Well ID: 34-073-22211 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.48,"lon":-82.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Hocking | |
Municipality: Green Township | |
Operator Name: HOCKING HILLS ENERGY AND WELL | |
Well Pad ID: | |
Farm/Lease Name: LOGAN SAND & GRAVEL CO | |
License Status: Active Injection | |
License Date: 2006-05-08 | |
Spud Date: 1979-12-06 | |
Spud Drilling Contractor: | |
Final Drill Date: 1979-12-11 | |
Well Total Depth: 3114.00 ft | |
Configuration: Vertical | |
Latitude: 39.480000 | |
Longitude: -82.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1979-10-22 | 2810 CHIEFTAIN ENERGY CORP GeoDate 10/22/79 |
Oil and Gas | 1979-10-22 | Issued Date 10/22/79 Expired Date Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1979-12-06 | |
Completed | 1979-12-11 | |
Reached Total Depth | 1979-12-11 | |
Completion Report Received | 1980-03-11 | |
CO | 1994-07-07 | 4074 OIL ENTERPRISES GeoDate 10/22/79 |
CO | 1997-02-18 | 5755 CHIEFTAIN ENERGY CORP. GeoDate 10/22/79 |
APP | 2006-05-08 | Proposed Formations:CLINTON, Issued Date:5/8/2006, Expired Date:5/8/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:EOR, Proposed Well Class:ERP |
Annulus Pressure Monitoring Approved | 2006-10-26 | |
Last Compliance Report | 2006-10-30 | |
Construction Permit Expires | 2007-05-08 | |
Record Last Modified | 2014-09-25 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-05-08 | 2933 | 2950 | 11 |
2933 | 2950 | 11 | |
2933 | 2950 | 11 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 61250 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MUTUAL OIL & GAS CO | 5599.00 | 235.00 | 0 |
1985 | MUTUAL OIL & GAS CO | 4191.00 | 125.00 | 0 |
1986 | MUTUAL OIL & GAS CO | 1800.00 | 83.00 | 365 |
1987 | MUTUAL OIL & GAS CO | 9.00 | 0.00 | 0 |
1988 | HOCKING HILLS ENERGY AND WELL | 3253.00 | 44.00 | 260 |
1989 | HOCKING HILLS ENERGY AND WELL | 3280.00 | 42.00 | 300 |
1990 | HOCKING HILLS ENERGY AND WELL | 2686.00 | 23.00 | 300 |
1991 | HOCKING HILLS ENERGY AND WELL | 953.00 | 54.00 | 300 |
1992 | HOCKING HILLS ENERGY AND WELL | 1176.00 | 102.00 | 251 |
1995 | OIL ENTERPRISES | 1375.00 | 140.00 | 365 |
1996 | OIL ENTERPRISES | 1206.00 | 51.00 | 365 |
1997 | HOCKING HILLS ENERGY AND WELL | 1361.00 | 0.00 | 365 |
1998 | HOCKING HILLS ENERGY AND WELL | 1361.00 | 0.00 | 365 |
1999 | HOCKING HILLS ENERGY AND WELL | 1321.00 | 0.00 | 140 |
2000 | HOCKING HILLS ENERGY AND WELL | 1202.00 | 0.00 | 140 |
2001 | HOCKING HILLS ENERGY AND WELL | 1415.00 | 50.00 | 365 |
2002 | HOCKING HILLS ENERGY AND WELL | 1375.00 | 56.00 | 365 |
2003 | HOCKING HILLS ENERGY AND WELL | 1100.00 | 43.00 | 365 |
2004 | HOCKING HILLS ENERGY AND WELL | 981.00 | 36.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MUTUAL OIL & GAS CO | Brine | 0 | 0 |
1985 | MUTUAL OIL & GAS CO | Brine | 0 | 0 |
1986 | MUTUAL OIL & GAS CO | Brine | 0 | 365 |
1987 | MUTUAL OIL & GAS CO | Brine | 0 | 0 |
1988 | HOCKING HILLS ENERGY AND WELL | Brine | 276 | 260 |
1989 | HOCKING HILLS ENERGY AND WELL | Brine | 324 | 300 |
1990 | HOCKING HILLS ENERGY AND WELL | Brine | 312 | 300 |
1991 | HOCKING HILLS ENERGY AND WELL | Brine | 265 | 300 |
1992 | HOCKING HILLS ENERGY AND WELL | Brine | 311 | 251 |
1995 | OIL ENTERPRISES | Brine | 270 | 365 |
1996 | OIL ENTERPRISES | Brine | 300 | 365 |
1997 | HOCKING HILLS ENERGY AND WELL | Brine | 190 | 365 |
1998 | HOCKING HILLS ENERGY AND WELL | Brine | 120 | 365 |
1999 | HOCKING HILLS ENERGY AND WELL | Brine | 160 | 140 |
2000 | HOCKING HILLS ENERGY AND WELL | Brine | 200 | 140 |
2001 | HOCKING HILLS ENERGY AND WELL | Brine | 540 | 365 |
2002 | HOCKING HILLS ENERGY AND WELL | Brine | 320 | 365 |
2003 | HOCKING HILLS ENERGY AND WELL | Brine | 160 | 365 |
2004 | HOCKING HILLS ENERGY AND WELL | Brine | 205 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1006309625 | 2009-9-4 0:00:0 | ER | No Violations | |
-1019877444 | 2012-9-14 0:00: | SC | No Violations | 2.50 |
-102072007 | 2015-9-23 0:00: | ER | No Violations | 3.00 |
-1116586588 | 2009-6-2 0:00:0 | ER | No Violations | |
-1123703794 | 2019-1-28 0:00: | SW | No Violations | 0.30 |
-1167754030 | 2012-2-23 0:00: | SC | No Violations | |
-1230306936 | 2010-6-15 0:00: | ER | No Violations | |
-1250352730 | 2012-7-6 0:00:0 | SC | No Violations | |
-128373724 | 2017-5-25 0:00: | SW | No Violations | |
-1353175915 | 2012-2-8 0:00:0 | ER | No Violations | 1.50 |
-1381541048 | 2009-6-2 0:00:0 | ER | No Violations | |
-1432912921 | 2014-3-20 0:00: | SW | No Violations | 1.00 |
-1483595985 | 2015-6-22 0:00: | ER | No Violations | 2.50 |
-1485677477 | 2004-9-28 0:00: | AD | No Violations | |
-1507049274 | 2020-7-9 0:00:0 | ER | No Violations | 1.00 |
-1592764413 | 2012-2-23 0:00: | ER | No Violations | 3.50 |
-1609198785 | 2009-7-20 0:00: | ER | No Violations | |
-1625747241 | 2009-6-2 0:00:0 | ER | No Violations | |
-1676404973 | 2013-7-3 0:00:0 | SW | No Violations | 2.00 |
-1724006903 | 2006-3-29 0:00: | AD | No Violations | |
-1766418051 | 2009-1-21 0:00: | SC | No Violations | |
-1767643327 | 2012-8-20 0:00: | ER | No Violations | 2.00 |
-1812844999 | 2012-6-20 0:00: | SC | No Violations | 3.00 |
-1834966995 | 2011-12-15 0:00 | ER | No Violations | 1.50 |
-1874240395 | 2011-3-31 0:00: | ER | No Violations | |
-1923010994 | 2013-4-10 0:00: | ER | No Violations | 3.50 |
-1944722098 | 2012-8-7 0:00:0 | SC | No Violations | 1.00 |
-1984598286 | 2012-7-6 0:00:0 | SC | No Violations | 4.00 |
-198736282 | 2007-9-5 0:00:0 | SC | No Violations | |
-2026205392 | 2007-6-26 0:00: | SC | No Violations | |
-2097609832 | 2016-3-17 0:00: | ER | No Violations | |
-210087111 | 2015-9-8 0:00:0 | ER | No Violations | 8.00 |
-2146088841 | 2015-9-14 0:00: | ER | No Violations | 1.50 |
-245808127 | 2010-5-24 0:00: | ER | No Violations | |
-251294628 | 2015-9-25 0:00: | SW | No Violations | 5.00 |
-334399596 | 2017-10-4 0:00: | SW | No Violations | 1.50 |
-356568051 | 2012-8-23 0:00: | ER | No Violations | 2.00 |
-371501340 | 2013-1-10 0:00: | ER | No Violations | 4.50 |
-397182149 | 2010-1-4 0:00:0 | ER | No Violations | |
-545950718 | 2008-1-4 0:00:0 | SC | No Violations | |
-550750583 | 2020-4-2 0:00:0 | ER | No Violations | 3.00 |
-563611421 | 2009-6-2 0:00:0 | ER | No Violations | |
-581161508 | 2013-1-10 0:00: | ER | No Violations | 4.00 |
-595775573 | 2014-10-1 0:00: | ER | No Violations | 5.00 |
-614847614 | 2015-3-24 0:00: | SW | No Violations | 1.00 |
-646446501 | 2004-5-13 0:00: | AD | No Violations | |
-650820019 | 2010-5-10 0:00: | ER | No Violations | |
-653344562 | 2012-7-16 0:00: | SC | No Violations | 2.00 |
-747208354 | 2018-8-14 0:00: | ER | No Violations | 0.50 |
-833622331 | 2016-8-31 0:00: | ER | No Violations | 3.00 |
-852311835 | 2018-5-15 0:00: | ER | No Violations | 0.60 |
-897233267 | 2008-7-10 0:00: | ER | No Violations | |
-897437627 | 2011-7-6 0:00:0 | ER | No Violations | |
-906073541 | 2009-6-2 0:00:0 | ER | No Violations | |
-91643873 | 2008-11-26 0:00 | SC | No Violations | |
-916443054 | 2008-7-17 0:00: | ER | No Violations | |
-923987207 | 2012-2-9 0:00:0 | ER | No Violations | 4.50 |
0031053836 | 2007-07-30 | Surface Facility Construction | No Violations | An inspection was conducted on 7/30/2007 with Mr. Doug Kitchen and Mr. Ron McBride. During the inspection, it was noted that the dike height along the far end of the constructed dike has not been addressed. This issue was brought to Mr. Kitchens attention. It was also noted that the 30mm liner has not been installed. Mr. Kitchen also states that they would like to build the unloading pad in a different location and utilize different size tanks. He was instructed to reflect these changes on his design and submit this information to Mr. Tom Tomastik. Mr. Kitchen was again informed that this site would require fence placed around the facility, and a plastic tank (vault) will not be allowed. He was instructed to use a concrete vault that is coated. More work will be needed to complete the construction of this facility. |
0040479472 | 2010-03-12 | Enhanced Recovery Project | No Violations | A follow-up inspection to NOV and Compliance Agreement Schedule revealed that the previously noted violations have now been resolved. During the inspection, it was noted that oil exists inside the earthen dike at the storage tank location. Old and fresh oil on surface of water throughout dike. Old pads were observed on one end of the dike and will need replaced. The source of release is from the overflow of storage tank. Oil stains were observed from top of tank to ground surface, in dike, on two separate ends. A plug will be recommended for open PVC drain at the unloading pad to prevent overflow of concrete vault. Note: PVC routed from drain to concrete vault. Remedial Restoration will be recommended for the Spring, due to erosion at well location and along lease road. At 10:48 am, the well owner, Doug Kitchen, was notified on location, by telephone of inspect results and deficiency with non-related well. Mr. Kitchen states Ron McBride will cleanup P&C this weekend; agreed that Remedial Restoration work needed and will apply seed. He was instructed to perform work when the weather drys, but before June. Mr. Kitchen agreed that a plug for PVC drain is a good idea. |
