If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21452 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.19,"lon":-80.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Athens Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001238 | |
Farm/Lease Name: FOXTROT ATH HR | |
License Status: Producing | |
License Date: 2015-03-05 | |
Spud Date: 2015-10-19 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2016-02-29 | |
Well Total Depth: 16115.00 ft | |
Configuration: Horizontal | |
Latitude: 40.190000 | |
Longitude: -80.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-03-05 | Proposed Formations:POINT PLEASANT, Issued Date:3/5/2015, Expired Date:3/4/2017 12:00:00 PM, Drilling unit acres:733.781, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2016-01-08 | CORRECTION TO CASING PROGRAM |
Reached Total Depth | 2016-02-29 | |
Construction Permit Expires | 2017-03-04 | |
Completion Report Received | 2018-08-30 | |
Change of Owner | 2018-10-15 | Operator changed from 8870, HESS OHIO DEVELOPMENTS LLC to 9520, ASCENT RESOURCES UTICA LLC |
Correction to Well | 2018-10-19 | CHANGE IN WELL NAME AND NUMBER (PREVIOUS: ATHENS F #5H-5) |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-09-05 | 9447 | 9519 | 34 |
2018-09-05 | 15860 | 15978 | 34 |
15860 | 15978 | 34 | |
9447 | 9519 | 34 | |
9447 | 9519 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-24 | H2O | 7 | 4486 Bbl | 250580 | US Well Services Inc | STAGE 62/62
STAGES 2-61 SEE IMAGES |
2018-04-30 | H2O | 7 | 7940 Bbl | 255200 | US Well Services Inc | STAGE 1/62
STAGES 2-61 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 1233700 | 1680 | 149 |
2019 | ASCENT RESOURCES UTICA LLC | 840680 | 350 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 5693 | 149 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 3247 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2053474468 | 2018-8-28 0:00: | PW | No Violations | 1.00 |
-236321532 | 2015-11-25 0:00 | CS | No Violations | 5.00 |
-970156806 | 2018-3-15 0:00: | PL | No Violations | 1.00 |
-99793425 | 2015-11-24 0:00 | CS | No Violations | 7.00 |
0099793425 | 2015-11-24 | Casing String Witnessed | No Violations | I am on site accompained by Inspector Bennett to witness a mine string cement job on HWD (Horizontal Well Drillers) Rig No. 11. HWD drilled a 22 inch diameter hole to 191 feet and set 181 feet of 18 5/8 inch diameter, 87.5 pound casing. There are two cement baskets on this job, one at 100 feet and one at 120 feet. There is a float collar at 161 feet. Schlumberger is performing the cement job, using 185 sacks of class A 15.6 pound, 1.2 yield cement. This volume should have been enough to bring cement returns to surface, however there were no returns of any kind witnessed at surface. Next HWD placed 1 1/4 inch diameter tubing in the annular space to 60 feet, then Schlumberger pumped 61 sacks of class A cement and topped off to surface. Inspector Bennett and I witnessed good returns to surface. |
0236321532 | 2015-11-25 | Casing String Witnessed | No Violations | Inspector Andrew Corder and I are on site to witness the surface casing cement job. HWD(Horizontal Well Drillers) Rig No.11 drilled a 17 1/2 inch diameter hole to a depth of 368 feet. HWD then ran 13 3/8 inch diameter, 54.5 pound per foot casing to a depth of 358 feet. HWD placed a shoe at 358 feet and a float collar at 319 feet. Schlumberger is preforming the cement job using 400 sacks of Class A 15.6 pound, 1.2 yield cement. Inspector Corder and I witnessed 20 bbl. of good cement returns to surface. |
0926648176 | 2018-05-07 | Completion Testing | No Violations | On the day of my inspection US Well Service was onsite rigged up to the 3h, 4h, and 5h wells. This well is on the 13th out of 62 frack stages. Well has 10 psi on intermediate annular and 0 psi on the surface annular. There is no fracking ongoing at the time of the inspection. |
0970156806 | 2018-03-15 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad to contain 5 wells. Current operations on the pad are installing frac stacks on the wells in preparation for well stimulation in April. Outslopes of pad are vegetated and stable. A crane and frac tanks are on location. Site meets requirements of ORC 1509.072A for preliminary restoration. |
1448385162 | 2015-11-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection accompanied by ODNR Inspector Joe Zollars, I witnessed that Horizontal Well Drillers HWR Rig #11 had drilled a 22 inch diameter hole to the depth of 191 feet drilling through a mine shaft from 136 feet to 124 feet. HWR ran 181 feet of 18.625 inch 87.5#/ft. casing with cement baskets at 120 feet and 100 feet. Schlumberger was onsite pressure tested lines, pumped 25bbls of gel, 10bbls of fresh water and 185 sacks of Class A cement with a yield of 1.2cuft/sk. Cement weight was verified with mud scales and displaced to 98 feet with 30bbls of fresh water and casing was shut-in. With no returns cement baskets were opened with two 5-gallon buckets of pea gravel and top off job was completed by Schlumberger through 60 feet of 1.25 inch tubing and pumping 61 sacks of Class A cement circulating cement to surface. |
1720593870 | 2019-11-26 0:00 | PW | No Violations | 1.00 |
2053474468 | 2018-08-28 | Production Wells | No Violations | On the day of my inspection I am viewing pad for complaint 5946. Royalty owner is concerned they are not going to get paid for production because lease is apparently transferring to Ascent resources. Pad contains 5 plunge lift wells with valves open. Production equipment includes 5 GPUs, a compressor, and three 400 barrel steel tanks in their own containment. Surface annular pressure is 0 and intermediate annular pressure is 0. Spoke with landowner after royalty owner after inspection and he believes the situation has been corrected. Complaint can be closed. |
926648176 | 2018-5-7 0:00:0 | CT | No Violations | 1.00 |
For data sources see[9]