If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21548 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.25,"lon":-81.13,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Nottingham Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001548 | |
Farm/Lease Name: RH SPARGER E NTG HR | |
License Status: Producing | |
License Date: 2018-03-22 | |
Spud Date: 2018-03-29 | |
Spud Drilling Contractor: | |
Final Drill Date: 2018-08-31 | |
Well Total Depth: 21830.00 ft | |
Configuration: Horizontal | |
Latitude: 40.250000 | |
Longitude: -81.130000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-22 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/22/2018, Expired Date:3/21/2020 12:00:00 PM, Drilling unit acres:516.853, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-08-31 | |
Correction to Well | 2018-12-21 | UPDATE TAKE/TARGET PER AS-DRILLED PLAT |
Record Last Modified | 2019-06-11 | |
Construction Permit Expires | 2020-03-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
21198 | 21309 | 0 | |
8518 | 8649 | 0 | |
8518 | 8649 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/03/2018 | 11/28/2018 | 7955 | 19,573,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | I-7L | UPP | Iron Control | Ammonium glycolate | 35249-89-9 | 20 | 0.000877845 | 1632.88 |
Ethylene glycol | 107-21-1 | 20 | 0.000877845 | 1632.88 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000219461 | 408.221 | ||||
K-Bac 1005 | UPP | Biocide | Water | 7732-18-5 | 44.3 | 0.00407504 | 7579.99 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.000529847 | 985.57 | ||||
Polyethylene glycol | 7732-18-5 | 50 | 0.00459937 | 8555.29 | ||||
Scale Hib PE-18 | UPP | Scale Inhibitor | Ethylene glycol | 107-21-1 | 40 | 0.0112353 | 20898.8 | |
Proprietary Scale Inhibitor | Proprietary | 30 | 0.00842648 | 15674.1 | ||||
HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0623016 | 115887 | |
Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 11.232 | 20,892,700.0 | |
Unihib G | UPP | Acid inhibitor | Thiourea | 62-56-6 | 1 | 0.00000659 | 12.262 | |
Formaldehyde | 50-00-0 | 1 | 0.00000659 | 12.262 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000329609 | 613.107 | ||||
Methanol | 67-56-1 | 5 | 0.00003296 | 61.311 | ||||
Butyl diglycol | 112-34-5 | 75 | 0.000494414 | 919.661 | ||||
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.8147 | 163,344,000.0 | |
FR-11 | UPP | Friction reducer | Water | 7732-18-5 | 55 | 0.0320525 | 59621 | |
CHEMPLEX-Polymer_00019 | Trade Secret | 25 | 0.0145693 | 27100.5 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000582773 | 1084.02 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.0087416 | 16260.3 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.00116555 | 2168.04 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00174832 | 3252.05 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00174832 | 3252.05 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0145693 | 27100.5 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0145693 | 27100.5 | |
Polyethylene glycol | 7732-18-5 | 50 | 0.00459937 | 8555.29 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00174832 | 3252.05 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.0112353 | 20898.8 | ||||
Methanol | 67-56-1 | 5 | 0.00003296 | 61.311 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000329609 | 613.107 | ||||
Thiourea | 62-56-6 | 1 | 0.00000659 | 12.262 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000659 | 12.262 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.0087416 | 16260.3 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000582773 | 1084.02 | ||||
Water | 7732-18-5 | 55 | 0.0320525 | 59621 | ||||
Ethylene glycol | 107-21-1 | 20 | 0.000877845 | 1632.88 | ||||
Water | 7732-18-5 | 44.3 | 0.00407504 | 7579.99 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.00116555 | 2168.04 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000219461 | 408.221 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00174832 | 3252.05 | ||||
HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00160722 | 2989.59 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 115410 | 23440 | 34 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 4223 | 34 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1022405204 | 2018-4-15 0:00: | CS | No Violations | 4.00 |
-1294255316 | 2019-1-14 0:00: | CT | No Violations | 1.00 |
-1501747255 | 2018-12-20 0:00 | CT | No Violations | 1.00 |
-2079699842 | 2018-3-29 0:00: | CS | No Violations | 1.00 |
-2129682959 | 2018-11-27 0:00 | CT | No Violations | 1.00 |
-556497996 | 2018-12-4 0:00: | CT | No Violations | 1.00 |
-842175020 | 2018-8-13 0:00: | DD | No Violations | 1.00 |
0556497996 | 2018-12-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men Malcolm Trahan and Bill Pugh. Stimulation was completed on this well on 11-29-18. There were 86 stages completed. Kill plug set at 7340 Surface annular pressure is 400 and intermediate pressure is 350. |
0842175020 | 2018-08-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Xtreme 803 drilling a 12.25 inch diameter hole on air. They are at 5960 feet on an 11 degree tangent. Hole is not making much water, if any. A small flare was burning after connection was made. ID to company man Matt Miller. Containment is full of water and near overtopping in the southwest corner. Rain is expected in the near future. Company man was asked to get it sucked down. He said a truck had just pulled onto location and he would direct them to do so. |
1022405204 | 2018-04-15 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1285 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1274 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 3 foot stick up. Casing was centralized with 11 centralizers. Shoe track is 43 feet long. C&J/O-tex was onsite with 1340 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 187 barrels of fresh water. 35 barrels of gel pumped ahead of cement. 65 barrels of cement (15.6 ppg) returned to surface, and floats held with 1.0 barrels back. Company man Randy Shepard and cement supervisor Drew Forsyth onsite. |
1074307082 | 2018-11-16 | Completion Testing | No Violations | On the day of my inspection I found a Universal frac crew on location. They are zipper fracking the 1 and 5 wells. They just finished to frac on stage 39/26 on this well. Surface annular pressure is 400 and intermediate annular pressure is 0. Stage 40 plug set at 15444, with bottom perforation at 15434 and top perforation at 15313. |
1211211807 | 2020-1-28 0:00: | PL | No Violations | 1.00 |
1294255316 | 2019-01-14 | Completion Testing | No Violations | On the day of my inspection I witnessed Fortis Rig 1069 on location. They have not started drill out on this well yet. Surface annular pressure is 400 and intermediate is 200. |
1501747255 | 2018-12-20 | Completion Testing | No Violations | On the day of my inspection I was accompanied by Geologist Tammy Richards. Universal frac crew is on location. Operations are down for maintenance and the company men could not be located during my inspection. Surface annular pressure is40 0 and intermediate is 300. |
1693481834 | 2018-08-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Xtreme 803 drilling an 8.5 inch diameter hole at 11206 feet. ID to company man Van Dietrich. Kick off point was 7468 and landing point was 8617. there is no flare currently and they are drilling with 11 ppg oil base mud. They cemented the 61#/ft 9.625 inch diameter casing over the weekend. Casing shoe at 7289. |
2079699842 | 2018-03-29 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Express had augered a 36 inch diameter hole to 100 feet and set 100 feet of 30 inch diameter conductor casing, 118 pounds per foot. CJ/otex was onsite with 330 sacks of Class A cement. Cement weighed 15.6 with pressurized mudscale and a yield of 1.2. 50% excess ran in open hole. Cement displaced with 71 barrels of fresh water to 85 feet. 20 barrels of cement returned to surface. Cement supervisor was Kris Casas (Chili) and Ascent company men Tony Shepard and Sean Fox were onsite. |
2129682959 | 2018-11-27 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew on location. Identified myself to company man Malcolm Trahan and Bill Pugh. They will be stimulating stage 84/86. Plug was set at 8800, with bottom perforation at 8790 and top perforation at 8669. Surface annular pressure was 0 and Intermediate annular pressure was 400. |
For data sources see[9]