If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-075-24889 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.51,"lon":-81.84,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Holmes | |
| Municipality: Mechanic Township | |
| Operator Name: MASON PRODUCING INC | |
| Well Pad ID: | |
| Farm/Lease Name: JOHN RABER | |
| License Status: Final Restoration | |
| License Date: 2018-05-10 | |
| Spud Date: 1990-02-20 | |
| Spud Drilling Contractor: G & H DRLG | |
| Final Drill Date: 1990-02-24 | |
| Well Total Depth: 6052.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.510000 | |
| Longitude: -81.840000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1990-01-29 | Issued Date 1/29/90 Expired Date 1/29/91 Acres 0040000 Tool Type RTAF Proposed Formation COPPER RIDGE Proposed Depth 06052 Proposed Drill Depth 06052 |
| Original Spud | 1990-02-21 | UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES. |
| Completed | 1990-02-24 | UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES. |
| Reached Total Depth | 1990-02-24 | UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES. |
| CO | 1990-04-09 | 1983 MASON DRILLING INC GeoDate 1/29/90 |
| Completion Report Received | 1990-06-11 | UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES. |
| Change of Owner | 2002-12-30 | Operator changed from 1983, MASON DRILLING INC to 7333, MASON PRODUCING |
| APP | 2018-05-10 | Proposed Formations:ROSE RUN, Issued Date:5/10/2018, Expired Date:5/9/2020 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2018-07-25 | UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES. |
| Record Last Modified | 2019-05-10 | UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES. |
| Construction Permit Expires | 2020-05-09 | UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES. |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 6038 | 0 | |
| 6038 | 0 | ||
| 6038 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 0 | 0 | 0 | NATURAL PRODUCER |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1990 | MASON DRILLING INC | 37606.00 | 1262.00 | 365 |
| 1991 | MASON DRILLING INC | 30146.00 | 2087.00 | 365 |
| 1992 | MASON DRILLING INC | 47551.00 | 2074.00 | 365 |
| 1993 | MASON DRILLING INC | 24275.00 | 1041.00 | 365 |
| 1994 | MASON DRILLING INC | 19980.00 | 755.00 | 365 |
| 1995 | MASON DRILLING INC | 16052.00 | 535.00 | 365 |
| 1996 | MASON DRILLING INC | 10807.00 | 249.00 | 365 |
| 1997 | MASON DRILLING INC | 12531.00 | 387.00 | 365 |
| 1998 | MASON DRILLING INC | 11315.00 | 168.00 | 365 |
| 1999 | MASON DRILLING INC | 10628.00 | 218.00 | 365 |
| 2000 | MASON DRILLING INC | 7517.00 | 130.00 | 0 |
| 2001 | MASON DRILLING INC | 5914.00 | 63.00 | 365 |
| 2002 | MASON PRODUCING INC | 401.00 | 0.00 | 31 |
| 2003 | MASON DRILLING INC | 0.00 | 0.00 | 365 |
| 2004 | MASON PRODUCING INC | 2852.00 | 0.00 | 365 |
| 2005 | MASON PRODUCING INC | 1938.00 | 77.00 | 365 |
| 2006 | MASON PRODUCING INC | 1686.00 | 0.00 | 365 |
| 2007 | MASON PRODUCING INC | 1390.00 | 0.00 | 365 |
| 2008 | MASON PRODUCING INC | 1282.00 | 0.00 | 366 |
| 2009 | MASON PRODUCING INC | 1266.00 | 0.00 | 365 |
| 2010 | MASON PRODUCING INC | 1162.00 | 73.00 | 365 |
| 2011 | MASON PRODUCING INC | 893.00 | 0.00 | 365 |
| 2012 | MASON PRODUCING INC | 860.00 | 0.00 | 366 |
| 2013 | MASON PRODUCING INC | 321.00 | 57.00 | 365 |
| 2014 | MASON PRODUCING INC | 172.00 | 22.00 | 365 |
| 2015 | MASON PRODUCING INC | 0.00 | 0.00 | 365 |
| 2016 | MASON PRODUCING INC | 62.00 | 0.00 | 365 |
| 2017 | MASON PRODUCING INC | 0.00 | 0.00 | 365 |
| 2018 | MASON PRODUCING INC | 0.00 | 0.00 | 206 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1990 | MASON DRILLING INC | Brine | 0 | 365 |
| 1991 | MASON DRILLING INC | Brine | 0 | 365 |
| 1992 | MASON DRILLING INC | Brine | 0 | 365 |
| 1993 | MASON DRILLING INC | Brine | 0 | 365 |
| 1994 | MASON DRILLING INC | Brine | 0 | 365 |
| 1995 | MASON DRILLING INC | Brine | 0 | 365 |
| 1996 | MASON DRILLING INC | Brine | 0 | 365 |
| 1997 | MASON DRILLING INC | Brine | 2 | 365 |
| 1998 | MASON DRILLING INC | Brine | 2 | 365 |
| 1999 | MASON DRILLING INC | Brine | 25 | 365 |
| 2000 | MASON DRILLING INC | Brine | 13 | |
| 2001 | MASON DRILLING INC | Brine | 85 | 365 |
| 2002 | MASON DRILLING INC | Brine | 1 | 334 |
