If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-073-22003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.48,"lon":-82.21,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Hocking | |
| Municipality: Ward Township | |
| Operator Name: BELL DRILLING & PROD CO | |
| Well Pad ID: | |
| Farm/Lease Name: NELSONVILLE COAL & LAND CO | |
| License Status: Final Restoration | |
| License Date: 1991-06-20 | |
| Spud Date: 1977-10-03 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1977-12-07 | |
| Well Total Depth: 3453.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.480000 | |
| Longitude: -82.210000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1977-09-02 | 420 BELL DRILLING & PROD CO GeoDate 9/2/77 |
| Original Spud | 1977-10-03 | |
| Completed | 1977-12-07 | |
| Reached Total Depth | 1977-12-07 | |
| Completion Report Received | 1978-04-06 | |
| CO | 1991-06-20 | 420 BELL DRILLING & PROD CO GeoDate 6/20/91 |
| OIL WELL | 1991-06-20 | Issued Date 6/20/91 Expired Date 6/19/92 Proposed Purpose OG Was Plug Supervised N Who Superivsed BY CO.Plug and Abandon Date 8/30/91 |
| Plugged/Abandoned | 1991-08-30 | |
| Construction Permit Expires | 1992-06-19 | |
| Record Last Modified | 2013-03-14 |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1500 Bbl | 10000 |
For data sources see[3]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0015655605 | Final Restoration | No Violations | PASSED Y WITNESSED 9/24/92 INSPECTOR DAN GOINS DATE 09/2419/92 DATA FROM OLD VAX INFO | |
| 0015665606 | Final Restoration | No Violations | PASSED Y WITNESSED 5/28/92 INSPECTOR DAN GOINS DATE 05/2819/92 DATA FROM OLD VAX INFO | |
| 15655605 | FR | No Violations | ||
| 15665606 | FR | No Violations |
For data sources see[4]