If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-62254 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.54,"lon":-82.26,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Hocking | |
Municipality: Ward Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: HOCKING VALLEY PRODUCTS CO | |
License Status: Producing | |
License Date: | |
Spud Date: 1900-01-01 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.540000 | |
Longitude: -82.260000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Change of Owner | 2001-05-31 | Operator changed from 1512, ALTIER H L SERVICE CO INC to 1634, NORTHWOOD ENERGY CORP |
Completion Report Received | 2004-11-29 | RE-WORK COMPLETION REPORT REC'D 11-29- |
Record Last Modified | 2017-02-15 | RE-WORK COMPLETION REPORT REC'D 11-29- |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1446 Bbl | 40000 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | NORTHWOOD ENERGY CORP | 0.00 | 29.00 | 365 |
2004 | NORTHWOOD ENERGY CORP | 0.00 | 0.00 | 0 |
2005 | NORTHWOOD ENERGY CORP | 0.00 | 215.00 | 365 |
2006 | NORTHWOOD ENERGY CORP | 0.00 | 0.00 | 0 |
2007 | NORTHWOOD ENERGY CORP | 0.00 | 0.00 | 0 |
2008 | NORTHWOOD ENERGY CORP | 0.00 | 0.00 | 0 |
2009 | NORTHWOOD ENERGY CORP | 0.00 | 0.00 | 0 |
2010 | NORTHWOOD ENERGY CORP | 0.00 | 0.00 | 0 |
2011 | NORTHWOOD ENERGY CORP | 0.00 | 676.00 | 0 |
2012 | NORTHWOOD ENERGY CORP | 0.00 | 519.00 | 366 |
2013 | NORTHWOOD ENERGY CORP | 0.00 | 338.00 | 365 |
2014 | NORTHWOOD ENERGY CORP | 0.00 | 201.00 | 365 |
2015 | NORTHWOOD ENERGY CORP | 0.00 | 227.00 | 365 |
2016 | NORTHWOOD ENERGY CORP | 0.00 | 188.00 | 365 |
2017 | NORTHWOOD ENERGY CORP | 0.00 | 186.00 | 365 |
2018 | NORTHWOOD ENERGY CORP | 0.00 | 124.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2004 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2005 | NORTHWOOD ENERGY CORP | Brine | 60 | 365 |
2006 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2007 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2008 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2009 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2010 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2011 | NORTHWOOD ENERGY CORP | Brine | 73 | |
2012 | NORTHWOOD ENERGY CORP | Brine | 17 | 366 |
2013 | NORTHWOOD ENERGY CORP | Brine | 117 | 365 |
2014 | NORTHWOOD ENERGY CORP | Brine | 10 | 365 |
2015 | NORTHWOOD ENERGY CORP | Brine | 18 | 365 |
2016 | NORTHWOOD ENERGY CORP | Brine | 7 | 365 |
2017 | NORTHWOOD ENERGY CORP | Brine | 9 | 365 |
2018 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1174103765 | 2013-2-20 0:00: | PW | No Violations | 11.00 |
-120027714 | 2013-2-21 0:00: | PW | No Violations | 3.00 |
-1483560797 | 2009-3-12 0:00: | PW | No Violations | |
-823682902 | 2014-5-28 0:00: | PW | No Violations | 1.00 |
-98701227 | 2018-6-25 0:00: | PW | No Violations | 0.20 |
0098701227 | 2018-06-25 | Production Wells | No Violations | My inspection revealed the well consists of a pumping unit and 1-100 barrel tank. The well was in operation during my inspection. |
0120027714 | 2013-02-21 | Production Wells | No Violations | I accompanied Kip Thompson on the clean up of this well. The flow line parted and oil escaped from the dike. Corp Energy was on the jobsite cleaning up the oil spill. |
0325018943 | 2013-03-20 | Production Wells | No Violations | I attended a meeting with OEPA and US Forest representatives. Mike Sharren represents OEPA, Gordon farley, Rich Jones and Tommy Thompson represent Wayne Nation forest. Mike Corp represents Northwood energy. OEPA has asked that a dike be built in the ditch that leads to the swamp. This dike would allow water to pass be retain any oil that may be remaining in the watershed. US Forest service will provide a gate that will be installed by Mike Corp. The US forest service will determine what seed will be used when the site is reclaimed. |
0451039762 | 2013-02-19 | Production Wells | Violations Noted | I received a call from Bill Arnholt with Northwoods energy. He informed me of a oil spill on this location, I arrived at 1:10 PM. I met Mike Corp on site to discuss the plan to clean up the spill. OEPA was contacted by Northwoods Energy.Gordon Farley with the US forest is on site as well as Mike Sharon who represents the OEPA. Mike Sharon has began to remove brush from the spill area to allow the oil to be gathered and collected. Mike Corp worked until dark removing oil from the swamp. Work will continue on 02/20/2013. |
