If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-075-25051 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.58,"lon":-81.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Hardy Township | |
Operator Name: CAPSTONE OIL PRODUCING LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHLABACH JY | |
License Status: Producing | |
License Date: 1992-06-08 | |
Spud Date: 1992-06-22 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 1992-07-02 | |
Well Total Depth: 5910.00 ft | |
Configuration: Vertical | |
Latitude: 40.580000 | |
Longitude: -81.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1992-06-08 | Issued Date 6/8/92 Expired Date 6/8/93 Acres 0040000 Tool Type RTAF Proposed Formation ROSE RUN Proposed Depth 05910 Proposed Drill Depth 05910 |
Completed | 1992-07-02 | |
Reached Total Depth | 1992-07-02 | |
CO | 1992-09-03 | 2772 HILL DRILLING INC GeoDate 6/8/92 |
Completion Report Received | 1993-05-19 | |
Construction Permit Expires | 1993-06-08 | |
Original Spud | 1993-06-22 | |
Change of Owner | 1997-06-24 | Operator changed from 73, HOOVER FRANK W PRODUCER to 627, KENOIL |
Change of Owner | 2018-06-29 | Operator changed from 627, KENOIL LLC to 9349, CAPSTONE OIL PRODUCING LLC |
Record Last Modified | 2018-06-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5648 | 5735 | 94 |
5648 | 5735 | 94 | |
5648 | 5735 | 94 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 2700 Gal | 0 | ACIDIZED W/2700 GAL |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | HILL WILLIAM F | 36935.00 | 2700.00 | 365 |
1994 | HILL DRILLING INC | 6198.00 | 753.00 | 365 |
1995 | HILL DRILLING INC | 15907.00 | 920.00 | 365 |
1996 | HILL DRILLING INC | 15550.00 | 570.00 | 365 |
1997 | KENOIL LLC | 2090.00 | 139.00 | 365 |
1998 | HOOVER FRANK W DBA CHEROKEE DR | 3554.00 | 56.00 | 28 |
1999 | KENOIL LLC | 1602.00 | 172.00 | 0 |
2000 | KENOIL LLC | 2597.00 | 168.00 | 365 |
2001 | KENOIL LLC | 0.00 | 0.00 | 365 |
2002 | KENOIL LLC | 1276.00 | 111.00 | 365 |
2003 | KENOIL LLC | 1222.00 | 86.00 | 365 |
2004 | KENOIL LLC | 1223.00 | 80.00 | 365 |
2005 | KENOIL LLC | 973.00 | 135.00 | 365 |
2006 | KENOIL LLC | 989.00 | 110.00 | 365 |
2007 | KENOIL LLC | 813.00 | 69.00 | 365 |
2008 | KENOIL LLC | 992.00 | 85.00 | 365 |
2009 | KENOIL LLC | 874.00 | 81.00 | 365 |
2010 | KENOIL LLC | 547.00 | 55.00 | 365 |
2011 | KENOIL LLC | 632.00 | 85.00 | 0 |
2012 | KENOIL LLC | 523.00 | 57.00 | 366 |
2013 | KENOIL LLC | 387.00 | 56.00 | 365 |
2014 | KENOIL LLC | 267.00 | 65.00 | 365 |
2015 | KENOIL LLC | 252.00 | 52.00 | 365 |
2016 | KENOIL LLC | 295.00 | 35.00 | 365 |
2017 | KENOIL LLC | 354.00 | 0.00 | 365 |
2018 | KENOIL LLC | 169.00 | 44.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | HILL WILLIAM F | Brine | 3255 | 365 |
1994 | HILL DRILLING INC | Brine | 326 | 365 |
1995 | HILL DRILLING INC | Brine | 230 | 365 |
1996 | HILL DRILLING INC | Brine | 0 | 365 |
1997 | KENOIL LLC | Brine | 117 | 365 |
1998 | HOOVER FRANK W DBA CHEROKEE DR | Brine | 0 | 28 |
1999 | KENOIL LLC | Brine | 58 | |
2000 | KENOIL LLC | Brine | 114 | 365 |
2001 | KENOIL LLC | Brine | 0 | 365 |
2002 | KENOIL LLC | Brine | 67 | 365 |
2003 | KENOIL LLC | Brine | 26 | 365 |
2004 | KENOIL LLC | Brine | 62 | 365 |
2005 | KENOIL LLC | Brine | 39 | 365 |
2006 | KENOIL LLC | Brine | 86 | 365 |
2007 | KENOIL LLC | Brine | 92 | 365 |
2008 | KENOIL LLC | Brine | 79 | 365 |
2009 | KENOIL LLC | Brine | 49 | 365 |
2010 | KENOIL LLC | Brine | 80 | 365 |
2011 | KENOIL LLC | Brine | 80 | |
2012 | KENOIL LLC | Brine | 79 | 366 |
2013 | KENOIL LLC | Brine | 56 | 365 |
2014 | KENOIL LLC | Brine | 27 | 365 |
2015 | KENOIL LLC | Brine | 66 | 365 |
2016 | KENOIL LLC | Brine | 57 | 365 |
2017 | KENOIL LLC | Brine | 12 | 365 |
2018 | KENOIL LLC | Brine | 30 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1624411124 | 2019-11-13 0:00 | PW | No Violations | 0.30 |
-177509321 | 2015-8-3 0:00:0 | PW | No Violations | |
0000013996 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 4/13/93 INSPECTOR JOHN BUREN DATE 04/1319/93 DATA FROM OLD VAX INFO | |
0133193807 | 2017-05-18 | Production Wells | No Violations | This is a producing pumpjack well. There were no problems noted at the time of the inspection. |
0177509321 | 2015-08-03 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection |
0213475630 | 2016-06-17 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
1078156068 | 2019-04-11 | Production Wells | No Violations | On the day of my inspection I found an 8 5/8-inch diameter casing, a 4 1/2-inch diameter casing, and 2 3/8-inch diameter tubing, operated by a pumping unit with a gas motor. The production equipment is made up of one 210 bbl. steel tank, a horizontal separator, one 50 bbl. steel tank, and a rotary meter. The tank is properly identified, and production reporting is up to date. The dike area is shared with other wells |
133193807 | 2017-5-18 0:00: | PW | No Violations | |
13996 | PL | No Violations | ||
1601909967 | 2020-10-5 0:00: | PW | No Violations | 0.30 |
213475630 | 2016-6-17 0:00: | PW | No Violations | |
233667490 | 2019-8-2 0:00:0 | PW | No Violations | 0.50 |
For data sources see[9]