If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21525 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: DEFREEST | |
License Status: Well Drilled | |
License Date: 2016-11-16 | |
Spud Date: 2017-11-19 | |
Spud Drilling Contractor: | |
Final Drill Date: 2017-12-06 | |
Well Total Depth: 6261.00 ft | |
Configuration: Vertical | |
Latitude: 40.360000 | |
Longitude: -81.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-11-16 | Proposed Formations:CLINTON, Issued Date:11/16/2016, Expired Date:11/16/2018 12:00:00 PM, Drilling unit acres:332, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-12-06 | |
Record Last Modified | 2018-10-04 | |
Construction Permit Expires | 2018-11-16 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/19/2018 | 06/19/2018 | 6130 | 210790 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Producers Service Corp | Proppant | Crystalline Silica (quartz) | 14808-60-7 | 100 | 7.85861 | 152000 |
BIO CLEAR 2000 | Producers Service Corp | Biocide | Polyethylene Glycol | 25322-68-3 | 70 | 0.0172752 | 334.134 | |
2,2-dibromo-3-nitriloproplonamide | 10222-01-2 | 40 | 0.00987154 | 190.934 | ||||
Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.945 | 1,759,040.0 | |
STIMOIL EN | Producers Service Corp | Surfactant | Citrus Terpenes | 68647-72-3 | 5 | 0.00444392 | 85.954 | |
Isopropyl alcohol | 67-63-0 | 30 | 0.0266635 | 515.721 | ||||
4N1 | Producers Service Corp | Inhibitor | Acetic acid | 64-19-7 | 90 | 0.00316856 | 61.286 | |
Diethanolamine | 111-42-2 | 1 | 0.00003521 | 0.681 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.000352062 | 6.81 | ||||
Cocamide Diethanolamine | 68603-42-9 | 5 | 0.000176031 | 3.405 | ||||
Methanol | 67-56-1 | 10 | 0.000352062 | 6.81 | ||||
FRA 409 | Producers Service Corp | Friction Reducer | Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,
chloride, polymer with 2-propenamide |
69418-26-4 | 70 | 0.0588927 | 1139.09 | |
Adipic acid | 124-04-9 | 3 | 0.00252397 | 48.818 | ||||
Petroleum Distillates | 64742-47-8 | 10 | 0.00841324 | 162.728 | ||||
Alcohols, C12-14-secondary, ethoxylated | 84133-50-6 | 5 | 0.00420662 | 81.364 | ||||
PRO CLA FIRM LP | Producers Service Corp | Clay Control | Ethylene Glycol | 107-21-1 | 40 | 0.0125638 | 243.006 | |
2-Propen-1-aminium,N,N-dimethyl-N-2-propenyl,chloride,homopolyme
2-Propen-1-aminium,N,N-dimethyl-N-2-propenyl,chloride,homopolymer |
26062-79-3 | 20 | 0.00628189 | 121.503 | ||||
PRO GEL 4 | Producers Service Corp | Gelling Agent and Thinkener | Guar Gum Blend | 9000-30-0 | 100 | 0.0271812 | 525.735 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Adipic acid | 124-04-9 | 3 | 0.00252397 | 48.818 | |
Ethylene Glycol | 107-21-1 | 14 | 0.00007611 | 1.472 | ||||
Petroleum Distillates | 64742-47-8 | 10 | 0.00841324 | 162.728 | ||||
2,2-dibromo-3-nitriloproplonamide | 10222-01-2 | 40 | 0.00987154 | 190.934 | ||||
Cocamide Diethanolamine | 68603-42-9 | 5 | 0.000176031 | 3.405 | ||||
2-Propen-1-aminium,N,N-dimethyl-N-2-propenyl,chloride,homopolyme
2-Propen-1-aminium,N,N-dimethyl-N-2-propenyl,chloride,homopolymer |
26062-79-3 | 20 | 0.00628189 | 121.503 | ||||
Diethanolamine | 111-42-2 | 1 | 0.00003521 | 0.681 | ||||
Methanol | 67-56-1 | 10 | 0.000352062 | 6.81 | ||||
Citrus Terpenes | 68647-72-3 | 5 | 0.00444392 | 85.954 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.000352062 | 6.81 | ||||
Alcohols, C12-14-secondary, ethoxylated | 84133-50-6 | 5 | 0.00420662 | 81.364 | ||||
PRO BREAKER 4 | Producers Service Corp | Breaker | Ethylene Glycol | 107-21-1 | 14 | 0.00007611 | 1.472 | |
Sucrose | 57-50-1 | 46 | 0.000250067 | 4.837 | ||||
IC Acid (15%) | Producers Service Corp | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.139789 | 2703.78 | |