0599885644 | 2003-01-24 | Production Wells | No Violations | No violations at this time. |
0660479080 | 2013-03-11 | Production Wells | No Violations | I inspected this to check on the progress of the oil spill. There is a small amount of oil in the swamp that need removed. I have called Mike Corp to inform him of the need to finish the clean up. I also instructed Mike to add a drain to the dike. |
0823682902 | 2014-05-28 | Production Wells | No Violations | Compliance notice follow up. The pollution and contamination has been cleaned up. This satisfies the compliance notice. |
1101694961 | 2012-03-15 | Production Wells | No Violations | I met with Mike Sherron from Ohio EPA. We met to check the progress of the cleanup. There are still items that need addressed. The is a meeting Wednesday 03/20/2013 with Ohio EPA, myself and Mike Corp to address the remaining deficiencies. |
1174103765 | 2013-02-20 | Production Wells | No Violations | Arrived on site 8:30 AM, met with Gordon Farley with US forest service. Mike Corp is also on location continuing to remove brush from the swamp in order to more easily remove the oil. |
1361477624 | 2013-02-21 | Production Wells | No Violations | Mike Corp is on site, OEPA representative Mike Sharon has cleared the swamp area. He has asked that the booms be left in place until the water warms and can be determined that no oil is remaining. Mike crop has cleaned the dike and dug the dike 12 deeper. They are now removing brush from the second spill site to vacillate removing the remainder of the oil and oil saturated material. |
1361803115 | 2012-02-25 | Production Wells | No Violations | Status check to check the progress of the oil spill clean up. New dike has been finished, new steel flow line from well to tank has been installed. There are two items to finish before I will sign off on this clean up. Scott courter is on site, he is cleaning up the oil at the well head and removing brush and excess soil that has been contaminated with oil. I will check the site for compliance on 02/26/2013. |
1362498813 | 2013-03-05 | Production Wells | No Violations | Status well inspection, I inspected this site to check on the cleanup from the oil spill on 02/19/2013.There is a small amount of oil remaining, this has been treated with peatsorb. I have instructed Mike Corp to remove all of the oil saturated peatsorb. |
1364230193 | 2013-03-25 | Production Wells | No Violations | Site inspection to check the oil spill clean up progress. All of the pads and the booms have been removed from the swamp area. There has been a oil retention dike built to trap any oil they may remain upstream of the swamp. Final restoration will be done when weather allows. |
1483560797 | 2009-03-12 | Production Wells | No Violations | No violations were noted. |
1620032936 | 2013-05-30 | Production Wells | No Violations | Production well inspection, this well consists of a pumping unit and 1-100 barrel tank. There is a dike built around the well head, it is holding water. I called Mike Corp to remove the water. |
2128774182 | 2005-06-21 | Production Wells | No Violations | No violations. |
325018943 | 2013-3-20 0:00: | PW | No Violations | 5.00 |
451039762 | 2013-2-19 0:00: | PW | No Violations | 13.00 |
599885644 | 2003-1-24 0:00: | PW | No Violations | |
660479080 | 2013-3-11 0:00: | PW | No Violations | 3.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0451039762 | US-OH-124883 | 2018-03-05 | 9-1-07 | Well operation causing pollution and contamination |
0451039762 | US-OH-124884 | 2018-03-05 | 9-9-05(A)1 | Well insufficiently equipped to prevent escape of oil and gas |
0451039762 | US-OH-124885 | 2018-03-05 | 9-9-05(A)9 | No SPCC dike/or failure to keep dike free of water or oil |
0451039762 | US-OH-124886 | 2018-03-05 | NONE(B) | Dike or pit not able to prevent escape of brine or other wastes |
0451039762 | US-OH-124887 | 2018-03-05 | NONE[C] | Failure to keep dike or pit free of brine or other wastes |
For data sources see[8]