0057766270 | 2011-02-01 | Enhanced Recovery Project | No Violations | An inspection conducted with Mr. Andy Thomas revealed no violations at this time. Note: snow cover at time of inspection. |
0062416454 | 2008-11-25 | Surface Facility Construction | No Violations | An inspection revealed that Chieftain Energy is preparing to install a concrete vault for the unloading pad location. Chieftain Energy will be coating both the inside and outside of this vault with tar. |
0071971176 | 2016-03-21 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 Follow up inspection. Well is disconnected from injection equipment. Containment dike has 8 of water in it. Standing water between the well and the containment dike was tested using High Range Quantabs. Results ranged from 3700 ppm cl to 486 ppm Cl. |
0091643873 | 2008-11-26 | Surface Facility Construction | No Violations | An inspection was conducted to ensure that the concrete vault was properly coated with tar. Witnessed Chieftain Energy employees coat the inside walls of the vault. The bottom (inside) of this vault contained ice therefore, not allowing the application of material. The company therefore, removed the ice and will allow the bottom to dry. |
0102072007 | 2015-09-23 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 follow up inspection. Both containment dikes have fluid in them. No equipment is on site to remove contaminated material. An additional scald area was observed along the access road at GPS N39.48989 / W082.39777. The scald area is roughly a triangle shape that flows into the wood line. Dimensions are 34 by 26 by 44. This area is stained dark and is completely devoid of vegetation. A field test of the soil revealed 2930 ppm Cl. |
0128373724 | 2017-05-25 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The well had 0 psi on the injection tubing and 0 psi on the annulus. The well is currently not in use. |
0134367124 | 2018-01-18 | Salt Water Injection Well | No Violations | The salt water injection well had 74 psi on the annulus. The injection tubing is disconnected from the primary injection line. The well is not being used for injecting salt water. The well owner has plans to rebuild the facility before the well is used again. |
0146196985 | 2011-12-15 | Enhanced Recovery Project | No Violations | Accompanied by Andy Thomas MRI. The 1/4 needle valve on the injection tubing needs to be replaced. Dike is full of water. A new mail box has been installed at the unloading pad. It has a brine load slip book inside. A large white tank is on location it is not being used at this time. Andy has contacted the company regarding the water in the dike and the needle valve. |
0156012850 | 2010-06-10 | Enhanced Recovery Project | No Violations | Witnessed Injection Line Test on 2 steel line. The line did not pass the reqiured test, due to leakage from two points above ground near test gauge location on end. Test Data: 780 psi at 1:29 p.m. to 705 psi at 1:32 p.m. (leak @ split connection near gauge). Attempt to tighten and re-test. Re-pressured to 730 psi @ 1:36 p.m. and pressure still continued to drop. Second leak near end of line after check valve. Will re-test next week. The check will be removed for next test. |
0198736282 | 2007-09-05 | Surface Facility Construction | No Violations | Checked on the surface facility construction. No activity was observed. |
0210087111 | 2015-09-08 | Enhanced Recovery Project | No Violations | Compliance notice follow-up. Accompanied by Jake Glasscock DOGRM Geologist and Josh Garland MRI 2. Both containment dikes have water and oil in them. Capacity in containment dikes is reduced to at least half of the required amount. The 300 barrel tank and the 210 barrel tank show signs of over flowing on the sides. The roll off box has been removed from the location. Oil residue and a narrow scald area was observed where the roll off box was located. The contaminated area outside of the containment dikes was delineated and 4 soil samples were collected (3 from the contaminated area and 1 control sample). Soil samples were taken to the ODNR Lab. |
0224425600 | 2009-12-03 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. During the inspection, it was noted there is no pressure on annulus, and oil and brine inside dike. Absorbent pads were also observed inside the dike. The concrete vault was full of fluid and appears to have overflowed, as Cl- was observed in standing water around the area. The unloading pad contains open hole for drainage to vault (PVC pipe). The installation of a cap to prevent overflow from rainfall events will be recommended to company. |
0245808127 | 2010-05-24 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. |
0251294628 | 2015-09-25 | Salt Water Injection Well | No Violations | Hocking Hills Energy has finished the demolition of the pump house. The concrete has been loaded in a container and taken to Kilbargers landfill. The contaminated soil has been separated and loaded into containers and taken to the landfill. I monitored the removal of soil that contained chlorides. This soil was also loaded in containers and taken to landfill. |
0261149307 | 2012-07-13 | Surface Facility Construction | No Violations | There was no activity at the site. Doug Kitchen was on site. I spoke with him about what his plans were as far as finishing the tank battery liner. |
0278715626 | 2010-09-07 | Brine Hauler | Violations Noted | On 9/4/2010, a complaint was received by the DMRM alleging that Mr. Doug Kitchen, President of Chieftain Energy Corp, had dumped pit water onto this lease road on 9/3/2010. The complainant observed normal lease road condition the morning of the 3rd, but later that evening would see a noticeable change. The complainant states that Mr. Kitchen had been hauling fluid from drilling location of Permit No. 3595. An inspection revealed that the entire lease road measuring approx 1000 x 10 contained brine and pockets of oil. The road surface was silted/smooth resembling a ground surface after applicaion of fluid. A change in the road condition began at entrance, into ERP, just past the gate. A puddle measuring approx 5 in width reached maximum units on Low Range Quantabs. At the ERP location, fresh oil was observed throughout the inside of earthen dike. The source is from 200 bbl horizontal tank, which has overflowed. The tank was wet at top on both ends. At Permit No. 3595 location, spoke with Mr. Jim Kilbarger, Logan Gas (partnership), and Dave Barry with Petroleum Development Corp., regarding fluid hauled from Permit No. 3595. Both individuals confirmed Chieftain Energy hauled fluid from this location. Mr. Kilbarger states approx 6 loads were hauled from the blow pit. He further stated that Mr. Kitchens water truck broke down on Sunday, 9/5/10. Left message for Mr. Kitchen on cell phone at 11:45 stating to return call as soon as possible. Mr. Kitchen returned call at 3:29 p.m. and stated so whats this I hear about a problem with me putting water on my lease road for dust control? Mr. Kitchen was then advised that this activity is not allowed per SB 165. Furthermore, he does not even have a Brine Resolution Plan with the UIC section. Mr. Kitchen was given the telephone number for Mr. Robert Stonerock, South Region Oil & Gas Supervisor. Mr. Kitchen stated that tomorrow he would bring a dozer out and backblade the road. Mr. Kitchen was instructed not to |
0298240305 | 2010-09-22 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed that absorbent pads have now been applied to locations inside the dike. Oily soil and sheen on surface of fluid still remain from tank overflow. |
0331422685 | 2016-02-03 | Enhanced Recovery Project | No Violations | Chief Order No. 2015-445 Follow up inspection. Injection tubing master valve is closed. Injection tubing is not connected to injection line or equipment. The containment dike has 16 of water in it. The Annulus has 5 psi. |
0334399596 | 2017-10-04 | Salt Water Injection Well | No Violations | The brine contamination has been cleaned up. Thick vegetative cover has been established. The well is currently not in use. There is a small amount of fluid in the containment dike. The well is on vacuum and has 0 psi on the annulus. I have contacted Hocking Hills Energy to remove the fluid from the dike. |
0356568051 | 2012-08-23 | Enhanced Recovery Project | No Violations | Witnessed mechanical integrity test on the annulus. Test was performed twice. 4.5 well head was leaking pressure off. Well did not pass. Rubber seals in the well head will be replaced. |
0359615844 | 2015-12-31 | Enhanced Recovery Project | No Violations | Chiefs Order # 2015-445 Follow up inspection. The containment dike has over 18 of water in it. The injection tubing is not connected to injection equipment. The master valve is closed. Checked the annulus pressure which was at zero pressure with fluid observed at the surface when the gauge was removed. There has been no effort to complete the remediation of the contaminated soil. |
