34-073-23595

Well Details

Well ID: 34-073-23595
Loading map...
Country: United States
State: Ohio
County: Hocking
Municipality: Washington Township
Operator Name: HOCKING HILLS ENERGY AND WELL
Well Pad ID:
Farm/Lease Name: LEWIS # 1
License Status: Producing
License Date: 2010-07-14
Spud Date: 2010-08-30
Spud Drilling Contractor: G & L DRILLING
Final Drill Date: 2010-09-02
Well Total Depth: 4800.00 ft
Configuration: Vertical
Latitude: 39.480000
Longitude: -82.430000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-07-14 Proposed Formations:CLINTON THRU ROSE RUN, Issued Date:7/14/2010, Expired Date:7/13/2012 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-09-02
Construction Permit Expires 2011-07-13
Completion Report Received 2012-02-07
Change of Owner 2014-08-05 Operator changed from 8595, PDC ENERGY INC to 8416, LOGAN GAS INC
Change of Owner 2014-08-14 Operator changed from 8416, LOGAN GAS INC to 5755, HOCKING HILLS ENERGY WELL SERV
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-04-03 4462 4466 8
2012-04-03 4635 4637 4
2012-04-03 4568 4570 4
2688 2694 19
4438 4444 12
4450 4455 10
4462 4466 8
4606 4616 20
4568 4570 4
4635 4637 4
4641 4545 8
4651 4656 4
4664 4666 4
2688 2694 19
2012-04-03 4450 4455 10
2012-04-03 2688 2694 19
2012-04-03 4438 4444 12
2012-04-03 4651 4656 4
2012-04-03 4664 4666 4
2012-04-03 4641 4545 8
2012-04-03 4606 4616 20

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-09-30 ACID 15 500 Gal 0 Producers Service Corporation CIBP SET @4624 & BP SET @ 2780
2010-12-09 H2O 0 869 Bbl 50500 Producers Service Corporation CIBP SET @4624 & BP SET @ 2780
2010-11-11 ACID 15 1100 Gal 0 Producers Service Corporation CIBP SET @4624 & BP SET @ 2780
2011-03-16 H2O 15 3206 Bbl 80000 Producers Service Corporation CIBP SET @4624 & BP SET @ 2780

