If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-075-25583 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.56,"lon":-81.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Hardy Township | |
Operator Name: BANDS GROUP LLC | |
Well Pad ID: | |
Farm/Lease Name: ERB UNIT | |
License Status: Producing | |
License Date: 2011-04-12 | |
Spud Date: 2011-06-18 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2011-06-30 | |
Well Total Depth: 5654.00 ft | |
Configuration: Vertical | |
Latitude: 40.560000 | |
Longitude: -81.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-04-12 | Proposed Formations:KNOX, Issued Date:4/12/2011, Expired Date:4/11/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-06-30 | |
Completion Report Received | 2011-08-22 | |
Construction Permit Expires | 2012-04-11 | |
Change of Owner | 2015-01-01 | Operator changed from 30, BANDS CO INC to 9384, BANDS GROUP LLC |
Record Last Modified | 2018-01-30 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-11-23 | 5517 | 5580 | 37 |
5517 | 5580 | 37 | |
5517 | 5580 | 37 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-08-03 | ACID | 15 | 2500 Gal | 0 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BANDS COMPANY INC | 41542.00 | 708.00 | 150 |
2012 | BANDS COMPANY INC | 169011.00 | 2187.00 | 366 |
2013 | BANDS COMPANY INC | 170540.00 | 2183.00 | 365 |
2014 | BANDS COMPANY INC | 187580.00 | 2026.00 | 365 |
2015 | BANDS GROUP LLC | 160037.00 | 1304.00 | 365 |
2016 | BANDS GROUP LLC | 146130.00 | 1044.00 | 365 |
2017 | BANDS GROUP LLC | 165945.00 | 708.00 | 365 |
2018 | BANDS GROUP LLC | 73969.00 | 447.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BANDS COMPANY INC | Brine | 0 | 150 |
2012 | BANDS COMPANY INC | Brine | 0 | 366 |
2013 | BANDS COMPANY INC | Brine | 0 | 365 |
2014 | BANDS COMPANY INC | Brine | 0 | 365 |
2015 | BANDS GROUP LLC | Brine | 0 | 365 |
2016 | BANDS GROUP LLC | Brine | 0 | 365 |
2017 | BANDS GROUP LLC | Brine | 0 | 365 |
2018 | BANDS GROUP LLC | Brine | 14 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1110354924 | 2011-6-3 0:00:0 | DD | No Violations | |
-1163075294 | 2011-7-5 0:00:0 | DD | No Violations | |
-1209595846 | 2011-6-30 0:00: | UP | No Violations | 3.00 |
-1478305045 | 2011-6-27 0:00: | DD | No Violations | |
-1808158289 | 2011-6-9 0:00:0 | DD | No Violations | |
-1838868300 | 2015-7-30 0:00: | PW | No Violations | |
-1848750311 | 2015-8-3 0:00:0 | PW | No Violations | |
-2020059245 | 2016-7-6 0:00:0 | PW | No Violations | |
-2032335316 | 2011-7-20 0:00: | DD | No Violations | |
-592893495 | 2015-7-28 0:00: | PW | No Violations | |
-966302447 | 2011-6-20 0:00: | DD | No Violations | |
0038523563 | 2011-06-13 | Drill / Deepen / Reopen | No Violations | Cutting location. Silt fence to be set today. Signage to be placed today. |
0173742643 | 2014-06-11 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
0484570607 | 2011-06-23 | Drill / Deepen / Reopen | No Violations | Drilling ahead on fluid at 2393. |
0592893495 | 2015-07-28 | Production Wells | No Violations | An operator of Cobra pipeline shut the sales line in w/o notifying the Producer. The well was feeding on line at the time and the pressure blew a lineof the motor valve inside the production unit and the gas caught fire and burned up the unit. The Millersburg FD put out the fire with foam. There are 2 bbls of oil inside the dike around the production unit. Nothing got outside the dike. A vacuum truck is on the way to suck out the dike and roustabouts are on standby to clean up the residuals . |
0616704041 | 2019-05-01 | Production Wells | No Violations | On the day of my inspection I found an 8 5/8-inch diameter casing, a 4 1/2-inch diameter casing, and 2 3/8-inch diameter tubing and rods. The well is operated by a pumping unit with an electric motor. The production equipment is made up of one 210 bbl. steel tank, a production separator, a vertical separator, and a rotary meter. The tank is properly identified. The production reporting is up to date. |
0966302447 | 2011-06-20 | Drill / Deepen / Reopen | No Violations | Ran 14 joints of 8-5/8 23# R-3 casing 588 set at 598. Petroset cemented with 220 sx regular Class A with 3% caCl2. 10 bbl of good cement returned to surface. Plug down at 11:45 AM. See casing ticket for more information. |
0969048981 | 2013-01-14 | UrbanPreliminary Restoration | No Violations | There is good grass growth. All fences are in place and the gates locked. This is a producing pump jack well. There were no problems noted at the time of the inspection. Urban preliminary Restoration has passed. |
1060294513 | 2011-05-24 | Drill / Deepen / Reopen | No Violations | Urban location. Met with Brett Smith to make sure we were all on same page with placement of drilling equipment and safety fences etc. |