0371501340 | 2013-01-10 | Enhanced Recovery Project | No Violations | Checked injection and annulus pressures. There was fluid in both containment dikes. Where the liner had been added to on one of the containment dikes the adhesive tape was not holding. The vault the held fluid from the unloading pad had over flown. One of the tanks had also over flown and oily material was left in the dike. Mr. Bill Deible was called and he came out to the site. These issues and their remedies were discussed. We also discussed their sump system and the way it was plumbed. Inspector Jon Scott was also on site. He will be issuing the Compliance Notice. Flowmeter displays information in gallons. |
0375637493 | 2008-08-08 | Enhanced Recovery Project | No Violations | An inspection revealed that the surface facility has not been constructed. A new pump was observed to have been installed. No activity observed at time of the inspection. |
0378216293 | 2008-12-08 | Surface Facility Construction | No Violations | An inspection revealed no activity. During the inspection, it was noted that the bottom (inside) of concrete vault contains tar. |
0388118204 | 2012-02-22 | Enhanced Recovery Project | No Violations | Measured the new dike that was being constructed with Inspectors Jon Scott and Kip Thompson. Also witnessed sand being placed in the bottom of it. In the existing dike, there was an excess of fluid which needed pumped out. The sump pit was also full. A phone call was made to Mr. Doug Kitchen of Chieftain Energy and corrective action was taken immediately. |
0390510777 | 2016-06-15 | Enhanced Recovery Project | No Violations | Chiefs Order # 2015-445 follow up inspection. The visible holes in the pit liner have been repaired. The pit level is at approximately 6. The scald area has been graded. No vegetative cover established. The Inspector was not notified of the pit liner repairs or the site work on the scald area. This activity was not witnessed. The injection tubing is not connected to any injection equipment. |
0395669655 | 2006-06-19 | Enhanced Recovery Project | No Violations | No violations. |
0397182149 | 2010-01-04 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. During the inspection, it was noted that no pressure exists on the injection and annular side of the well. The area inside the dike containing a liner found to contain P&C, as previously noted still exist. The concrete vault that had overflowed is still full but is now frozen. Chieftain Energy has been sent a NOV and also verbally instructed on several occassions in regards to positive pressure on annulus. Furthermore, if no pressure is placed on annulus, notify me to witness monthly mini-test. Note: snow cover at time of inspection. |
0475214848 | 2018-08-07 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 follow up inspection. The injection well is not connected to injection equipment or injection line. The containment dike is full of fluid. Identification is posted at the well. Vegetative cover is established on the remediated areas. |
0545950718 | 2008-01-04 | Surface Facility Construction | No Violations | An inspection revealed that the surface facility is not finished. Mr. Doug Kitchen was informed that if changes are made to the original design, he would need to send Tom Tomastik a revised drawing of this facility. No pressure observed on the annulus and injection side of the well. |
0563611421 | 2009-06-02 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -1116586588 An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed on the injection side of the well. The iden |
0581161508 | 2013-01-10 | Enhanced Recovery Project | Violations Noted | Inspected enhanced recovery well injection tubing pressure and annulus pressure. Good identification at well head. Facility has two dikes. Both dikes have fluids in them. The dike with the brine pump has oil in the dike. Remove all fluids from the dike and clean up all contaminated areas with in the dike. Unloading pad vault has over flowed oil and fluids onto the ground (contaminated area 4 feet in diameter). Previous repairs to the dike liner are not effective. The repair material has separated from the dike liner. Dike liner must be water tight. Repair or replace dike liner. Accompanied by Andy Thomas MRI 2. |
0595775573 | 2014-10-01 | Enhanced Recovery Project | Violations Noted | FOLLOW UP TO NOV # 1412190582 Inspected the unloading pad, containment dikes, tanks, injection line, annulus pressure and injection pressure. A scald area was observed outside the containment dikes. Approximately 75 by 3. Soil was field tested for chlorides. High range Quantab was maxed out at 6508 ppm Cl. I called Bill Diebel and he came out to the well site. I told Bill that the contaminated area must be remediated. The unloading pad sump had overflowed as well. I told Bill that the sump needs to be upgraded to prevent surface water from flowing into the top of the sump pit. I called Dave Poling and discussed the sump pit issues and what was needed to remediate the contaminated areas. I told Dave that the sump must be one piece construction with the top extending at least 6 above the ground level. |
0596856320 | 2014-08-04 | Salt Water Injection Well | No Violations | UIC inspection. The well has 142 PSI on the annulus, and the injection side is on vacuum. No violations noted. |
0614847614 | 2015-03-24 | Salt Water Injection Well | No Violations | UIC inspection. The injection side is on vacuum, the annulus pressure was 73 PSI. The dikes have water in them, I have contacted Hocking Hills Energy to have the dikes pumped out. |
0640176974 | 2008-06-16 | Enhanced Recovery Project | Violations Noted | A complaint was received by the DMRM alleging that Chieftain Energy had released excess oil and brine from water truck onto the lease road and around the well site. The complainant also stated that Chieftain Energy has been unloading fluid from their water truck directly into the well. Further stating that this activity has been occurring for quite some time. The surface facility has not been completed. An inspection revealed puddles of brine on the lease road. and bare areas around the well site. Oil was also observed, on the ground, located along the edge of wooded area. Mr. Doug Kitchen was verbally instructed to complete surface facility before injecting any fluid and that unloading from water truck is not allowed. Mr. Kitchen will be required to perform cleanup and remove contaiminated soil. |
0646446501 | 2004-05-13 | Annular Disposal | Violations Noted | An inspection of the well revealed no ID at the well, oily soil around the well and tank battery, bare areas on well site. |
0650820019 | 2010-05-10 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. Arrived at the location and observed Chieftain Energy Contractor, Mr. Ron McBride leaving the location. Mr. McBride states dont bother going back to location because its not cleaned up. Mr. McBride agreed to perform cleanup by 5/14/2010. Mr. McBride was informed that the injection line would need to be tested and remedial restoration are required. Furthermore, a gas line from non-related well routed through this location contains a leak. An inspection of the well site revealed non-compliance. |
0653344562 | 2012-07-16 | Surface Facility Construction | No Violations | Witnessed the patching of the liner. Approved materials were used. Accompanied by Steve Riley. |
0682000589 | 2009-06-02 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -1116586588 An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed on the injection side of the well. The identification at the well missing ERP # and need ID at tank. |
0714685875 | 2013-02-06 | Enhanced Recovery Project | No Violations | Dike contamination has been cleaned up and hauled to landfill. |
0716073848 | 2015-09-08 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott and Jake Glascock on a site facility assessment. A large volume of brine had escaped from the containment facility and contaminated the ground. Soil samples taken, field sample tests ran for Chlorides, pictures taken, site measured. |
0739028801 | 2016-06-02 | Salt Water Injection Well | No Violations | I received a call from Hocking Hills Energy. They stated they would be working on repairing the dike liner that as damaged by a tree. The dike has 9 holes that was caused by the tree falling. The manufacture of the liner sent the repair material. The area around the holes was cleaned of all contaminates before the patch was applied using rubbing alcohol. Hocking Hills Energy began removing soil that is contaminated with brine. This area is located at the east side of the existing dike. Quantabs showed reading of approx. 800 PPM. |
0747208354 | 2018-08-14 | Enhanced Recovery Project | No Violations | Chiefs Order 2015-445 follow up with ODNR DOGRM UIC section Geologist. The containment dike is full of fluid. The dike fluid has a sheen. The injection tubing is not connected to injection equipment. |
0755009655 | 2004-11-26 | Annular Disposal | No Violations | Follow-up on NOV, In-Compliance. |
