-04-06 | |
Correction to Well | 2014-05-16 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 208.71 ACRES. ELEVATION CHANGED TO 1010' |
Correction to Well | 2015-01-16 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-08-28 | |
Construction Permit Expires | 2015-08-29 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-09-11 | 16187 | 8987 | 0 |
16187 | 8987 | 0 | |
16187 | 8987 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/22/2014 | 11/05/2014 | 7443 | 9,215,520.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | EC6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5 | 0.00012151 | 0 |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00072904 | 0 | ||||
Polyethylene Glycol | 25322-68-3 | 60 | 0.00145808 | 0 | ||||
7.5% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 8 | 0.0171401 | 0 | |
J580 | Schlumberger | Gelling Agent, Water | Carbohydrate Polymer | Proprietary | 100 | 0.0247573 | 0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00078449 | 0 | |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00073087 | 0 | |
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 11.8339 | 0 | |
J134 | Schlumberger | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 100 | 0.0016982 | 0 | |
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00102996 | 0 | |
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 87.9128 | 0 | |
A264 | Schlumberger | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00001919 | 0 | |
Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00005757 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.00007676 | 0 | ||||
Aliphatic acids | Proprietary | 30 | 0.00005757 | 0 | ||||
B466 | Schlumberger | Friction Reducer | Alcohol Ethoxylates | Proprietary | 5 | 0.00054997 | 0 | |
Ammonium Acetate | 631-61-8 | 6 | 0.00065997 | 0 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.00329985 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-10-22 | H2O | 8 | 403242 Gal | 450120 | Schlumberger | STAGE 1/31
45 SHOTS STAGES 2-30 SEE IMAGES |
2014-11-06 | H2O | 8 | 402948 Gal | 450120 | Schlumberger | STAGE 31/31
45 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHEVRON APPALACHIA LLC | 258657 | 67020 | 155 |
2016 | CHEVRON APPALACHIA LLC | 311520 | 53292 | 366 |
2017 | CHEVRON APPALACHIA LLC | 146489 | 21740 | 326 |
2018 | CHEVRON APPALACHIA LLC | 158360 | 21129 | 365 |
2019 | CHEVRON APPALACHIA LLC | 34740 | 4401 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHEVRON APPALACHIA LLC | Brine | 11315 | 155 |
2016 | CHEVRON APPALACHIA LLC | Brine | 12717 | 366 |
2017 | CHEVRON APPALACHIA LLC | Brine | 2899 | 326 |
2018 | CHEVRON APPALACHIA LLC | Brine | 2593 | 365 |
2019 | CHEVRON APPALACHIA LLC | Brine | 515 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1007008587 | 2016-3-30 0:00: | PL | No Violations | 0.50 |
-1502865712 | 2013-11-27 0:00 | DD | No Violations | 1.50 |
-523826378 | 2014-10-20 0:00 | PW | No Violations | 1.50 |
-896027473 | 2013-12-2 0:00: | DD | No Violations | 1.00 |
0405205342 | 2013-11-14 | Drill / Deepen / Reopen | No Violations | I was on location at the request of Inspector Mark Moreland to cover a conductor casing cement job in his absence. I arrived on location and met with the Chevron Company men and went over operations. An auger rig had drilled a 36 hole to a depth of 100. Joints of 30 steel casing were on the ground waiting to be cut and butt welded while being run into the hole. Chevron was currently waiting on a safety inspection before welding operations could begin. The casing would not be ready to cement for 6-8 hours and I left location. I was not able to cover this job. No violations. |
0523826378 | 2014-10-20 | Production Wells | No Violations | Return today to find the 300 gallons of oil has been cleaned up and contained in 2 roll off containers. The road is to be rocked today after I approve the clean up. The clean up is very complete and no sign of the oil remain, the road can be covered any time. |
0848027622 | 2015-01-07 | Production Wells | No Violations | Had a call from Jared Reichard of Chevron that wanted me to look at the area being developed at the Clark Pad and advise if I felt there was a problem. During my inspection I found that the area was snow covered and that most of what I wanted to look at was covered with 4 inches of snow. I could see that there is an addition to the size of the drilling pad but not much else. |
0896027473 | 2013-12-02 | Drill / Deepen / Reopen | No Violations | Highland Drilling Rig # 14 drilling on the intermediate section of the well. |
1007008587 | 2016-03-30 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted well is producing off of natural reservoir pressure. RBDMS indicated that the well is in producing order.
The production equipment on the pad consists of the following: 8 400 bbl. Production tanks 2 Producing wells 2 Sand separators 1 Low Pressure Separator 1 Combustor 2 Electric Compressors The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1413757182 | 2014-10-19 | Production Wells | No Violations | I received a call from Chevron Pa. office to advise me that a spill had occurred at the E.Clark site today around 3:00 P.M. The spill was from a 300 gallon container which was on a truck and slid off the truck and broke open on the lease road. It appears to be 90 wt. gear oil that has been spilled. Booms and adsorbent pads have been place over the oil to keep it from running off site. With the cooler temps the thick oil has remained on the lease road and should not run until it can be excavated and removed. Weavertown Environmental is responding with equipment to complete the clean up. The excavated oil will be placed in a roll off container until it can be properly disposed. |
1502865712 | 2013-11-27 | Drill / Deepen / Reopen | No Violations | I arrived on site today to check on the drilling status of Highland Drilling Rig # 14 after they called to inform me they were close to drilling. They advised me that they were rigged up on the # 7 Clark well and I collected my GPS reading and found out that they are on the # 5 |
1693441659 | 2013-12-06 | Casing String Witnessed | No Violations
-117, 0.8% CR-220 (Nova Blend Cement with a 15.3ppg and a yield of 1.01cuft/sack. Displaced cement with 235bbls of fresh water, plug landed and pressured up to 918psi and plug held with 60bbls of cement returned to surface. | |
1868865648 | 2019-8-27 0:00: | PW | No Violations | 0.80 |
405205342 | 2013-11-14 0:00 | DD | No Violations | |
475919292 | 2020-2-24 0:00: | PW | No Violations | 1.00 |
848027622 | 2015-1-7 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]