If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21543 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: German Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001531 | |
Farm/Lease Name: MICKEY 18-10-4 | |
License Status: Producing | |
License Date: 2018-01-19 | |
Spud Date: 2018-03-29 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-05-05 | |
Well Total Depth: 22284.00 ft | |
Configuration: Horizontal | |
Latitude: 40.370000 | |
Longitude: -80.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-01-19 | Proposed Formations:POINT PLEASANT, Issued Date:1/19/2018, Expired Date:1/19/2020 12:00:00 PM, Drilling unit acres:319.01, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-05-05 | |
Correction to Well | 2018-08-24 | ACREAGE TAKE TARGET AS-DRILLED |
Completion Report Received | 2018-09-26 | |
Record Last Modified | 2018-10-02 | |
Construction Permit Expires | 2020-01-19 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-01 | 9120 | 9281 | 0 |
2018-10-01 | 22116 | 22216 | 0 |
22116 | 22216 | 0 | |
9120 | 9281 | 0 | |
9120 | 9281 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/29/2018 | 07/22/2018 | 8648.4 | 17,669,900.0 | 1,192,600.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 0.02 | 0 | 0 |
Northern White Sand | BJ SERVICES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 1 | 0.12426 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 0.01 | 0 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.78548 | 0 | |
CI-14 | BJ SERVICES | Corrosion Inhibitor | Proprietary Fatty Acids | Trade Secret | 0.1 | 0 | 0 | |
Proprietary Polyoxyalkylenes | Trade Secret | 0.2 | 0 | 0 | ||||
Proprietary Olefin | Trade Secret | 0.05 | 0 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 0.05 | 0 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 0.7 | 0.00001000 | 0 | ||||
ThinFrac MP I | BJ SERVICES | Friction Reducer | Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 0.3 | 0.00027 | 0 | |
Oxyalkylated alcohol | Trade Secret | 0.05 | 0.00005000 | 0 | ||||
Sodium Chloride | 7647-14-5 | 0.05 | 0.00005000 | 0 | ||||
GBW-5 | BJ SERVICES | Breaker | Ammonium Persulfate | 007727-54-0 | 1 | 0 | 0 | |
HCL 5.1 - 7.5 | BJ SERVICES | Acid | Water | 007732-18-5 | 0.93 | 0.00009000 | 0 | |
Hydrochloric Acid | 007647-01-0 | 0.08 | 0.00001000 | 0 | ||||
ResCare IC 300L | BJ SERVICES | Iron Control Agent | Citric Acid | 000077-92-9 | 0.5 | 0.00004000 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.07843 | 0 | |
HCL10.1 - 15 | BJ SERVICES | Acid | Water | 007732-18-5 | 0.85 | 0.00897 | 0 | |
Hydrochloric Acid | 007647-01-0 | 0.15 | 0.00158 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-06-29 | H2O | 15 | 5304 Bbl | 198566 | BJ Services Company | STAGE 1/66
STAGES 2-65 SEE IMAGES |
2018-07-22 | H2O | 15 | 5977 Bbl | 339994 | BJ Services Company | STAGE 66/66
STAGES 2-65 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | 2753508 | 0 | 143 |
2019 | CHESAPEAKE EXPLORATION LLC | 1049240 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 23186 | 143 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 616 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1553309707 | 2018-6-20 0:00: | CT | No Violations | 1.00 |
-375087413 | 2018-5-4 0:00:0 | DD | No Violations | 1.00 |
-535561661 | 2018-5-7 0:00:0 | DD | No Violations | 1.00 |
-650414535 | 2020-2-10 0:00: | PW | No Violations | 1.00 |
0140605272 | 2019-05-14 | Work Over Reconditioning | No Violations | On the day of my inspection I was accompanied by Inspector Jeff Adams. During our inspection Conserv Inc. was swabbing the well. Company representative Bob Vandermulen said that Stone Rig #15 ran 8999 feet of 2.875 inch diameter tubing in the well over the weeekend. The 13.375x9.625 annular pressure is 80 psi and the 9.625x5.5 annular pressure is 140 psi. |
0220866799 | 2018-07-26 | Completion Testing | No Violations | On the day of my inspection I witnessed that the frac operator has moved off of the pad. Aboveground storage tank and 12 frac tanks remain onsite. Well connect is entering through the southern edge of the pad. No personnel onsite but fence is down and ground is excavated. Production equipment includes two 400 barrel steel tank inside containment, four sand seperators, and four GPUs. Wellhead gauges read 0 psi on surface, intermediate, and production casing. This well has not been drilled out or flowed back. Wellpad outslopes are stable and vegetated execpt for well connect disturbance. |
0375087413 | 2018-05-04 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 580 drilling their lateral section at a depth of 18326 feet. Rig is running 12 ppg mud with no flare. Pad drains are shut. Rain is area last night and everything appears stable. |
