If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-075-22143 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.66,"lon":-81.74,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Paint Township | |
Operator Name: TROYER NELSON A | |
Well Pad ID: | |
Farm/Lease Name: TROYER NELSON A | |
License Status: Domestic Well | |
License Date: 1978-12-22 | |
Spud Date: 1979-03-17 | |
Spud Drilling Contractor: | |
Final Drill Date: 1979-07-21 | |
Well Total Depth: 4186.00 ft | |
Configuration: Vertical | |
Latitude: 40.660000 | |
Longitude: -81.740000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-12-22 | 254 EDCO DRILLING & PRODUCING GeoDate 12/22/78 |
Original Spud | 1979-03-17 | R.L. 1-24-79 |
Completed | 1979-07-21 | R.L. 1-24-79 |
Reached Total Depth | 1979-07-21 | R.L. 1-24-79 |
CO | 1992-02-28 | 4143 TROYER NELSON A GeoDate 12/22/78 |
Record Last Modified | 2009-12-11 | R.L. 1-24-79 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4017 | 4097 | 15 |
4017 | 4097 | 15 | |
4017 | 4097 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1600 Bbl | 25000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | EDCO DRILLING & PRODUCING | 1161.00 | 0.00 | 0 |
1985 | EDCO DRILLING & PRODUCING | 1128.00 | 0.00 | 153 |
1986 | EDCO DRILLING & PRODUCING | 194.00 | 0.00 | 214 |
1987 | EDCO DRILLING & PRODUCING | 623.00 | 0.00 | 214 |
1988 | EDCO DRILLING & PRODUCING | 936.00 | 0.00 | 274 |
1989 | EDCO DRILLING & PRODUCING | 415.00 | 0.00 | 365 |
1990 | EDCO DRILLING & PRODUCING | 242.00 | 0.00 | 365 |
1991 | EDCO DRILLING & PRODUCING | 122.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | EDCO DRILLING & PRODUCING | Brine | 0 | 0 |
1985 | EDCO DRILLING & PRODUCING | Brine | 40 | 153 |
1986 | EDCO DRILLING & PRODUCING | Brine | 30 | 214 |
1987 | EDCO DRILLING & PRODUCING | Brine | 30 | 214 |
1988 | EDCO DRILLING & PRODUCING | Brine | 0 | 274 |
1989 | EDCO DRILLING & PRODUCING | Brine | 0 | 365 |
1990 | EDCO DRILLING & PRODUCING | Brine | 40 | 365 |
1991 | EDCO DRILLING & PRODUCING | Brine | 0 | 365 |