0833622331 | 2016-08-31 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 follow up inspection. The containment dike is full of fluid. The injection tubing is not connected to an injection line or equipment. Vegetative cover has been established on the reclamation site. The injection tubing master valve is closed. The annulus has zero pressure. |
0852311835 | 2018-05-15 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 Follow up Inspection. The containment dike has 18 inches of fluid in it. The fluid has an oil sheen. The well is not connected to an injection line or injection pump. The injection tubing master valve is closed. Identification is posted at the well. Vegetative cover has been established on the location. |
0897233267 | 2008-07-10 | Enhanced Recovery Project | No Violations | A follow-up inspection now revealed 43 ( outside width) x 90 (length) kill area consisting of dead trees and grass. The width of the kill area decreases from 43 to 20 inside the tree line. |
0897437627 | 2011-07-06 | Enhanced Recovery Project | Violations Noted | Zero pressure on injection tubing. Zero pressure on annulus. Test Annulus to 675 psi for 15 minutes. Schedule test with Jon Scott MRI2 740-624-4963. Brine on wellhead maxed out High End Quantabs. Repair or replace tubing at wellhead. Brine in dike. Remove brine from dike and dispose in an Injection well. Replace 1/4 needle valve on Injection tubing. |
0906073541 | 2009-06-02 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -1116586588 An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed on the injection side of the well. The identification at the well does not contain the ERP #. No identification was observed at the storage tank. The contractor for Chieftain Energy., Mr. Ron McBride, was notified of the deficiencies, in person, on 6/2/2009 at approximately 12:30 pm. |
0916443054 | 2008-07-17 | Enhanced Recovery Project | No Violations | Checked on status of cleanup. Cleanup has been performed. Seed, straw, lime and new topsoil observed. Run tickets have not been received. |
0923987207 | 2012-02-09 | Enhanced Recovery Project | No Violations | Accompanied by Inspector Kip Thompson, I witnessed the construction of a new tank battery containment for added storage for this facility. |
0930934140 | 2014-04-09 | Enhanced Recovery Project | Violations Noted | Inspected the unloading pad, containment dikes, tanks, injection line, pump house, annulus pressure, and injection pressure. Both containment dikes have oil and water in them. Both containment dikes have oil covered leaves and debris. Remove oil, water and contaminated debris from the containment dikes. The unloading pad containment vault has contamination around the top of the vault. Remove the contaminated material. All solids that are removed must be taken to an EPA approved land fill for disposal. The unloading pad drain has a screw in plug that is blocking the drain. Remove the plug and allow the containment pad drain to function as designed. |
0935642072 | 2009-06-02 | Enhanced Recovery Project | Violations Noted | FOLLOW UP TO NOV # -563611421 FOLLOW UP TO NOV # -1116586588 An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed on the injection side of the well. The iden |
0937568820 | 2015-06-24 | Enhanced Recovery Project | No Violations | Compliance Notice Follow up. Hocking Hills brine truck removing the fluids from the containment dike. Currently excavating the contaminated soil outside of the containment dike. A roll off container from Farmers Refuse is on site. One injection line leak has been repaired. Attempted to fill and test the injection line. Was not able to pressure up the injection line to test. Company is deciding what remedial action they will take for the injection line. |
0989670404 | 2019-04-29 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019. |
1006309625 | 2009-09-04 | Enhanced Recovery Project | No Violations | A follow-up inspection to Notice of Violation and Compliance Schedule revealed no pressure on the annulus. |
1019877444 | 2012-09-14 | Surface Facility Construction | No Violations | Witnessed grading of dirt around containment dike, and the installation of steel walkways. |
1034836549 | 2007-12-05 | Enhanced Recovery Project | No Violations | Checked on the status of project. During the inspection, it was noted that a 210 bbl tank has been placed inside the dike. A 100 bbl tank was observed outside the dike. Doug Kitchen had been previously instructed to submit a new design to Tom Tomastik. |
1043494133 | 2006-10-26 | Enhanced Recovery Project | No Violations | The packer was set at 2833 A pressure test was performed on the annulus between longstring and tubing. The well passed and lost only 1 psi (660 to 659) in fifteen minutes. |
1074673853 | 2016-11-14 | Enhanced Recovery Project | No Violations | Chiefs Order # 2015-445 follow up inspection. The containment dike has 12 inches of fluid in it. The injection tubing is not connected to an injection line or injection equipment. Vegetative cover has been established on the remediated area. |
1106575165 | 2005-01-20 | Annular Disposal | No Violations | Checked AD for Columbus, AD not hooked up. NEW LAT & LONG |
1116586588 | 2009-06-02 | Enhanced Recovery Project | Violations Noted | An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed on the injection side of the well. The identification at the well does not contain the ERP #. No identification was observed at the storage tank. The contractor for Chieftain Energy., Mr. Ron McBride, was notified of the deficiencies, in person, on 6/2/2009 at approximately 12:30 pm. |
1117182163 | 2018-05-04 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the 2017 Enhanced Recovery Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018. Form 204 received 6/27/2018 |
1123703794 | 2019-01-28 | Salt Water Injection Well | No Violations | My inspection was to determine if the water in the containment dike at this salt water injection well contained chlorides. I tested the water in the containment dike in two areas using high quantabs and did not detect any chlorides using the high range quantabs. |
1126947469 | 2020-5-14 0:00: | ER | No Violations | 1.00 |
1131589331 | 2013-11-25 | Enhanced Recovery Project | No Violations | Inspected the containment dikes, tanks, unloading pad, pump house, injection line, injection pressure, and annulus pressure. Identification has not been changed to reflect the current well owner Hocking Hills Energy Well Service. The pump house has been severely damaged by fire. I called and talked to Dale Campbell. Dale stated that the fire was caused by a lightning strike that followed the electric line into the pump house. We discussed the need for them to notify the state when damage occurs to their facility. We also discussed the need for updated identification. They also need to replace the 1/4 fitting on the injection tubing. The threads are corroded. Flow meter is in gallons. |
1162229060 | 2006-10-25 | Enhanced Recovery Project | No Violations | On 10/25/2006, UIC construction was observed. 2 3/8 tubing is being pulled. |
1165834760 | 2013-04-10 | Salt Water Injection Well | No Violations | UIC training with Jon Scott, see Jon Scotts reports for details. |
1167754030 | 2012-02-23 | Surface Facility Construction | No Violations | Pit construction. 4 to 6 layer of sand below the 30 mil liner. 30 mil liner has been installed. 4 to 6 of sand on top of liner. |
1188409674 | 2007-08-29 | Surface Facility Construction | No Violations | Checked on surface facility construction. Dike has been constructed and witnessed installation of 30 mil liner. |
1212564332 | 2009-03-03 | Enhanced Recovery Project | No Violations | An inspection revealed no annulus pressure or identification at the storage tank. Chieftain Energy will be instructed to correct these deficiencies before the next inspection. |
1216155987 | 2008-07-15 | Enhanced Recovery Project | No Violations | An inspection revealed that Doug Kitchen is performing cleanup around the well site. |
1219146359 | 2012-08-20 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -1767643327 Annulus pressure 0. Company needs to perform full hydrostatic test to prove mechanical integrity. The tape on the seam on the new piece of liner also needs finished. Spoke with Dave Poling about these issue. He stated that they had been working on other wells and will get on those issues as soon as possible. |
1230306936 | 2010-06-15 | Enhanced Recovery Project | No Violations | Witnessed Injection Line Test. All leaks have been addressed and check valve flap removed. The line did not contain a brass Y strainer this time, due to crack. Mr. Ron McBride with Chieftain Energy states it will be replaced with steel. |
1245201387 | 2012-06-13 | Enhanced Recovery Project | Violations Noted | FOLLOW UP TO NOV # 1651780143 Construction of a 12 by 14 block pump house on an 8 thick concrete slab with in the original dike. Dike contains a black steel horizontal tank that measures 27 by 8. Dike measures 48 by 26.5. Dike has a build up of sand in middle of dike. Dike has had recent oil in dike and oil has flowed to top of the lowest portion of dike. A new sump pump has been installed in both dikes and concrete vault for unloading pad. Inspection of the well revealed slight vacuum on the annulus. Doug Kitchen was notified in person at the well site that he needs to test the annulus to the maximum injection pressure for 15 minutes. Doug was also notified that he needs to replace the 1/4 injection fitting. (threads are stripped out.) |