0535561661 | 2018-05-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed patterson 580 had reached total depth of 22,284 and wyoming casing is onsite running 5.5 inch diameter casing. |
0757118125 | 2018-03-30 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Express had augured a 32 inch diameter hole to 120 feet. 120 feet of 20 inch diameter conductor casing was run. Express was onsite with 471 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. Cement was displaced with 39 barrels of fresh water. 24 barrels of cement returned to surface. Express cement supervisor Brian Sparks and David Newman CHK superintenent both onsite. |
139046880 | 2019-10-10 0:00 | PW | No Violations | 1.00 |
140605272 | 2019-5-14 0:00: | WR | No Violations | 1.00 |
1487939334 | 2018-08-20 | Completion Testing | No Violations | On the day of my inspection I witnessed Falcon EFS flowback services onsite rigging up desanding units. ID to company man Brian Waid. Two wells are on location. These wells are set up to produce directly out of the 5.5 inch diameter production casing, on each side of the wellhead. There are six desanders onsite. Production equipment includes four line heaters, four sand seperators, four GPUs, and two 400 barrel steel tanks in their own containment. |
1524642203 | 2018-04-25 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Patterson 580 drilled a 17.5 inch diameter open hole to a depth of 716 feet. Previous casing set and cemented was 20 inch diameter conductor casing to a depth of 120 feet. Wyoming casing ran 701 feet of 13.375 inch diameter casing, j-55, 54.5 lbs/foot. Casing was centralized with 17 centralizers. Shoe track is 41 feet long. CJ/Otex was onsite with 745 sacks of class H cement. Additives include 1% CaCl and 2% gypsum. Cement weighed with mudscale at 16.6 ppg and yield of 1.07. 50% excess ran in open hole. Cement displaced with 102 barrels of fresh water. 30 barrels of gel pumped ahead of cement. 30 barrels of 16.2 ppg cement returned to surface, and floats held with .75 barrels back. |
1530895404 | 2018-07-06 | Completion Testing | No Violations | On the day of my inspection I witnessed BJ services was rigged up on this well and permit 21544. Currently this well has a wireline in the wellbore to perforate stage 18. Top of perforation will be 18720 and bottom perforation will be 18881. There are five guns with 6 shots for a total of 30 perforations. Spacing is 40 feet apart. This stage will have 330000 pounds of sand pumped. Surface and intermediate annualr pressures are zero. Fresh water aboveground storage tank (AST) on location. |
1531752427 | 2018-07-16 | Completion Testing | No Violations | On the day of my inspection I witnessed BJs frac crew on location. Surface annular pressure is 0 and intermediate annular pressure is 0. Stage 50 is next. Wireline is going into the wellbore to shoot perforations from 12480 to 12320. Plug is at 12501. Well will be perforated with 5 guns with 6 shots each on 40 foot spacing. |
1546281955 | 2018-12-31 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad to contain two properly labeled wellheads. These wells are set up to produce directly out of the 5.5 inch diameter production casing, on each side of the wellhead, and are doing so on natural reservior pressure. There are five desanders onsite left over from flow back. They are dissconected from wells. Production equipment includes three line heaters (not plumbed in), four sand seperators, four GPUs, and two 400 barrel steel tanks in their own containment. Surface annular pressure is 50 and intermediate annular is 150. Site meets requirements of 1509.072A for preliminary restoration. |
1553309707 | 2018-06-20 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain two wellheads equipped with frac stacks. Two other frac stacks are onsite not on wells. No frac equipment onsite other than twelve frac tanks. Production equipment includes four sand seperators, four GPUs, and its gauges show no pressure. Well has not been stimulated. |
2012823283 | 2018-08-10 | Completion Testing | No Violations | On the day of my inspection I found this pad has 2 wells that have been fracked. Wells have not had frac plugs drilled out yet. Pipeline contractor appears to be restoring pad berm from pipeline connection. Several guys on location building flowline. Surface and intermediate annular pressures are zero. |
220866799 | 2018-7-26 0:00: | CT | No Violations | 1.00 |
757118125 | 2018-3-30 0:00: | CS | No Violations | 1.00 |
For data sources see[10]