FERRIPLEX 80 | Producers Service Corp | Iron Control | Sodium Erythorbate | 6381-77-7 | 98 | 0.00405339 | 78.4 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-06-19 | H2O | 0 | 5019 Bbl | 152000 | Producers Service Corporation | On the day of my inspection I witnessed Producer's Service Corp rig up to the well to frac 1 stage. Perforations were shot yesterday from 6070-6130 feet. There are 25 perforations over 60 feet. RDHK representatives Mark Natolli, Scott Ghezzi, and John Garbrant were onsite. Red Hill had their own service rig set up over the well. 35 balls were dropped. 2000 gallons of 15% HCl and 5019 barrels of water were used, along with 7500# of 100 mesh sand and 144500# of 20/40 mesh sand. Initial Shut In Pr |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | RHDK OIL & GAS LLC/DBA RED HIL | 0.00 | 0.00 | 365 |
2018 | RHDK OIL & GAS LLC/DBA RED HIL | 410.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 971 | 365 |
2018 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 2948 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1381287444 | 2018-6-19 0:00: | CT | No Violations | 6.00 |
-1897019421 | 2018-3-19 0:00: | PL | No Violations | 1.00 |
0968013041 | 2017-11-20 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Kilbarger rig 5 had driled a 14.75 inch diameter hole to a depth of 170 feet and ran 170 feet of 11.75 inch diameter casing. Petroset was onsite with 150 sacks of class A cement to cement the casing back to surface. Yield is 1.18 and weight is 15.6 ppg.Cement displaced with 20 barrels of fresh water. 9 barrels of cement returned to surface. Wellbore was circulated bottoms up prior to pumping. Drilling pits are in place, lined, and appear to be functioning as designed. |
1381287444 | 2018-06-19 | Completion Testing | No Violations | On the day of my inspection I witnessed Producers Service Corp rig up to the well to frac 1 stage. Perforations were shot yesterday from 6070-6130 feet. There are 25 perforations over 60 feet. RDHK representatives Mark Natolli, Scott Ghezzi, and John Garbrant were onsite. Red Hill had their own service rig set up over the well. 35 balls were dropped. 2000 gallons of 15% HCl and 5019 barrels of water were used, along with 7500# of 100 mesh sand and 144500# of 20/40 mesh sand. Initial Shut In Pressure (ISIP) was 1674, 5 minute ISIP was 1643, and 10 minute ISIP was 1625. |
1511884706 | 2017-11-28 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Kilbarger rig 5 had driled an 11 inch diameter hole to a depth of 1484 feet and ran 1445 feet of 24#/foot, 8.625 inch diameter casing. Petroset was onsite with 400 sacks of cement. 200 sacks of class A and 200 sacks of lite cement. Cement has yields of 1.18 and 1.5 respectively. Wellbore was loaded with fresh water prior to cementing. 20 barrels of gel with cottonseed hulls was mixed and pumped. Drilling pits are in place, lined, and appear to be functioning as designed. 10 barrels of cement returned to surface. 89 barrels of displacement. Shoe track is 40 feet long. |
1897019421 | 2018-03-19 | Preliminary Restoration | No Violations | On the day of my inspection I found that the pits have been pushed closed and all drilling equipment has been removed. A Caterpillar d6 dozer and 2 frack tanks remain onsite. Site needs vegetated before a preliminary restoration can be passed. Well is equipped 8.625 inch diameter casing, 4.5 inch diameter casing, a 2 inch diameter changeover, and a gate valve. Gate valve is open tocap with needle valve, which is closed. No production equipment noted. |
697817939 | 2020-1-28 0:00: | PL | No Violations | 1.00 |
968013041 | 2017-11-20 0:00 | CS | No Violations | 3.00 |
For data sources see[9]