1250352730 | 2012-07-06 | Surface Facility Construction | No Violations | Pump has been placed inside block building. Currently installing electric panel and conduit. Dike liner on site to repair and extend liner over raised dike wall. Talked to Doug Kitchen about the flow meter that needs to be installed between the pump and the well. |
1321971689 | 2015-07-10 | Enhanced Recovery Project | No Violations | Compliance Notice # 1412190582 follow up inspection. Contaminated soil is in a roll off container with a tarp install on top. The roll off material has been sampled for a profile and is waiting for the sample results before being taken to the landfill. Contaminated material has been removed from the containment dikes. The cement pieces from the unloading pad demolition is in a pile with a dike built around it waiting on another roll off container. Reviewed the cleanup efforts and facility plans with Shawn Maynard. |
1326364925 | 2009-06-02 | Enhanced Recovery Project | Violations Noted | FOLLOW UP TO NOV # -1381541048 FOLLOW UP TO NOV # 682000589 -1116586588 FOLLOW UP TO NOV # -1116586588 An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed |
1331135735 | 2012-02-08 | Enhanced Recovery Project | No Violations | Constructing new dike. Meet with Doug Kitchen about dike specifications. |
1334059463 | 2012-03-29 | Enhanced Recovery Project | No Violations | An inspection revealed that the dike and the vault were full of fluid. A call was made to Mr. Ron McBride of Chieftain energy and violation was resolved immediately. |
1335959289 | 2012-05-01 | Enhanced Recovery Project | No Violations | Inspected condition of dike. It was free of fluid. |
1340138117 | 2012-06-18 | Salt Water Injection Well | No Violations | Mechanical integrity test of the annulus. Annulus took 1 gallon of fresh water to fill up. Tested annulus at 730 psi for 15 minutes after 15 minutes test pressure at 728 psi. Test passed. Tubing and packer were not effected during the test. Accompanied by Andy Thomas MRI 2. Discussed with Doug Kitchen and Ron McBride raising the dike wall to add capacity to dike since the addition of the concrete pad and block pump house to the original dike. |
1340209395 | 2012-06-20 | Surface Facility Construction | No Violations | Ron McBride has removed the soil from the outside edge of the dike liner. They have removed the majority of the contaminated sand from inside the dike. The liner has been folded into the dike to allow build up of dike wall. They are currently building up the dike wall to 34. |
1340798557 | 2012-06-18 | Enhanced Recovery Project | No Violations | Witnessed mechanical integrity test on the annulus. Accompanied by inspector Jon Scott. Test was passed. |
1340923675 | 2012-06-27 | Surface Facility Construction | No Violations | Original dike with Horizontal tank has been built up to 34 around the outside wall. I talked to Ron McBride about the flow meter. Checked the injection pressure and the annulus. Annulus was on zero pressure. Annulus fluid level is at surface. |
1341498904 | 2012-06-13 | Enhanced Recovery Project | Violations Noted | Construction of a 12 by 14 block pump house on an 8 thick concrete slab with in the original dike. Dike contains a black steel horizontal tank that measures 27 by 8. Dike measures 48 by 26.5. Dike has a build up of sand in middle of dike. Dike has had recent oil in dike and oil has flowed to top of the lowest portion of dike. A new sump pump has been installed in both dikes and concrete vault for unloading pad. Inspection of the well revealed slight vacuum on the annulus. Doug Kitchen was notified in person at the well site that he needs to test the annulus to the maximum injection pressure for 15 minutes. Doug was also notified that he needs to replace the 1/4 injection fitting. (threads are stripped out.) |
1341836748 | 2012-06-27 | Surface Facility Construction | No Violations | Inspected work in progress with inspector Jon Scott. |
1343069615 | 2012-07-19 | Surface Facility Construction | No Violations | Inspected tank battery containment liner where it had been patched and added on to. Some of the seams had bubbles in them and the liner had pulled away from the tape. I told the company that this had to remedied before it was covered. We then discussed ways of fixing it. I also observed some of the plumbing as it was assembled. We also discussed the placement of a flow meter. |
134367124 | 2018-1-18 0:00: | SW | No Violations | 1.00 |
1347469692 | 2012-09-06 | Enhanced Recovery Project | No Violations | Witnessed mechanical integrity test on the annulus. A new rubber seal was put on the wellhead, then annulus was pressured up to 680 psi using a hand pump. Pressure was held for 15 minutes with no loss. |
1353175915 | 2012-02-08 | Enhanced Recovery Project | No Violations | Accompanied Inspector Jon Scott on an inspection of the construction of a new tank battery containment for this well. Met with Mr. Doug Kitchen from Chieftain Energy at the site. |
1358435665 | 2013-01-14 | Enhanced Recovery Project | No Violations | This is a follow-up inspection to the compliance notice that was issued by Jon Scott UIC Inspector III on 1/11/13. The contaminated soil around the unloading pad vault has been removed. The contaminated leaves and some of the contaminated sand has been removed. New sand has been placed in the dike in the areas that contaminated sand has been removed. Spoke with company men Mr. Bill Deible and Mr. Bryan Campbell. We discussed plans of remediation for the rest of the site including the sump system for the containment dikes and the vault and the removal and replacement of the horizontal tank. I told them to make sure that a drawing of what they planned to do was submitted the UIC section in Columbus. |
1358449690 | 2013-01-15 | Enhanced Recovery Project | No Violations | More contaminated sand had been taken out of the dike and replaced with clean sand. Remedial work had cease for half of a day due to their backhoe breaking down. Accompanied Jon Scott UIC Inspector III on this inspection. |
1358955718 | 2013-01-15 | Enhanced Recovery Project | No Violations | Both dikes are free of water and oil. All of the oil coated leaves have been removed from the dike. Contaminated sand is being removed and placed in a dump truck on site. New sand is being placed in the dike. Dike clean up is 2/3 completed. The contaminated soil around the unloading pad vault has been removed and replaced with fresh soil. All contaminated soil, leaves and sand are to be hauled to a EPA approved land fill. Accompanied by Andy Thomas MRI 2. |
1360242401 | 2013-02-06 | Salt Water Injection Well | No Violations | Assisted Jon Scott UIC inspector III, in taking a brine sample from the pump house. I checked the pressures at the well. Also present during this inspection was Mr. Bill Deible. Flow meter reading is in gallons. We also discussed with Mr. Deible the sump pump situation with the two containment dikes and the vault for the unloading pad. |
1360610363 | 2013-02-11 | Enhanced Recovery Project | No Violations | Inspected the plumbing of the sump pumps in the tank battery and the vault for the unloading pad. Each of the three sump pumps are now plumbed separately into the horizontal tank and the 280 barrel tank. I also showed Mr. Bill Deible how to monitor the annulus and injection pressures using his companys gauges. |
1366586631 | 2008-07-25 | Production Wells | No Violations | Checked on status of surface facility construction. No activity or progress was observed. |
1379345853 | 2013-09-16 | Salt Water Injection Well | No Violations | UIC inspection, the annulus pressure was 182 PSI, the injection pressure was 0 PSI. The dike contained approx 12 of water. The sump pump was not plugged in. I contacted Bill Diebel to have this corrected. |
1381541048 | 2009-06-02 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 682000589 -1116586588 FOLLOW UP TO NOV # -1116586588 An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed |
1390555228 | 2014-03-11 | Salt Water Injection Well | No Violations | UIC inspection, the injection is on vacuum, the annulus has 75 PSI. No violations noted. |
1398181444 | 2014-04-22 | Enhanced Recovery Project | No Violations | Compliance Notice # 930934140 Follow up inspection. Inspected the unloading pad, containment dikes, tanks, injection line, pump house, annulus pressure, and injection pressure. Both containment dikes have oil and water in them. Both containment dikes have oil covered leaves and debris. Some work has been done since the last inspection. The 4 plug in the unloading pad drain has been removed. A leaking valve on the 300 barrel tank has been repaired. A small portion of the contaminated leaves with in the containment dikes has been moved into piles. The access road has some new gravel on it near the well site. I called Dale Campbell and left a voice message asking why the clean up has not been done and outlining the work that still needs to be done to be in compliance. I left my phone number and asked that he call me. I called Bill Diebel (well tender) and Bill told me that he fixed the valve that caused the leak in the one containment and that he is working on cleaning up both dikes. I reviewed the work that still needs to be done with Bill. |
