If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21402 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.22,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Moorefield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001134 | |
Farm/Lease Name: RHF SPROULL NTG HR | |
License Status: Producing | |
License Date: 2018-08-16 | |
Spud Date: 2015-05-07 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-10-21 | |
Well Total Depth: 18131.00 ft | |
Configuration: Horizontal | |
Latitude: 40.220000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-30 | Proposed Formations:TRENTON, Issued Date:9/30/2014, Expired Date:9/29/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-05-20 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/20/2015, Expired Date:5/19/2017 12:00:00 PM, Drilling unit acres:967.265, Proposed Well Type:OG, Proposed Well Class:POOL |
Change of Owner | 2015-08-31 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC |
APP | 2015-09-25 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/25/2015, Expired Date:9/24/2017 12:00:00 PM, Drilling unit acres:967.261, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2015-10-06 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:10/6/2015, Expired Date:10/5/2017 12:00:00 PM, Drilling unit acres:967.261, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2018-08-16 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/16/2018, Expired Date:8/15/2020 12:00:00 PM, Drilling unit acres:967.261, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-10-21 | |
Correction to Well | 2019-04-26 | UPDATE TARGET/TAKE AS-DRILLED PLAT |
Record Last Modified | 2019-06-11 | |
Construction Permit Expires | 2020-08-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
21841 | 21947 | 0 | |
8255 | 8376 | 0 | |
8255 | 8376 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/15/2018 | 01/03/2019 | 8168 | 13,252,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FIGHTR EC-3 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 |
Propargyl alcohol | 107-19-7 | 5 | 0.00001853 | 24 | ||||
Sodium nitrate | 7631-99-4 | 60 | 0.0146021 | 18623 | ||||
Methanol | 67-56-1 | 100 | 0.00649081 | 8279 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 12.7823 | 16,301,600.0 | ||||
Contains no hazardous substances
in concentrations above cut-off values according to the competent authority |
CAS Not Assigned | 100 | 0.00168763 | 2153 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000111162 | 142 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0287251 | 36635 | ||||
Inorganic salt | Proprietary | 30 | 0.00251207 | 3204 | ||||
Acrylamide polymer | Proprietary | 30 | 0.026213 | 33431 | ||||
Polyoxyalkylene | Proprietary | 5 | 0.00436883 | 5572 | ||||
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.00612028 | 7806 | ||||
Ethoxylated alcohols | Proprietary | 5 | 0.00001853 | 24 | ||||
Citric acid | 77-92-9 | 60 | 0.00160378 | 2046 | ||||
Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0091251 | 11638 | ||||
Sobitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 5 | 0.00436883 | 5572 | ||||
Acrylamide acrylate polymer | Proprietary | 30 | 0.00251207 | 3204 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0378862 | 48317 | ||||
MC MX 5-2402 | MultiChem | Biocide Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
OptiKleen-WF | Halliburton | Concentrate | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-30/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE - 100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1296-17 | Haliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
MC MX 8-4543 | MultiChem | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.5582 | 110,390,000.0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.576444 | 735158 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 93983 | 16827 | 31 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 2686 | 31 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1194471783 | 2020-9-29 0:00: | PW | No Violations | 0.50 |
-1226758599 | 2018-10-15 0:00 | DD | No Violations | 1.00 |
-1545862606 | 2018-11-27 0:00 | CT | No Violations | 1.00 |
-27572412 | 2018-3-15 0:00: | DD | No Violations | 1.00 |
-50391486 | 2018-12-26 0:00 | CT | No Violations | 1.00 |
-621594573 | 2019-1-3 0:00:0 | CT | No Violations | 1.00 |
