Well ID: 34-073-61121 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Hocking | |
Municipality: Laurel Township | |
Operator Name: COLUMBIA GAS TRANSMISSION LLC | |
Well Pad ID: | |
Farm/Lease Name: MILLLER SIDNEY | |
License Status: Storage Well | |
License Date: 2019-05-21 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: 1911-07-01 | |
Well Total Depth: 2399.00 ft | |
Configuration: Vertical | |
Latitude: 39.490000 | |
Longitude: -82.600000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Completed | 1911-07-01 | |
Reached Total Depth | 1911-07-01 | |
APP | 2019-05-21 | Proposed Formations:CLINTON SANDSTONE, Issued Date:5/21/2019, Expired Date:5/20/2021 12:00:00 PM, Drilling unit acres:83, Proposed Well Type:SO, Proposed Well Class: |
Record Last Modified | 2019-05-28 | |
Construction Permit Expires | 2021-05-20 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-541647660 | 2019-10-17 0:00 | SO | No Violations | 1.30 |
-799746230 | 2019-4-26 0:00: | PB | No Violations | 0.30 |
0799746230 | 2019-04-26 | Plug / Plug Back | No Violations | Columbia Gas Transmission has set a steel plate over the well and surrounded the plate with concrete barriers. Columbia Gas Transmission has sent me a plugging plan that advises the Sidney #1 well will be plugged by 10/1/2019. I took two photos of the well location during the inspection. Time of inspection: 12:35 PM. Weather: 49 degrees F, Rain |
1051586799 | 2019-10-30 0:00 | PB | No Violations | 0.50 |
1554125604 | 2019-04-01 | Production Wells | No Violations | I arrived to this well at 8:20 AM to conduct an inspection on this well in regards to a phone call I received from Columbia Gas Transmission Engineer Devin Holter on 3/29/2019. Dan Talbot with Columbia Gas Transmission was present when I arrived. My inspection revealed that a sinkhole has opened up in a field within 140 feet of the location of this API permit number. The sinkhole was approximately 5 feet in diameter at ground level. The sinkhole tapered down to approximately 12 inches a few feet below ground level. I did not observe any casing in the hole. Dan Talbot ran a tape line down the well and reached approximately 200 feet in depth. CGT Engineer Devin Holter arrived during the inspection and showed me a record of the well. The well record did not indicate that the well was plugged properly with clay or cement. I advised Dan Talbot and Devin Holter during the inspection that the well shall be plugged according to OAC 1501:9-11. Dan Talbot informed me that they would barricade the well and place a steel plate over the hole until the well can be plugged. The well owner/operator shall submit a written plugging schedule to Brandon Mitchell at 5880 Memory Road Zanesville, Ohio 43701-9553 within 30 days, per ORC 1509:13(B)(7), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. Time of inspection: 8:20 AM. Weather: 31 degrees F, Sunny. |
1677116014 | 2020-10-29 0:00 | SO | No Violations | 0.30 |
1920086739 | 2019-11-6 0:00: | PB | No Violations | 0.10 |
2052299070 | 2019-10-18 0:00 | SO | No Violations | 0.50 |
466228228 | 2019-10-24 0:00 | CS | No Violations | 0.60 |
618883598 | 2019-11-22 0:00 | PB | No Violations | 0.20 |
For data sources see[3]