1398702649 | 2014-04-28 | Enhanced Recovery Project | No Violations | Compliance Notice # 930934140 Follow up inspection. 90% of the oil has been removed from the containment dikes. 80% of the contaminated leaves have been removed from the containment dike. Cleanup is not completed. |
1400001286 | 2014-05-13 | Enhanced Recovery Project | No Violations | Compliance Notice # 930934140 Follow up inspection. All of the oil has been removed from the containment dikes. All of the contaminated leaves have been removed from the containment dikes. Both dikes are free of water. The plumbing and use of the black horizontal tank has been changed to only store water that has been pumped from the containment dike sumps and the unloading pad sump. Bill Deible was on site during the inspection we discussed the need to upgrade the unloading pad drain vault. The current vault allows surface water during a rain event to enter the top of the vault and has overflowed the vault in the past. |
1412190582 | 2014-10-01 | Enhanced Recovery Project | Violations Noted | Inspected the unloading pad, containment dikes, tanks, injection line, annulus pressure and injection pressure. A scald area was observed outside the containment dikes. Approximately 75 by 3. Soil was field tested for chlorides. High range Quantab was maxed out at 6508 ppm Cl. I called Bill Diebel and he came out to the well site. I told Bill that the contaminated area must be remediated. The unloading pad sump had overflowed as well. I told Bill that the sump needs to be upgraded to prevent surface water from flowing into the top of the sump pit. I called Dave Poling and discussed the sump pit issues and what was needed to remediate the contaminated areas. I told Dave that the sump must be one piece construction with the top extending at least 6 above the ground level. |
1413911093 | 2014-10-21 | Enhanced Recovery Project | No Violations | Compliance notice # 1412190582. Inspected the unloading pad, vault, containment dikes, tanks, injection pressure and annulus pressure. There were no noticeable efforts to remediate the contaminated areas outside the containment dikes. A high range Quantab was placed in a puddle with in the contaminated area it read 7.8 on the strip which is 3220 ppm Cl. The unloading pad vault has not been replaced. |
1414004439 | 2014-10-22 | Enhanced Recovery Project | No Violations | The injection operations have stopped until the surface facility is reworked. I talked to Dave Poling and they are planning an extensive remodel of the existing surface facility. Dave is going to submit for an extension. |
1414676143 | 2014-10-29 | Administrative Inspection | No Violations | I received this Email from Dave Poling on 10-29-14. Mr. Scott:
This email is to inform you that the ERP well owned by Hocking Hills Energy & Well Services, LLC is offline, shut down and not in operation at this time. We are evaluating the current configuration of the well, tank system, unloading area and roadway. Your concern about the pit behind the unloading area is understood and will be addressed as we perform the upgrade. Shortly, a drawing will be forwarded to you for your input and thoughts. Let me know if you have any other concerns. Dave Poling, Member Hocking Hills Energy & Well Services, LLC |
1421544494 | 2015-09-17 | Enhanced Recovery Project | No Violations | Both containment dikes have water in them. There has been no effort to remove the contaminated material from the location since the last inspection on 9-14-15. No equipment is on site for the remediation. There are no roll off boxes on site. |
1432912921 | 2014-03-20 | Salt Water Injection Well | No Violations | Compliance notice follow-up. The well is in compliance, this satisfies the compliance notice. |
1434723267 | 2015-06-18 | Enhanced Recovery Project | Violations Noted | |
1436302375 | 2015-07-06 | Enhanced Recovery Project | No Violations | Compliance Notice # 1412190582 follow up inspection. UST Environmental Contractor arrived on site with a vac truck to remove material from the black horizontal tank and to clean out contaminated material. A roll off container on site was not covered with a tarp and contaminated soil and used filter socks were mixed with rain water. Hocking Hills Energy is using their vac truck to remove the water from the roll off box. Both containment dikes have water and oil in them. The dikes are being cleaned using the UST truck and labor. Doug Kitchen is operating the trac hoe and has removed the unloading pad and unloading pad sump. This material along with additional excavated contaminated soil is being placed in roll off containers and shipped to the landfill. All injection equipment and valves are shut off. All solids are being placed in the roll off box and all liquids are being pumped into the 300 barrel tank with in the containment dike. Plans have been submitted to the UIC section for review regarding the new unloading pad and containment dike construction. |
1443450631 | 2015-09-28 | Salt Water Injection Well | No Violations | Hocking Hills Energy has finished removing contaminated soil. The existing tanks are being pressure washed. The last container containing soil has been taken to the landfill. |
1444059611 | 2015-10-02 | Enhanced Recovery Project | No Violations | Chiefs Order # 2015 445 Follow up inspection. Collected field soil samples and tested with High Range Quantabs. Sampled at GPS N39.48999/W082.39807 Sample was collected from the center of the triangle scald area off of the access road measuring 44 by 34 by 26. Quantab result was 7.2 on the strip =2986 ppm Cl. Collected a sample at GPS N39.48898/W082.39716 The Quantab result was 3.6 on the strip = 650 ppm Cl. Collected a sample at GPS N39.48885/W082.39716 The Quantab result was 5.8 on the strip = 1630 ppm Cl. The containment dike with the pump house has been excavated and the material removed from the location. Waiting on documentation of disposal in an EPA approved landfill. The area that was delineated with red flags has had soil brought in and graded with seed and mulch applied. The existing containment dike has 12 of fluid in it. Well is completely disconnected from the tanks and any injection equipment. |
1444403726 | 2015-10-08 | Enhanced Recovery Project | No Violations | Chiefs Order # 2015-445 follow up inspection. Collected soil and water samples from the location and took them to the ODNR Lab. Containment dike has 12 of fluid in it. The well is disconnected from all injection equipment. |
1448638331 | 2015-11-25 | Enhanced Recovery Project | No Violations | Chief Order No. 2015-445 Follow-Up inspection. Injection tubing master valve is closed. Injection tubing is not connected to injection line or equipment. The containment dike has 16 of water in it. Annulus has zero pressure with fluid at surface. Vegetative cover is being established on most of the remediation site. Five areas of water on the surface were tested for chlorides with High Range Quantabs (QT). QT # 1= 1630 ppm Cl. QT # 2= 917 ppm Cl. (both QT 1 & 2 were East of the injection well). QT # 3= 917 ppm Cl. QT # 4= 1501 ppm Cl. (QT3 &4 are located West of the injection well and South of the containment dike). QT #5=400 ppm Cl. (located North west of the well). |
1461494217 | 2012-11-27 | Enhanced Recovery Project | No Violations | The dikes for both tank batteries were free of fluid and had vegetation established on the sides of them as well. Mr. Bill Deible and Bryan Campbell were on site. The flowmeter reading is in gallons. |
146196985 | 2011-12-15 0:00 | ER | No Violations | |
1462468369 | 2016-05-03 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 Follow up inspection with UIC Supervisor. The containment dike plastic liner has multiple holes including large holes (6-8) where the top of a tree fell into the dike. The dike has fluid in it. There is a scald area approximately 12 by 25. The well is disconnected from injection equipment. The injection tubing master valve is closed. The annulus has zero pressure. |
1469536062 | 2016-07-22 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 follow up inspection. The remediation of the contaminated area out side of the dike area is complete. Vegetative cover has been established. The containment dike has 20 inches of fluid in it. The injection tubing is not connected to the facility. The annulus has zero pressure. |