| 2003 | MASON DRILLING INC | Brine | 0 | 365 |
| 2004 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2005 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2006 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2007 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2008 | MASON PRODUCING INC | Brine | 0 | 366 |
| 2009 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2010 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2011 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2012 | MASON PRODUCING INC | Brine | 0 | 366 |
| 2013 | MASON PRODUCING INC | Brine | 10 | 365 |
| 2014 | MASON PRODUCING INC | Brine | 270 | 365 |
| 2015 | MASON PRODUCING INC | Brine | 140 | 365 |
| 2016 | MASON PRODUCING INC | Brine | 181 | 365 |
| 2017 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2018 | MASON PRODUCING INC | Brine | 0 | 206 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -14860666 | 2018-7-23 0:00: | PB | No Violations | 4.50 |
| -1775144119 | 2012-3-5 0:00:0 | PW | No Violations | |
| -388113007 | 2015-9-1 0:00:0 | PW | No Violations | |
| 000PL14999 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 0014860666 | 2018-07-23 | Plug / Plug Back | No Violations | Upon arrival on location I found the rig crew running 2 3/8 inch diameter tubing into the wellbore. It was run to a depth of 6038 feet. A 430 foot plug was set using 30 sack of class A cement with 2% gel. The cement was displaced with 20 bbl. of fresh water. The 2 3/8 inch tubing was then pulled out of the wellbore. |
| 0388113007 | 2015-09-01 | Production Wells | No Violations | A pump jack has been put on this well. There were no problems noted at the time of the inspection. |
| 1121181306 | 2018-05-30 | Production Wells | No Violations | On the day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing 2 3/8 inch diameter tubing, the pumping unit and the production equipment has been removed. A plugging permit has been received and is scheduled to be done. |
| 1389095366 | 2014-01-06 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
| 1532109236 | 2018-07-20 | Plug / Plug Back | No Violations | Upon arrival on location I found the had moved on location and was pulling the and tubing. The 2 3/8 tubing will be ran back into the wellbore and the bottom cement plug will be set |
| 1532434128 | 2018-07-24 | Production Wells | No Violations | Upon arrival on location I found the rig crew had removed the 2 3/8 inch diameter tubing from the wellbore. Plugging will continue on Wednesday 7/25/2018. |
| 1532543453 | 2018-07-25 | Plug / Plug Back | No Violations | Upon arrival on location I found the rig crew had tagged the top of the cement at 5720 feet. The 4 1/2-inch diameter casing was ripped at a depth of 4003 feet. The casing was the pulled to a depth of 3920 feet. Circulation was established and set a 177-foot cement plug using 50 sacks of class A cement with 2% gel and displaced with 59 bbl. of fresh water. The 4 1/2-inch diameter casing was then pulled to a depth of 2671 foot. Circulation was established, and a 170-foot cement plug was set using 45 sacks of class A cement with 2% gel and displaced with 40 bbl. of fresh water. The 4 1/2-inch diameter casing was then pulled to a depth of 1025. Circulation was established, and a 155-foot plug was set using 40 sacks of class A cement with 2% gel and displaced with 14 bbl. of fresh water. The 4 1/2-inch diameter casing was then pulled to a depth of 683 feet. Circulation was established, and a 200-foot cement plug was set using 50 sacks of class A cement and displaced using 8 bbl. of fresh water. The 4 1/2-inch diameter casing was then pulled to a depth of 150 feet. Circulation was established, and a 150-foot cement plug was set using 50 sacks of class A cement, and we had circulated good cement returns to surface. |
| 1537446508 | 2018-09-20 | Final Restoration | No Violations | On the day of my inspection, I found that the final restoration has been completed. The site passed final restoration per ORC 1509.072 (B). |
| 1775144119 | 2012-03-05 | Production Wells | No Violations | This producing well is equipped with a plunger lift system, there were no problems noted. |
| 1823479888 | 2017-01-13 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
| PL14999 | PL | No Violations |
For data sources see[9]