If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21546 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.25,"lon":-81.13,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Nottingham Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001548 | |
Farm/Lease Name: RH SPARGER W NTG HR | |
License Status: Producing | |
License Date: 2018-03-22 | |
Spud Date: 2018-03-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-08-09 | |
Well Total Depth: 22587.00 ft | |
Configuration: Horizontal | |
Latitude: 40.250000 | |
Longitude: -81.130000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-22 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/22/2018, Expired Date:3/21/2020 12:00:00 PM, Drilling unit acres:550.22, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-08-09 | |
Correction to Well | 2018-12-21 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Record Last Modified | 2019-06-11 | |
Construction Permit Expires | 2020-03-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
22285 | 22394 | 0 | |
8246 | 8377 | 0 | |
8246 | 8377 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/02/2018 | 12/13/2018 | 7932 | 22,017,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-Bac 1005 | UPP | Biocide | Water | 7732-18-5 | 44.3 | 0.00393124 | 8210.3 |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.00051115 | 1067.52 | ||||
Polyethylene glycol | 7732-18-5 | 50 | 0.00443707 | 9266.7 | ||||
FR-11 | UPP | Friction reducer | Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00177214 | 3701.08 | |
Sodium Chloride | 7647-14-5 | 15 | 0.00886072 | 18505.4 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000590715 | 1233.69 | ||||
CHEMPLEX-Polymer_00019 | Trade Secret | 25 | 0.0147679 | 30842.3 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.00118143 | 2467.39 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0147679 | 30842.3 | ||||
Water | 7732-18-5 | 55 | 0.0324893 | 67853.1 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00177214 | 3701.08 | ||||
I-7L | UPP | Iron Control | Ethylene glycol | 107-21-1 | 20 | 0.000883922 | 1846.05 | |
Ammonium glycolate | 35249-89-9 | 20 | 0.000883922 | 1846.05 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000220981 | 461.512 | ||||
Scale Hib PE-18 | UPP | Scale Inhibitor | Ethylene glycol | 107-21-1 | 40 | 0.011038 | 23052.6 | |
Proprietary Scale Inhibitor | Proprietary | 30 | 0.00827852 | 17289.5 | ||||
HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0628627 | 131287 | |
Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 11.066 | 23,111,000.0 | |
Unihib G | UPP | Acid inhibitor | Formaldehyde | 50-00-0 | 1 | 0.00000665 | 13.892 | |
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000332586 | 694.596 | ||||
Methanol | 67-56-1 | 5 | 0.00003326 | 69.46 | ||||
Butyl diglycol | 112-34-5 | 75 | 0.000498878 | 1041.89 | ||||
Thiourea | 62-56-6 | 1 | 0.00000665 | 13.892 | ||||
HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00144288 | 3013.43 | |
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.9745 | 183,732,000.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0147679 | 30842.3 | |
Ethylene glycol | 107-21-1 | 40 | 0.011038 | 23052.6 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000590715 | 1233.69 | ||||
Methanol | 67-56-1 | 5 | 0.00003326 | 69.46 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00177214 | 3701.08 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00177214 | 3701.08 | ||||
Polyethylene glycol | 7732-18-5 | 50 | 0.00443707 | 9266.7 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000220981 | 461.512 | ||||
Water | 7732-18-5 | 44.3 | 0.00393124 | 8210.3 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.00886072 | 18505.4 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.00118143 | 2467.39 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000665 | 13.892 | ||||
Thiourea | 62-56-6 | 1 | 0.00000665 | 13.892 | ||||
Ethylene glycol | 107-21-1 | 20 | 0.000883922 | 1846.05 | ||||
Water | 7732-18-5 | 55 | 0.0324893 | 67853.1 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000332586 | 694.596 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 113223 | 24165 | 34 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 5160 | 34 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1133306011 | 2020-1-28 0:00: | PL | No Violations | 1.00 |
-1715420783 | 2018-3-29 0:00: | CS | No Violations | 1.00 |
-2041410180 | 2018-11-16 0:00 | CT | No Violations | 1.00 |
-2102468955 | 2018-12-4 0:00: | CT | No Violations | 1.00 |
-768076619 | 2018-7-26 0:00: | DD | No Violations | 1.00 |
-921093200 | 2018-11-27 0:00 | CT | No Violations | 1.00 |
-993702867 | 2018-7-31 0:00: | DD | No Violations | 1.00 |
0317549905 | 2018-08-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Xtreme 803 running a clean up cycle on the wellbore. They reached total depth of 22587 with an 8.5 inch diameter bit. ID to company man Matt Miller. 5.5 inch diameter production casing is onsite. Schluberger is also onsite loading cement silos. No flare during my inspection. Mud weight was 10.6 ppg. |
