34-075-25606

Well Details

Well ID: 34-075-25606
Loading map...
Country: United States
State: Ohio
County: Holmes
Municipality: Washington Township
Operator Name: NETHERS GARY L
Well Pad ID:
Farm/Lease Name: MUTCHLER CHARLES E
License Status: Plugged and Abandoned
License Date: 2016-12-15
Spud Date: 2017-03-23
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 40.630000
Longitude: -82.190000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-15 Proposed Formations:BEREA SAND, Issued Date:12/15/2016, Expired Date:12/15/2018 12:00:00 PM, Drilling unit acres:50, Proposed Well Type:OG, Proposed Well Class:EOUT
Plugged/Abandoned 2017-09-27
Record Last Modified 2017-11-08
Construction Permit Expires 2018-12-15

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1512359593 2017-3-23 0:00: DD No Violations
-690346277 2019-5-30 0:00: FR No Violations 1.30
-867070841 2017-3-6 0:00:0 DD No Violations
0169003397 2017-05-19 Drill / Deepen / Reopen No Violations No activity today. The pit is in good condition with freeboard. Plugging of this dry hole will commence when I return from vacation.
0690346277 2019-05-30 Final Restoration No Violations On the day of my inspection I found that the final restoration has not been completed. The site has a small pit that needs to be closed in and a 100-bbl. steel tank needs to be removed.
0867070841 2017-03-06 Drill / Deepen / Reopen No Violations The rig has been moved on the well and rigged up. They have not yet spud the well. There was no activity at the time of the inspection nor were there any problems noted.
1485346096 2017-01-23 Drill / Deepen / Reopen No Violations Moved the rig on and rigged up. They have not yet started drilling.
1490963708 2017-03-29 Drill / Deepen / Reopen No Violations They drove 50 of 10-3/4 drive pipe. Drilling ahead with an 10 bit at 80.
1491912407 2017-04-10 Drill / Deepen / Reopen No Violations At 275 in the 10 hole. Dressing the bit.
1493117629 2017-04-24 Casing String Witnessed No Violations On location to witness the cementing of the 7 surface casing. The rig ran 400 of casing with all the required float equipment. Cemenco Services cemented the casing with 145 sacks of Class A cement. Good cement was returned to the surface but dropped back. They will grout it back to the surface.
1496749796 2017-06-05 Drill / Deepen / Reopen No Violations The pits are okay. The operator is rigging down and moving off location. He will plug the well next week when we can get the cement truck up to the well.
1506597854 2017-09-27 Plug / Plug Back No Violations Bailed the well dry. (20 gallons) Plugged the well wit 7 cubic yards of 9 sack grout. Left grout 4 feet from top of casing. This dry hole was plugged and abandoned on the drilling permit this date.
1512359593 2017-03-23 Drill / Deepen / Reopen No Violations Spud the well this date. Put in a pit liner and picked up drive tools and started driving pipe.
169003397 2017-5-19 0:00: DD No Violations

For data sources see[3]