Well ID: 34-067-21437 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.39,"lon":-81.07,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: North Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001215 | |
Farm/Lease Name: GARVEY 25-12-5 | |
License Status: Producing | |
License Date: 2015-02-13 | |
Spud Date: 2015-02-11 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-03-04 | |
Well Total Depth: 13412.00 ft | |
Configuration: Horizontal | |
Latitude: 40.390000 | |
Longitude: -81.070000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-01-27 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:1/27/2015, Expired Date:1/26/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-02-13 | Proposed Formations:POINT PLEASANT, Issued Date:2/13/2015, Expired Date:2/12/2017 12:00:00 PM, Drilling unit acres:314.56, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-03-04 | |
Correction to Well | 2015-07-31 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-04-27 | |
Construction Permit Expires | 2017-02-12 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-05-12 | 8485 | 13264 | 733 |
8485 | 13264 | 733 | |
8485 | 13264 | 733 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/11/2015 | 04/21/2015 | 8065 | 8,446,030.0 | 539177 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Water | 007732-18-5 | 93 | 0.67483 | 0 | |
Carbohydrate polymer | NA | 100 | 0.07138 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01125 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.05472 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00008000 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00539 | 0 | ||||
Water | 007732-18-5 | 85 | 0.02594 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00033 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00063 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 11.7478 | 0 | ||||
Hydrogen Chloride | 007647-01-0 | 15 | 0.00458 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.01845 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.41774 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.01845 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00433 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00024 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00032 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00063 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00024 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00563 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00043 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 86.2573 | 0 | |
OilSafe AR (Acid Replacement) | HEARTLAND SOLUTIONS | Acid | Patented Synthetic Acid | TRADE SECRET | 100 | 0.00871 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.5979 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-04-11 | H2O | 15 | 1926 Bbl | 4652 | Schlumberger | STAGE 1/31
5 SHOTS STAGES 2-28 SEE IMAGES |
2015-04-21 | H2O | 8 | 994 Bbl | 142680 | Schlumberger | STAGE 31/31
15 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | CHESAPEAKE EXPLORATION LLC | 791303 | 54047 | 291 |
2017 | CHESAPEAKE EXPLORATION LLC | 338324 | 11103 | 264 |
2018 | CHESAPEAKE EXPLORATION LLC | 324504 | 8194 | 322 |
2019 | CHESAPEAKE EXPLORATION LLC | 63608 | 1862 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 12204 | 291 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3459 | 264 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1708 | 322 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 777 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1679998815 | 2018-4-10 0:00: | PL | No Violations | 1.00 |
-1977097317 | 2018-11-6 0:00: | PL | No Violations | 1.00 |
-354509496 | 2020-8-17 0:00: | PW | No Violations | 1.00 |
-854577852 | 2017-8-30 0:00: | PL | No Violations | 1.00 |
0124099000 | 2016-02-18 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted well is chained off with all valves in the closed position. RBDMS production records show zero production for the well. It appears that the gas line has yet to be connected to the well allowing for the production of gas.
The production equipment on the pad consists of the following: 6 400 bbl. Production tanks 1 Well bore, that was shut in at the time of my inspection. 1 Sand separator 1 Horizontal heater-treater 1 Low pressure separator tower/Vapor recovery system unit. 1 Combustor 1 Gas compressor unit. There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0268435850 | 2015-03-05 | Drill / Deepen / Reopen | No Violations | I arrived today to check on the drilling status of Nomac Drilling Rig # 77 and found that they are a 8.5 inch diameter hole on oil base drilling mud at 14,000 ft. I checked on the drilling solids controls and liner stability and did not find any problems. It is very cold out today and the location is covered with ice and snow. Poor roads all around the area due to conditions |
0854577852 | 2017-08-30 | Preliminary Restoration | No Violations | On the day of my inspection I found the Garvey pad to contain one properly identified wellhead and three cellars with conductor casings. Production equipment includes four gas production units with four vertical sand seperators. Six 400 barrel steel tanks with identification contained in a metal dike. Three are produced water and three are condensate. Annualar pressure on the 9 5/8 inch diameter casing is 550 psi, 13 3/8 annular pressure is 0 psi. Well is equipped with a christmas tree style wellhead with chains on all valves. Well is loaded with water and a backpressure valve until drilling of the next three wells are completed. Production records are current in RBDMS. Lease road is gated and pad is fenced and locked. Site passes preliminary restoration according to ORC 1509.072A. |
124099000 | 2016-2-18 0:00: | PL | No Violations | 1.00 |
1267730827 | 2015-03-04 | Drill / Deepen / Reopen | No Violations | Drilling ahead in the lateral at 11,711. Estimated total measured depth is 13,428. |
1424363581 | 2015-02-12 | Casing String Witnessed | No Violations | I am on site today to witness the running and the cementing of the 20 inch diameter casing string. Express Drilling drilled a 26 inch diameter hole to 120 ft. and set 120 ft. of 94 lb. casing. Express Energy Service cemented with 230 sacks of class A cement at 15.6 lb. and a yield of 1.20 they did not circulate cement to surface. It was discovered that the top of the cement was 15 ft. from surface and needs to be topped off. |
1424950797 | 2015-02-25 | Casing String Witnessed | No Violations | The rig ran 15 joints of 13-3/8 54.5# R-3 J-55 casing to 549. O-Tex cemented it with 510 sacks of Class H cement. Good cement was returned to the surface. The casing was tested to 500 psig over plug landing pressure with no drop off. See the casing ticket for the details. |
1425303667 | 2015-02-27 | Casing String Witnessed | No Violations | The rig ran 54 joints of 9-5.8 40 # casing to 2202. O-Tex Pumping cemented it with 820 sacks of Class H cement. Good cement was returned to the surface. The casing pressure test met the state requirements. See the casing ticket for the details. |
1425487276 | 2015-02-23 | Drill / Deepen / Reopen | No Violations | I met with Mackey Lambert Drilling Consultant for Nomac Drilling Rig 77 and discussed the drilling and permit conditions. This location has the potential of having H2S ( Big Lime). At the entrance to the location the drilling permit and conditions are posted and warning signs with three (3) wind directions socks thru out the drilling pad. There is monitors in the cellar and drilling floor and at the gas buster. There is an alarm in the Company trailer. All muster points are marked. At present there are no noted violations. |
1679998815 | 2018-04-10 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad containing 4 properly labeled well that are producing on natural reservoir pressure. All wells have christmas tree style wellheads. Pressure gauges read as follows: Surface 0 psi, Intermediate 538 psi, Production 531 psi, and Tubing 510 psi. Production equipment includes six 400 barrel steel tanks within their own steel containment, two compressors, four sand separators, four GPUs, a vapor recovery stack, and a combustor. One heater treater onsite. Site is stable and vegetated. Site meets preliminary restoration requirements of 1509.072A. |
1977097317 | 2018-11-06 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed this pad containing 4 producing wells. This well is equipped with a plunger lift system operated by a motor valve. Surface annular pressure is 0 and intermediate annular is 360. Production equipment includes 4 GPUs, 4 sand seperators, 1 compressor, a combustor, vapor recovery tower, and 6 400 barrel steel tanks in their own containment. Three tanks are condensate and three are produced water. Site meets requirements of OAC 1509.072A for preliminary restoration. |
268435850 | 2015-3-5 0:00:0 | DD | No Violations | 2.00 |
918708143 | 2019-11-4 0:00: | PW | No Violations | 1.00 |