1474189227 | 2011-07-06 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -897437627 Zero pressure on injection tubing. Zero pressure on annulus. Test Annulus to 675 psi for 15 minutes. Schedule test with Jon Scott MRI2 740-624-4963. Brine on wellhead maxed out High End Quantabs. Repair or replace tubing at wellhead. Brine in dike. Remove brine from dike and dispose in an Injection well. Replace 1/4 needle valve on Injection tubing. |
1478404728 | 2013-02-06 | Enhanced Recovery Project | No Violations | Inspected the injection pressure and annulus pressure. Inspected the storage tanks and pump house. Collected brine sample and sent sample to lab. Accompanied by Andy Thomas MRI 2. |
1483595985 | 2015-06-22 | Enhanced Recovery Project | No Violations | Compliance Notice # 1412190582 Follow up inspection. Containment dikes have not been emptied. There is a backhoe on site. No excavation has been done to the contaminated areas. The only change to the site that was noticed was the grass has been cut around the dikes. |
1485677477 | 2004-09-28 | Annular Disposal | No Violations | Follow-up, Non-Compliance, Doug Kiycken and Joe Hoerst on inspection. |
1490803259 | 2017-03-20 | Enhanced Recovery Project | No Violations | Chief Order # 2015-445 Follow up Inspection. The containment dike has 8 inches of fluid in it. The well is not connected to an injection line or injection pump. The injection tubing master valve is closed. |
1491156159 | 2015-07-30 | Enhanced Recovery Project | No Violations | Both containment dikes had water and one had water and oil. The contaminated soil in the roll off box is on site. No additional work has been done to the contaminated areas. Six areas were selected to use High Range Quantabs to determine the chloride levels. 1st 5392 ppm Cl, 2nd, 3rd and 4th exceeded 6078 ppm Cl. 5th 3214 ppm cl, 6th 1613 ppm Cl. There was no activity at the site today. No additional contamination has been remediated. The unloading pad has been removed and is piled up on the ground. There has been no new construction on the site. Inspected the injection pressure and the annulus pressure. The injection line is disconnected at the containment dike. |
1508293519 | 2008-05-22 | Enhanced Recovery Project | No Violations | An inspection revealed that the suface facility construction has not been completed. No pressure observed on annulus or injection side of the well. |
1549989250 | 2019-02-12 | Salt Water Injection Well | No Violations | I conducted a status check to observe the fluid in the dike for the tank battery. The dike was full of fluid and had an approximate 1 inch layer of ice. It was raining during the inspection and had been raining since the previous day. Time of inspection: 9:00 AM. Weather: 46 degrees F, Rain |
156012850 | 2010-6-10 0:00: | ER | No Violations | |
1585283855 | 2012-06-25 | Surface Facility Construction | No Violations | Witnessed dike augmentation activities. Discussed with Mr. Doug Kitchen possibilities for adding to the existing liner so that it will drape over the top and sides of the dike. |
1592764413 | 2012-02-23 | Enhanced Recovery Project | No Violations | Witnessed placement of the liner in the new containment dike and placement of sand on top of the liner. Accompanied by Inspector Jon Scott. |
1609198785 | 2009-07-20 | Enhanced Recovery Project | No Violations | A follow-up inspection to Notice of Violation and Compliance Agreement Schedule revealed that identification has now been placed at the well and storage tank. However, there is still no pressure on the annulus. Prior to this inspection, a 7/14/2009 meeting had been conducted with both Mr. Doug Kitchen, the well owner, and Mr. Ron McBride, Chieftain Energy Contractor. During the meeting a Compliance Schedule was agreed upon by both parties. The deadline for compliance was 7/17/2009. Mr. McBride states that he placed 50 lbs of pressure on the annulus. Mr. McBride was instructed to check for leaks and again place more pressure on the annulus. |
1619954482 | 2003-05-29 | Annular Disposal | No Violations | Follow-up, Non-Compliance, company still has some leveling and seeding to do, kill area still below production tank. Spoke with Doug Kitchen will have work done by 6/2/03. |
1625747241 | 2009-06-02 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 682000589 FOLLOW UP TO NOV # -1116586588 An inspection of the ERP and related storage tank was conducted with Mr. Jeff Fry. During the inspection, it was noted that the annular side of the well did not contain positive pressure. Vacuum was observed on the injection side of the well. The identification at the well missing ERP # and need ID at tank. |
1651780143 | 2012-06-13 | Enhanced Recovery Project | No Violations | Construction of a 12 by 14 block pump house on an 8 thick concrete slab with in the original dike. Dike contains a black steel horizontal tank that measures 27 by 8. Dike measures 48 by 26.5. Dike has a build up of sand in middle of dike. Dike has had recent oil in dike and oil has flowed to top of the lowest portion of dike. A new sump pump has been installed in both dikes and concrete vault for unloading pad. Inspection of the well revealed slight vacuum on the annulus. Doug Kitchen was notified in person at the well site that he needs to test the annulus to the maximum injection pressure for 15 minutes. Doug was also notified that he needs to replace the 1/4 injection fitting. (threads are stripped out.) |
1676404973 | 2013-07-03 | Salt Water Injection Well | No Violations | Injection well inspection, the annulus pressure was 246 PSI, the injection side is on vacuum. The dike has approx 4 of water in it. I have contacted Seneca Steel to have the fresh water removed from the dike. Bill Diebel has agreed to remove the fresh water today. |
1712197945 | 2010-05-14 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. Arrived at the location and met with Chieftain Energy Contractor, Mr. Ron McBride. The pressure on the injection line from tank to well (disconnected) was at approximately 400 psi and dropping. At this time, Mr. McBride is unable to achieve the required maximum injection pressure of 675 psi to test line. Mr. McBride states that the line is full, but the pump will continually shut down. He was instructed that injection is not allowed at this time. The line must pass the required test prior to injection. The dike has been pumped and nearby gas line from non-related well has now been repaired. Informed Mr McBride that well site and lease road need to be graded. |
1724006903 | 2006-03-29 | Annular Disposal | No Violations | An inspection of the well and well site was performed for the UIC Section, company has applied for a Enhanced Recovery Project on this well, after reviewing site and speaking with Owner Doug Kitchen about location of Surface Facility, fencing should be pl |
1766418051 | 2009-01-21 | Surface Facility Construction | No Violations | An inspection revealed that the surface facility construction has now been completed. Chieftain Energy has been instructed to place positive pressure on the annulus, and identification at the storage tank. |
1767643327 | 2012-08-20 | Enhanced Recovery Project | Violations Noted | Annulus pressure 0. Company needs to perform full hydrostatic test to prove mechanical integrity. The tape on the seam on the new piece of liner also needs finished. Spoke with Dave Poling about these issue. He stated that they had been working on other wells and will get on those issues as soon as possible. |
1770508949 | 2006-06-19 | Enhanced Recovery Project | No Violations | No violations were found at the time of the inspection. The enhanced recovery project has not been completed for this well. |
1775057382 | 2019-04-03 | Salt Water Injection Well | No Violations | My inspection was at the request of well owner, Mr. Doug Kitchen. Mr.Kitchen requested I performed a mechanical integrity test on the well. The test was held for 15 minutes with 698 PSI on the injection tubing. The well did not lose any pressure during the 15 minute test. The containment dike was free of fluid but had approximately 1 foot of leaf litter. Mr. Kitchen said the leaf litter would be removed today. |
1776951922 | 2012-06-26 | Surface Facility Construction | No Violations | Crews were plumbing lines back in. Dirt work for dike had been completed. |
1799809297 | 2015-09-24 | Salt Water Injection Well | No Violations | Hocking Hills Energy has removed the block pump house and all associated plumbing. The contaminant dike has been removed and the effected soil has been taken to kilbargers landfill. I have tested the remaining soil for chlorides and will continue to do so during demolition. |
1812844999 | 2012-06-20 | Surface Facility Construction | No Violations | Witnessed crews moving dirt to raise the walls of the dike around one of the tank batteries. |
1826542234 | 2012-06-06 | Enhanced Recovery Project | No Violations | Two tanks have been set in new containment dike. One being a 210 barrel and the other is a 280 barrel tank. The tanks have been plumbed in and are ready to be used. A new concrete pad has been poured in the original containment dike. New photos were taken during inspection. |
1834966995 | 2011-12-15 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott on inspection. Needs new needle valve for injection pressure monitoring. Dike full of water. New photos obtained during inspection. |
