If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-22323 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.52,"lon":-82.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Hocking | |
Municipality: Ward Township | |
Operator Name: RELIANCE ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: SUNDAY CREEK COAL CO | |
License Status: Final Restoration | |
License Date: 1993-01-07 | |
Spud Date: 1980-12-29 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-02-28 | |
Well Total Depth: 3615.00 ft | |
Configuration: Vertical | |
Latitude: 39.520000 | |
Longitude: -82.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1980-07-03 | 360 RELIANCE ENERGY INC GeoDate 7/3/80 |
Oil and Gas | 1980-07-03 | Issued Date 7/3/80 Expired Date Acres 0070000 Tool Type CT Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1980-12-29 | |
Completed | 1981-02-28 | |
Reached Total Depth | 1981-02-28 | |
Completion Report Received | 1981-04-29 | |
CO | 1993-01-07 | 360 RELIANCE ENERGY INC GeoDate 1/7/93 |
COMBINATION WELL | 1993-01-07 | Issued Date 1/7/93 Expired Date 1/7/94 Proposed Purpose OG Was Plug Supervised N Who Superivsed BY CO.Plug and Abandon Date 2/12/93 |
Plugged/Abandoned | 1993-02-12 | |
Construction Permit Expires | 1994-01-07 | |
Record Last Modified | 2013-03-14 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 84000 Gal | 20000 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | RELIANCE ENERGY INC | 332.00 | 562.00 | 0 |
1985 | RELIANCE ENERGY INC | 0.00 | 353.00 | 365 |
1986 | RELIANCE ENERGY INC | 0.00 | 226.00 | 365 |
1987 | RELIANCE ENERGY INC | 0.00 | 229.00 | 365 |
1988 | RELIANCE ENERGY INC | 0.00 | 238.00 | 365 |
1989 | RELIANCE ENERGY INC | 0.00 | 222.00 | 365 |
1990 | RELIANCE ENERGY INC | 0.00 | 175.00 | 365 |
1991 | RELIANCE ENERGY INC | 0.00 | 118.00 | 365 |
1992 | RELIANCE ENERGY INC | 0.00 | 123.00 | 365 |
1993 | RELIANCE ENERGY INC | 0.00 | 44.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | RELIANCE ENERGY INC | Brine | 0 | 0 |
1985 | RELIANCE ENERGY INC | Brine | 100 | 365 |
1986 | RELIANCE ENERGY INC | Brine | 60 | 365 |
1987 | RELIANCE ENERGY INC | Brine | 10 | 365 |
1988 | RELIANCE ENERGY INC | Brine | 14 | 365 |
1989 | RELIANCE ENERGY INC | Brine | 0 | 365 |
1990 | RELIANCE ENERGY INC | Brine | 0 | 365 |
1991 | RELIANCE ENERGY INC | Brine | 0 | 365 |
1992 | RELIANCE ENERGY INC | Brine | 0 | 365 |
1993 | RELIANCE ENERGY INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
iDIAN00172 | 1999-09-23 | Final Restoration | No Violations | |
iDIAN001726 | 1999-9-23 0:00: | FR | No Violations |
For data sources see[8]