X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-075-25598

Well Details

Well ID: 34-075-25598
Loading map...
Country: United States
State: Ohio
County: Holmes
Municipality: Hardy Township
Operator Name: W H PATTEN DRILLING CO
Well Pad ID:
Farm/Lease Name: YOUNG
License Status: Producing
License Date: 2013-05-03
Spud Date: 2013-10-03
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2013-10-17
Well Total Depth: 5670.00 ft
Configuration: Vertical
Latitude: 40.570000
Longitude: -81.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-03 Proposed Formations:Knox, Issued Date:5/3/2013, Expired Date:5/3/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-10-17
Correction to Well 2013-10-25 CHANGE IN PROPOSED GEOLOGICAL FORMATION
Completion Report Received 2014-02-12
Construction Permit Expires 2015-05-03
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-02-14 5581 5598 17
2014-02-14 5548 5576 32
5548 5576 32
5581 5598 17
5548 5576 32

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-11-19 ACID 0 3200 Gal 0 Producers Service Corporation Displaced acid to perfs with 955 gallons of water.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 W H PATTEN DRILLING CO 5649.00 0.00 82
2014 W H PATTEN DRILLING CO 82206.00 580.00 365
2015 W H PATTEN DRILLING CO 80799.00 404.00 365
2016 W H PATTEN DRILLING CO 80833.00 421.00 365
2017 W H PATTEN DRILLING CO 65081.00 212.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 W H PATTEN DRILLING CO Brine 380 82
2014 W H PATTEN DRILLING CO Brine 1689 365
2015 W H PATTEN DRILLING CO Brine 1085 365
2016 W H PATTEN DRILLING CO Brine 1675 365
2017 W H PATTEN DRILLING CO Brine 1730 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1198330930 2013-10-9 0:00: DD No Violations
-1214046164 2013-10-1 0:00: DD No Violations
-1249828167 2013-9-9 0:00:0 DD No Violations
-1349520076 2016-4-13 0:00: PW No Violations
-1507242005 2013-10-5 0:00: DD No Violations
-231408965 2013-10-29 0:00 PL No Violations
-243242951 2013-7-8 0:00:0 DD No Violations
-580894349 2013-10-17 0:00 DD No Violations
-766382589 2013-8-29 0:00: DD No Violations
0192178530 2013-09-26 Drill / Deepen / Reopen No Violations The trees have been removed. The drilling company is cutting location.
0231408965 2013-10-29 Preliminary Restoration No Violations The pits have been closed and the location has been put back to rough grade. The tank site has been cut and the flow and sales lines are in to the tank site.
0243242951 2013-07-08 Drill / Deepen / Reopen No Violations Location cutting on hold due to heavy rain.
0438191789 2015-03-02 Production Wells No Violations This is a producing plunger lift well. There were no problems noted at the time of the inspection.
0501665914 2013-10-17 Drill / Deepen / Reopen No Violations Reached total depth of 5670. There was a good gas show encountered in the Rose Run. Pulling out of the hole with the drill pipe. Electric logging scheduled for 10:30 AM. Unless the log suggests otherwise, production casing will be run in this well.
0580894349 2013-10-17 Drill / Deepen / Reopen No Violations Ran 130 joints of 4.5 10.5 # casing and 4 pup joints to 5654. Universal cemented with 125 sacks of Rose Run cement. Plug down at 10:45 PM. The plug was bumped up 500 psig and the pipe was tested for 5 minutes with no drop off. See the casing ticket for details.
0626889137 2017-07-11 Production Wells No Violations This is a producing plunger lift well. There were no problems noted at the time of the inspection.
0653662566 2013-10-03 Drill / Deepen / Reopen No Violations Spud at 6:00 AM. Drilling ahead at 117 in the shale.
0766382589 2013-08-29 Drill / Deepen / Reopen No Violations They continue to get the location ready for drilling.
1017928153 2013-11-19 Drill / Deepen / Reopen No Violations Producers performed an acid job with 3000 gallons of IC acid. See the Stimulation Report for details.
1133438324 2013-10-30 Preliminary Restoration No Violations The location is to rough grade. The pits have been emptied and closed. No topsoil has yet been spread.
1198330930 2013-10-09 Drill / Deepen / Reopen No Violations drilling ahead at 3185 on fluid just above the packer shell.
1214046164 2013-10-01 Drill / Deepen / Reopen No Violations Digging and lining the pits and rigging up.
1249828167 2013-09-09 Drill / Deepen / Reopen No Violations The trees have been removed from the location and it is ready to be leveled.
1349520076 2016-04-13 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection. The well was pumping at the time of the inspection.
1375180224 2013-07-26 Drill / Deepen / Reopen No Violations They are still working on cutting the location.
1382098028 2013-10-16 Drill / Deepen / Reopen No Violations Drilling ahead at 5540 just above the Rose Run.
1384860369 2013-11-18 Drill / Deepen / Reopen No Violations Baker-Hughes ran a bond log and perforated. The bond had the required 500 above the producing horizon. The cement top was 4958. The perforations are from 5548 to 5576.
1467662085 2013-09-30 Drill / Deepen / Reopen No Violations The pits are being dug and the rig is moving on and rigging up.
1507242005 2013-10-05 Drill / Deepen / Reopen No Violations The 8-5/8 intermediate string was set and cemented this date. See the casing ticket for the details.
1580947125 2013-10-04 Drill / Deepen / Reopen No Violations Ran and cemented the 11-3/4 surface casing this date. See the casing ticket for the details.
1595267780 2020-7-20 0:00: PW No Violations 0.30
1612864702 2013-11-20 Preliminary Restoration No Violations The well head is being plumbed in. The casing had 1500 psig and the tubing had 1700 psig this morning. The location is back to rough grade.
1751891005 2013-10-10 Drill / Deepen / Reopen No Violations Drilling ahead at 3633 in the Queenston Shale on fluid.
192178530 2013-9-26 0:00: DD No Violations
438191789 2015-3-2 0:00:0 PW No Violations
501665914 2013-10-17 0:00 DD No Violations
626889137 2017-7-11 0:00: PW No Violations
653662566 2013-10-3 0:00: DD No Violations
796018675 2019-11-15 0:00 PW No Violations

For data sources see[9]

References