1861170286 | 2016-06-03 | Salt Water Injection Well | No Violations | Hocking Hills Energy has removed soil that is contaminated with brine. The soil was tested using Quantabs. Average results using the Quantabs was 500-900 PPM chlorides. The area was backfilled with topsoil and seeded. |
1862013710 | 2008-07-15 | Enhanced Recovery Project | No Violations | Met with Mr. Doug Kitchen at the well site. Mr. Kitchen was shown the impacted areas and instructed to remove contaminated soil and bring in new soil, seed, straw and apply lime to these areas. Mr. Kitchen was again verbally instructed to complete surface facility before injection. |
1874240395 | 2011-03-31 | Enhanced Recovery Project | No Violations | No violations observed during inspection. |
1883916871 | 2012-07-31 | Surface Facility Construction | No Violations | Inspected installation of new flow meter. I noticed fluid in the containment dike. I notified Mr. Doug Kitchen immediately (he was on site at the time). He stated that he had to fix the float on the sump pump so that it would pump the fluid down to a lower level. |
1904628193 | 2019-3-13 0:00: | ER | No Violations | |
1921632420 | 2015-01-28 | Salt Water Injection Well | No Violations | UIC inspection, the annulus pressure was 46 PSI, the injection pressure was 0 PSI. |
1923010994 | 2013-04-10 | Enhanced Recovery Project | No Violations | Inspected containment dikes, injection pressure and annulus pressure. Good identification on well. Dikes are free of water. A small amount of oil (approximately 2 gallons) has leaked from the top of the horizontal tank. I talked to Doug Kitchen about the need to repair the tank so that it does not leak oil into the dike. The unloading pad had some sludge from cleaning the filters. I told Doug to clean up the sludge on the unloading pad. Flow meter reading is in gallons. Accompanied by Kip Thompson MRI 2. |
1936973023 | 2008-09-17 | Enhanced Recovery Project | No Violations | An inspection revealed that the surface facility has not been completed. 1/4 valves have been installed on injection and annulus side of the well. No annulus pressure observed. |
1944722098 | 2012-08-07 | Surface Facility Construction | No Violations | Inspected the patches being put on the liner in the containment dike. Accompanied by inspector Morgan Button. |
1984598286 | 2012-07-06 | Surface Facility Construction | No Violations | Witnessed new injection pump being set. During the inspection, I noticed leaching of fluid from bottom of dike. Inside of the dike fluid was present. The liner was still folded inside the dike. Due to recent rain events fluid had made it over the liner and caused the problem. Doug Kitchen and Bill Deible were instructed to remove fluid from inside of dike before the end of the day. |
2016531117 | 2018-05-21 | Salt Water Injection Well | No Violations | The salt water injection well had 81 psi on the annulus and 0 psi on the injection tubing. The well had a legible identification. |
2026205392 | 2007-06-26 | Surface Facility Construction | No Violations | Met with Chieftain Energy, regarding the UIC construction requirements for this ERP. The company was informed of the dike requirements including the concrete vault with sump (coated), 30 millimeter liner and fence. Measurements revealed that more work will be needed on the dike. It was noted that the dike height would need to be raised approximately 2 inches to meet the 32 inch requirement. |
2049404676 | 2012-02-22 | Surface Facility Construction | No Violations | Constructing new dike. |
2094271860 | 2010-12-28 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Snow cover at time of inspection. |
2097609832 | 2016-03-17 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. reports received |
2129194491 | 2014-04-09 | Enhanced Recovery Project | Violations Noted | FOLLOW UP TO NOV # 930934140 Inspected the unloading pad, containment dikes, tanks, injection line, pump house, annulus pressure, and injection pressure. Both containment dikes have oil and water in them. Both containment dikes have oil covered leaves and debris. Remove oil, water and contaminated debris from the containment dikes. The unloading pad containment vault has contamination around the top of the vault. Remove the contaminated material. All solids that are removed must be taken to an EPA approved land fill for disposal. The unloading pad drain has a screw in plug that is blocking the drain. Remove the plug and allow the containment pad drain to function as designed. |
2146088841 | 2015-09-14 | Enhanced Recovery Project | No Violations | Compliance Notice Follow up. 2/3rds of the water in the containment dikes has been removed. No contaminated material has been removed from the location. There has been no activity except the removal of water and oil from the dikes. No roll off boxes or excavating equipment is on site. |
224425600 | 2009-12-3 0:00: | ER | No Violations | |
261149307 | 2012-7-13 0:00: | SC | No Violations | 1.50 |
278715626 | 2010-9-7 0:00:0 | BH | No Violations | |
298240305 | 2010-9-22 0:00: | ER | No Violations | 1.00 |
31053836 | 2007-7-30 0:00: | SC | No Violations | |
331422685 | 2016-2-3 0:00:0 | ER | No Violations | 2.00 |
359615844 | 2015-12-31 0:00 | ER | No Violations | 4.00 |
375637493 | 2008-8-8 0:00:0 | ER | No Violations | |
378216293 | 2008-12-8 0:00: | SC | No Violations | |
388118204 | 2012-2-22 0:00: | ER | No Violations | 4.00 |
390510777 | 2016-6-15 0:00: | ER | No Violations | 1.00 |
395669655 | 2006-6-19 0:00: | ER | No Violations | |
40479472 | 2010-3-12 0:00: | ER | No Violations | |
475214848 | 2018-8-7 0:00:0 | ER | No Violations | 1.00 |
57766270 | 2011-2-1 0:00:0 | ER | No Violations | 0.50 |
596856320 | 2014-8-4 0:00:0 | SW | No Violations | 0.20 |
62416454 | 2008-11-25 0:00 | SC | No Violations | |
640176974 | 2008-6-16 0:00: | ER | No Violations | |
682000589 | 2009-6-2 0:00:0 | ER | No Violations | |
714685875 | 2013-2-6 0:00:0 | ER | No Violations | |
716073848 | 2015-9-8 0:00:0 | ER | No Violations | 5.00 |
71971176 | 2016-3-21 0:00: | ER | No Violations | 3.00 |
739028801 | 2016-6-2 0:00:0 | SW | No Violations | 8.00 |
755009655 | 2004-11-26 0:00 | AD | No Violations | |
930934140 | 2014-4-9 0:00:0 | ER | No Violations | 3.50 |
935642072 | 2009-6-2 0:00:0 | ER | No Violations | |
937568820 | 2015-6-24 0:00: | ER | No Violations | 5.50 |
989670404 | 2019-4-29 0:00: | ER | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0278715626 | US-OH-122890 | 2010-10-06 | Pollution and contamination | |
0278715626 | US-OH-122891 | 2010-10-06 | Spreading brine on unapproved road surfaces | |
0278715626 | US-OH-122892 | 2010-10-06 | Spreading of an unapproved fluid | |
0278715626 | US-OH-122893 | 2010-10-06 | Pollution/Contamination | |
0278715626 | US-OH-122894 | 2010-10-06 | Contamination at storage facility (permit after 6/1/82) | |
0581161508 | US-OH-126520 | 2013-02-08 | Pollution/Contamination | |
0581161508 | US-OH-126521 | 2013-02-08 | Storage facilities contamination (permit before 6/1/82) | |
0595775573 | US-OH-126717 | 2018-09-13 | 9-5-09[C] | Failure to conduct or pass mech. integrity test |
0640176974 | US-OH-127257 | 2008-07-15 | Pollution/Contamination | |
0646446501 | US-OH-127332 | 2004-05-17 | Well operation causing pollution and contamination | |
0646446501 | US-OH-127333 | 2004-05-17 | Failure to legibly identify well | |
0897437627 | US-OH-130230 | 2011-07-07 | Failure to monitor annulus pressure | |
0897437627 | US-OH-130231 | 2011-07-07 | Mechanical failure/contamination | |
0897437627 | US-OH-130232 | 2011-07-07 | Failure to keep dike or pit free of brine or other wastes | |
0930934140 | US-OH-130644 | 2014-05-20 | Pollution/Contamination | |
0930934140 | US-OH-130645 | 2014-05-20 | Contamination at storage facility (permit after 6/1/82) | |
0935642072 | US-OH-130709 | 2018-03-23 | Failure to conduct or pass mech. integrity test | |
0989670404 | US-OH-131364 | 2019-05-09 | Failure to file enhanced recovery annual report | |
1116586588 | US-OH-102933 | 2009-06-08 | Failure to monitor annulus pressure | |
1116586588 | US-OH-102934 | 2009-06-08 | Insufficient/No identification | |
1117182163 | US-OH-102956 | 2018-08-03 | Failure to file enhanced recovery annual report | |
1245201387 | US-OH-106542 | 2018-09-13 | 9-5-09[C] | Failure to conduct or pass mech. integrity test |
1326364925 | US-OH-109318 | 2017-10-23 | Failure to conduct or pass mech. integrity test | |
1341498904 | US-OH-109835 | 2012-07-05 | Failure to monitor annulus pressure | |
1412190582 | US-OH-112135 | 2016-08-26 | Pollution/Contamination | |
1434723267 | US-OH-112714 | 2015-07-17 | Pollution/Contamination | |
1434723267 | US-OH-112715 | 2015-07-17 | Contamination at storage facility (permit after 6/1/82) | |
1767643327 | US-OH-117591 | 2012-08-22 | Failure to monitor annulus pressure | |
2097609832 | US-OH-121411 | 2016-07-21 | Failure to monitor pressures or volumes/failure to file | |
2129194491 | US-OH-121814 | 2018-09-13 | 9-5-09[C] | Failure to conduct or pass mech. integrity test |