0768076619 | 2018-07-26 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Xtreme 803 was drilling a 12.25 inch diameter hole at 5430 feet. They are drilling on air. Company man Van Dietrich said they have 120 units of gas and that he cant tell if the hole is making any water. They had a 5 degree tangent down to 3450 at which point the started coming back to 0. Planned total depth of this section is 7200 feet. Walk around location revealed an area that appears that the liner may have a puncture as the gravel appears moist. Van is going to have the mats picked up and hole located and repaired. |
0921093200 | 2018-11-27 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew on location. Identified myself to company man Malcolm Trahan and Bill Pugh. They just finished stimulating stage 87/87. Plug was set at 9434, with bottom perforation at 9423 and top perforation at 9303. Universal pumped 5047 barrels of clean water and 3010 gallons of 7.5% HCl. 250,448 lbs of sand was pumped, 41354 lbs of 100 mesh and 209094 of 40/70 mesh. Break down pressure was 7850, average pressure was 8555, max pressure was 9768, average rate was 76 barrels per minute (BPM), max rate was 83.9 BPM, initial shut in pressure (ISIP) was 5016, and 5 minute ISIP was 4576. Surface and Intermediate annular pressure was 0. |
0993702867 | 2018-07-31 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Xtreme 803 was on location and just performed a formation integrity test. They are preparing to start drilling their curve. Hole is currently at 7276 and kick off point is at 7335. 9.625 inch diameter shoe at 7192. Pad received rain this afternoon and several areas of the containment are nearly full of water. Compnay mna Matt Miller was notified. |
1032920809 | 2018-04-11 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1280 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1273 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot. Casing was centralized with 10 centralizers. Shoe track is 43 feet long. C&J/O-tex was onsite with 1340 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 187 barrels of fresh water. 35 barrels of gel pumped ahead of cement. 47 barrels of cement (15.5 ppg) returned to surface, and floats held with 0.5 barrels back. Company man Randy Shepard and cement supervisor Grant Hughes onsite. |
1545378531 | 2018-12-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I was accompanied by Geologist Tammy Richards. Universal frac crew is on location. Operations are down for maintenance and the company men could not be located during my inspection. Surface annular pressure is 0 psi and intermediate is 500 psi. |
1715420783 | 2018-03-29 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Express had augered a 36 inch diameter hole to 100 feet and set 100 feet of 30 inch diameter conductor casing, 118 pounds per foot. CJ/otex was onsite with 330 sacks of Class A cement. Cement weighed 15.6 with pressurized mudscale and a yield of 1.2. 50% excess ran in open hole. Cement displaced with 71 barrels of fresh water to 85 feet. 20 barrels of cement returned to surface. Cement supervisor was Kris Casas (Chili) and Ascent company men Tony Shepard and Sean Fox were onsite. |
1761297486 | 2019-01-14 | Completion Testing | No Violations | On the day of my inspection I witnessed Fortis Rig 1069 on location. They have just completed drilling out plugs on this well and are tripping out of wellbore. They will be running production tubing tomorrow. Surface annular pressure is 0 and intermediate is 1100. Well pressure is 1000. I asked Company man Dave Rapatoni about potential communication between 5.5 and 9.625 annular and he showed me their pressure readings showing that wellbore was up to 4000 psi and intermediate annular was hanging around 1200 psi indicating that the pressures did not mirror each other. |
2020377373 | 2018-07-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I was accompanied by DOGRM Emergency Operations Coordinator Jason Blocker. Complete Energy Services llc was moving Xtreme 803 onto location. Spoke with company man Mike Atkinson. They wont be raising the derrick until later tonight. |
2041410180 | 2018-11-16 | Completion Testing | No Violations | On the day of my inspection I found a Universal frac crew on location. They are zipper fracking the 1 and 5 wells. They are preapring to frac on stage 42/94 on this well. Surface annular pressure is 0 and intermediate annular pressure is 250. Stage 42 plug set at 16229, with bottom perforation at 16219 and top perforation at 16098. |
2102468955 | 2018-12-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men Malcolm Trahan and Bill Pugh. Stimulation was completed on this well on 11-29-18. There were 86 stages completed. Kill plug set at 7033 Surface annular pressure is 0 and intermediate pressure is 500. |
317549905 | 2018-8-6 0:00:0 | DD | No Violations | 1.00 |
For data sources see[9]