0027572412 | 2018-03-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found this pad to contain 1 properly labeled producing well and four conductors/cellars that are not labeled. Production equipment includes one GPU, a vapor recovery tower, combustor, compressor, and four 500 barrel steel tanks. Steel tanks are in metal containment and there is a berm around pad. There is no drilling equipment onsite. Outslopes of pad are stable and vegetated. Pad is fenced and locked. Per ORC 1509.072A this permit is not eligible for a preliminary restoration until it is drilled to total depth. |
0050391486 | 2018-12-26 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. Wireline just came out of this well on stage 34. Plug is set at 13121 with bottom perforation at 13111 and top perforation at 12991. Intermediate annular pressure was 412 psi. |
0570582466 | 2018-12-20 | Completion Testing | No Violations | On the day of my inspection I was accompanied by Geologist Tammy Richards. A halliburton frac crew is on location. Stage 10/65 had plug set at 16721, with bottom perf at 16711 and top perf at 16591. Equipment is down for maintenance and no frac is ongoing. Surface annular pressure is 400 psi and intermediate annular is 0 psi. |
0621594573 | 2019-01-03 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew performing a final pressure test on kill plugs in the 1H well. This well had two kill plugs set in it today at 7945 and 7830. Plugs passed a negitive and a positive pressure test. Halliburton will be moving off of location starting today. Surface and intermediate annular pressures are 100 and 250 respectively. |
1226758599 | 2018-10-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 795 was picking up a their bottom hole assembly. Current hole depth is 8776 feet with an 8.75 inch diameter bit. Hole will be 8.5 inch diameter from here to total depth. Identified myself to company man Larry Hart. |
1409561326 | 2020-1-28 0:00: | PW | No Violations | 1.00 |
1539260131 | 2018-10-11 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the second stage of the 9.625 inch diameter cement job. Patterson 795 drilled a 12.25 inch diameter hole to a depth of 7356 feet. Wyoming ran 7348 feet of 9.625 inch diameter casing, 40#/ft, p-110. Shoe track is 90 feet long. DV tool set at 3492. Weatherford inflatible packer set at 3294. Packer set at 2650 psi. On the first stage, Schlumberger pumped 40 barrels of 11 ppg mudpush, 140 barrels of class A lead cement, and 120.4 barrels of class A tail cement. Lead cement weighed 12 ppg and yield of 1.79. Tail cement weighed 15.6 ppg and yield of 1.19. Cement displaced with 550 barrels of oil base mud. 20% excess cement ran in open hole. Set packer and opened DV tool to circulate well. 30 barrels of mudpush returned to surface. Started second stage. Schlumberger again pumped 40 barrels of 11 ppg mudpush, 245 barrels of class A cement weighing 15.6, yield 1.19. cement displaced with 265 barrels of oil based mud. 35% excess cement ran in open hole. |
1545862606 | 2018-11-27 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton frac crew on location. Identified myself to company man Justin. This well has not been stimulated. There are 63 stages to be completed. Intermediate annular pressure was 0. |
1715515688 | 2018-12-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. Surface annular pressure is 0 and intermediate annular pressure is 250. They have not started stimulation on this well yet. |
1896684341 | 2019-01-29 | Completion Testing | No Violations | On the day of my inspection I witnessed CWS rig 7009 onsite. This well has had frac plugs drilled out and 3803 feet of 2.875 inch diameter tubing ran. Surface annular pressure is 150 and intermediate annular pressure was 400. |
2117096258 | 2019-05-08 | Preliminary Restoration | No Violations | On the day of my inspection I am visiting pad at the request of Adam Schroeder on behalf of Mr. Humpreys. Mr. Humpreys was concerned with no production on the 9H well which was due to shutting it in to drill the 1H, 3H, 5H, and 7H wells. Email was sent to Adam Schroeder informing him the well is back in production. This well is currently producing off of natural reservoir pressure. Production equipment includes five GPUs, five sand seperators, two line heaters, one combustor, three compressors, two vapor recovery towers, and eight 500 barrel steel tanks, within their own containment. The 13.375x9.625 annular pressure was 170 psi and the 9.625x5.5 annular pressure is 327 psi. Pad is stable and vegetated. Site meets requirements of 1509.072 (A) for preliminary restoration. |
570582466 | 2018-12-20 0:00 | CT | No Violations | 1.00 |
For data sources see[9]