1110354924 | 2011-06-03 | Drill / Deepen / Reopen | No Violations | Waiting on loggers to cut trees. |
1163075294 | 2011-07-05 | Drill / Deepen / Reopen | No Violations | Reserve pit emptied and closed. Floccing working pit. |
1209595846 | 2011-06-30 | UrbanProduction Wells | No Violations | Maric Drilling set 4.5 casing at 5548 ft . Total depth of well at 5550. |
1308221937 | 2011-06-15 | Urban Drill / Deepen / Reopen | No Violations | All silt fence in place and location fenced. |
1309970132 | 2011-06-28 | Drill / Deepen / Reopen | No Violations | Drilling ahead on fluid at 5116 in the Utica shale. |
1310409131 | 2011-07-11 | Drill / Deepen / Reopen | No Violations | Working pit emptied. No service rig yet. |
1311015170 | 2011-07-18 | Drill / Deepen / Reopen | No Violations | Seting tank Battery. Waiting on power before acidizing. |
1312396723 | 2011-08-03 | Drill / Deepen / Reopen | No Violations | Acidized with 2500 gallons of 15% acid. BDP 1300psi. 2.1 BPM at 1300 psi. ISIP 650 psi |
1312540043 | 2011-08-04 | Preliminary Restoration | No Violations | Well is producing. Working on putting the location back. |
1314643782 | 2011-08-29 | Preliminary Restoration | No Violations | Final grade not yet hydro-seeded. |
1318336569 | 2011-10-11 | UrbanPreliminary Restoration | No Violations | Final grade completed and location has been seeded and mulched. Fences have been erected around pumping unit, production unit, and tank battery. All gates locked and signs in place. |
1319539562 | 2011-10-24 | Preliminary Restoration | No Violations | Grasses growing and should hold upduring winter. Will check back in spring. Well is producing, signs are in place, fences are up and the gates are locked. |
1351706282 | 2011-06-14 | Drill / Deepen / Reopen | No Violations | Pits cut and lined, some water added to hold them. Fence put up around location. Warning signs up. Silt fence in place. |
1438253944 | 2015-07-29 | Production Wells | No Violations | Checked the status of the clean up from the aftermath of the production unit fire. The oil and water have been removed from inside the dike and the residuals have been soaked up with peat sorb. The fire actually was the result of a failed insulated union. The pop-off was set for 500 psig and the well shut down was set for 300 psig. The well shut down worked but the insulted union on the up stream side of the motor valve failed causing the fire. |
1476451626 | 2011-08-02 | Drill / Deepen / Reopen | No Violations | Bond log showed cement top at 4875. Good bond through and above perforated interval. First perforation run did not fire. |
1478305045 | 2011-06-27 | Drill / Deepen / Reopen | No Violations | Drilling ahead on fluid at 4638 in Utica shale. |
1493034481 | 2017-04-21 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
1538567150 | 2018-10-03 | Production Wells | No Violations | On the day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, and 2 3/8 inch diameter tubing and rods. The well is operated by a pumping unit with an electric motor. The production equipment is made up of one 210 bbl. steel tank, a production separator, a vertical separator, and a rotary meter. The tank is properly identified. The production reporting is up to date. |
1566991752 | 2019-8-29 0:00: | PW | No Violations | 0.50 |
1577104979 | 2019-12-23 0:00 | PW | No Violations | 0.30 |
1579893578 | 2020-1-24 0:00: | PW | No Violations | 0.50 |
1719358061 | 2011-09-26 | Preliminary Restoration | No Violations | Well is to final grade (and has been) but unable to seed and mulch due to unusally heavy rain over last several weeks. |
173742643 | 2014-6-11 0:00: | PW | No Violations | |
1808158289 | 2011-06-09 | Drill / Deepen / Reopen | No Violations | Met tool pusher on location. Waiting on loggers to remove trees so he can start cutting location. |
1838868300 | 2015-07-30 | Production Wells | No Violations | They are setting and plumbing in a new production unit to replace the one that burned. The old unit is out of the dike and the new oneis in. They are filling the reservoir with 50/50 water/antifreeze. |
1848750311 | 2015-08-03 | Production Wells | No Violations | The production unit has been replaced and plumbed in and the well is back on line after the production unit fire. |
2020059245 | 2016-07-06 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
2032335316 | 2011-07-20 | Drill / Deepen / Reopen | No Violations | Tank battery set. Waiting on electic drop. |
38523563 | 2011-6-13 0:00: | DD | No Violations | |
466744042 | 2020-8-11 0:00: | PW | No Violations | 0.30 |
484570607 | 2011-6-23 0:00: | DD | No Violations | |
616704041 | 2019-5-1 0:00:0 | PW | No Violations | 0.50 |
969048981 | 2013-1-14 0:00: | UL | No Violations |
For data sources see[9]