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 PDC ENERGY INC 643.00 1555.00 196
2012 PDC ENERGY INC 2495.00 1838.00 366
2014 HOCKING HILLS ENERGY AND WELL 630.00 284.00 365
2015 HOCKING HILLS ENERGY AND WELL 983.00 296.00 365
2016 HOCKING HILLS ENERGY AND WELL 100.00 67.00 365
2017 HOCKING HILLS ENERGY AND WELL 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 PDC ENERGY INC Brine 3870 196
2012 PDC ENERGY INC Brine 353 366
2014 HOCKING HILLS ENERGY AND WELL Brine 140 365
2015 HOCKING HILLS ENERGY AND WELL Brine 130 365
2016 HOCKING HILLS ENERGY AND WELL Brine 130 365
2017 HOCKING HILLS ENERGY AND WELL Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1904168706 2010-9-7 0:00:0 UD No Violations
-430723059 2010-10-7 0:00: UD No Violations
-432251135 2010-9-30 0:00: UD No Violations
-546483859 2010-11-10 0:00 UD No Violations 1.50
-641017901 2010-11-17 0:00 UD No Violations
0430723059 2010-10-07 Urban Drill / Deepen / Reopen No Violations Witnessed acid job. Second set of perforations and approximately 500 gal, 1/2 bbl a minute. Flowback through tubing into frac tank.
0432251135 2010-09-30 Urban Drill / Deepen / Reopen No Violations Checked on status of well. Mr. Dave Barry states that well was perforated yesterday with 4 shots from 4764 to 4766. Another zone if wet may be perforated in future just above this location. Witnessed acid treatment today. The anticipated pressure was 2500 psi. Although not substantial flowback to frac tank was observed. Note: A more accurate depth of DV tool set was obtained (2973).
0546483859 2010-11-10 Urban Drill / Deepen / Reopen No Violations An inspection revealed the perforation of three zones consisting of 2 shots per ft: 4438-4444; 4450-4455; and 4462-4466. 1000 gallon acid job tomorrow 1400-1500 psi.
0641017901 2010-11-17 Urban Drill / Deepen / Reopen No Violations An inspection revealed no activity at this time. No violations were noted.
1196018257 2010-08-18 Drill / Deepen / Reopen No Violations At the request of Petroleum Development Corporation (PDC), an inspection of the drilling pit was conducted. The blow pit has been dug and measured approx 32x10x15. A Logan Gas Employee (ie company partnership with PDC), Mr. Ray Sinclair states that they will be enlarging the depth of this pit. Recommended to Mr. Sinclair, to be aware of north wall stabilization, due to substantial decline on hillside. The mud pit will be dug today. Logs have been placed below the well location for soil stabilization. Silt fencing will also be installed later today per contractor. Well site is acceptable and no violations were noted.
1291120566 2010-11-29 Urban Drill / Deepen / Reopen No Violations An inspection revealed company preparing well site for frac job scheduled for 12/9/2010. All pits and tanks will be pumped/cleaned out.
1295996055 2010-12-09 Urban Drill / Deepen / Reopen No Violations Witnessed frac job.
1316439936 2011-09-13 Preliminary Restoration No Violations Restoration meets 1509.072 requirements. Well in operation at time of inspection.
1675651103 2013-06-21 Production Wells No Violations Production well inspection, this well consists of a pumping unit and 3-100 barrel tanks. No violations were noted.
1684308003 2010-07-21 Urban Drill / Deepen / Reopen No Violations A pre-site inspection was conducted with Mr. Jim Kilbarger and a representative from Petroleum Development Corp. The drilling permit was mistakenly issued prior to the pre-site inspection. During the inspection, it was noted that the well owner began building the location. The well owner and their partner, Mr. Jim Kilbarger have been instructed to cease all activity until the revised drilling permit has been issued. The overall location at this time is rural and does contain mature trees. The fencing and landscaping/screening requirement will be waived at this time. The representatives were informed that land development and/or vandalism, they shall agree to install fencing. If the lines are routed to separate property and additional equipment added, landscaping may be required. An access gate will be required for the entance into the well site located off SR 93. Best Management Practices were recommended. Although location is rural, temporary fencing will be required when no personnel are present.
1856365858 2010-10-05 Urban Drill / Deepen / Reopen No Violations An inspection revealed service rig pulling tubing. No violations were noted.
1891119578 2010-11-04 Urban Drill / Deepen / Reopen No Violations An inspection revealed service rig, but no activity at this time. The well was shut-in at time of the inspection. The well consisted of tubing, meter with chart and line routed to a flare. A PVC plug placed on bottom of 200 bbl horizontal tank (Frac tank style and not the flowback tank) contained a small leak. An earthen dike surrounds this tank therefore, no impact outside the dike. High Range Quantabs showed maximum unit of 10 ppm (mg/L)Cl-. Note: 8.8 units is equal to 6765 ppm. Notified well owner of inspection results by telephone following inspection.
1904168706 2010-09-07 Urban Drill / Deepen / Reopen No Violations Witnessed longstring job. Two stages were observed: Rose Run and Clinton. A DV Tool was set at approx 3000 per Mr. Jim Kilbarger.
1993663167 2011-01-26 UrbanPreliminary Restoration No Violations An inspection revealed drilling pits have not been abandoned. The fluid level and liner(s) in pits are acceptable and show no signs of leakage. Mr. Dave Barry with the Petroleum Development Corp. (PDC) has agreed to abandon these pits after winter weather conditions (ie recent snow & ice) have passed.
1998855681 2010-08-31 Drill / Deepen / Reopen No Violations Surface job and cementing.