{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.61,"lon":-81.81,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Salt Creek Township | |
Operator Name: HG ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: FIRMAN MILLER | |
License Status: Final Restoration | |
License Date: 2017-09-13 | |
Spud Date: 2017-11-30 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2018-01-04 | |
Well Total Depth: 6358.00 ft | |
Configuration: Vertical | |
Latitude: 40.610000 | |
Longitude: -81.810000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-09-13 | Proposed Formations:ROSE RUN, Issued Date:9/13/2017, Expired Date:9/13/2019 12:00:00 PM, Drilling unit acres:172.242, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2018-01-04 | DRY HOLE |
Plugged/Abandoned | 2018-01-11 | DRY HOLE |
Completion Report Received | 2018-03-26 | DRY HOLE |
Record Last Modified | 2019-04-05 | DRY HOLE |
Construction Permit Expires | 2019-09-13 | DRY HOLE |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-122513108 | 2017-11-20 0:00 | DD | No Violations | 0.50 |
-1273633070 | 2017-12-15 0:00 | DD | No Violations | |
-148456842 | 2018-1-11 0:00: | PB | No Violations | |
-154423948 | 2018-3-13 0:00: | FR | No Violations | 1.00 |
-2012365269 | 2017-12-5 0:00: | DD | No Violations | 1.20 |
-565714492 | 2018-4-9 0:00:0 | FR | No Violations | 0.50 |
-84128236 | 2018-1-3 0:00:0 | DD | No Violations | 2.50 |
0084128236 | 2018-01-03 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found that the rig crew had finished removing the drill pipe out of the wellbore and that they are logging the well. |
0122513108 | 2017-11-20 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found that the road has been stoned and the top soil has been removed on site. Silt fence has been installed by the run. There was no one working on location today. |
0148456842 | 2018-01-11 | Plug / Plug Back | No Violations | Visited location on 01/11/2018 to witness plugging operations with Inspector Bob Roush. Hagen Well Service and Petroset were on-site to plug the dry hole. |
0154423948 | 2018-03-13 | Final Restoration | No Violations | Upon arrival on location I found the crew solidifying the pits with a calcium and lime mixture, and backfilling. |
0359386435 | 2017-12-13 | Casing String Witnessed | No Violations | I was on location to witness and approve the pressure test of the 11.75 surface casing. Kilbarger Drilling Rig # 5 drilled a 14 borehole to 464 KB. A casing string comprised of ten (10) joints and one pup joint of 11.75, 42 lb. / ft. 8rd, ST&C was ran to 418 and set at 426 KB. After cementing the casing a Green Cement Test was not performed due to lack of a plug container. It was decided, by Randy Akins (ODNR) and Dustin Hendershot ( HG Energy ) that a pressure test be performed on the casing string after an eight (8) hour wait on cement time elapsed. The rig crew connected the soap pump to the casing and raised the pressure, on the casing, to 315 psi and shut in the pressure by closing a valve. The test duration was 30 minutes. Test started at 1343 hrs. @ 315 psi. Inspection of the gauge at ten (10) minutes intervals found the pressure to be as follows: 1353 hrs. @ 300 psi, 1403 hrs. @ 300 psi and at 1413 hrs. the pressure gauge read 300 psi. The pressure decline was within the allowable ( 10% decline ) at ~ 5%. The test was passed and drilling ahead was allowed to proceed. |
0399448313 | 2017-12-19 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew had drilled to a depth of 2468 feet, and has shut down for the holidays. |
0565714492 | 2018-04-09 | Final Restoration | No Violations | On the day of my inspection I was accompanied Inspector Jeff Adams. The final restoration of the well site has not been completed. The pits have been backfilled and the casing has been cut off, and the location has been reclaimed. There is still some top soil that needs to be spread out. The location does not pass final restoration. |
0799491906 | 2017-12-12 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew at a depth of 250 feet and drilling ahead on fluid. |
1273633070 | 2017-12-15 | Drill / Deepen / Reopen | No Violations | Arrived on location on 12/15/2017 to witness a BOP test at the request of NW Region Supervisor Terry Whitehair. Waited for rig to thaw out lines and repair leaks due to extremely cold weather. Pressured the well up to 600# at 10:15AM, and held it for 15 minutes. At 10:30AM, the pressure was noted to be 580#. As the pressure lost was within 5% of the initial pressure, the BOP test passed. |
1510688985 | 2017-11-14 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found that equipment is being moved on location to start construction of location. I have received notice from HG Energy that they were going to start making the location. |
1511983982 | 2017-11-29 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew preparing to concentric drill the conductor casing. 20 feet of 16 inch diameter casing has been installed to this point. |
1512130177 | 2017-11-30 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew lining the rig back with the conductor casing that has already been installed. They continued to drill sand and gravel to the depth of 110 feet. They continued to drill to a depth of 115 feet. The conductor was drill concentric drill 16 inch diameter casing with a 15 inch diameter hammer drill. |
1512675843 | 2017-12-07 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew started digging the drilling pit. The pit is 40 feet wide and 70 feet long and 5 foot deep. The bottom is clay and sand, the side walls are clay. The pit will be lined with a 20 mil plastic liner. |
1513086422 | 2017-12-11 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew to tag the cement top. Drill pipe was run in to a depth of 195 feet and no cement was tagged. It was decided that another cement plug would be set. A 200 sack with 3% calcium chloride. 15 bbl. of gel with cotton seed hauls was pumped followed by cement. The well did circulate and we seen gel returns to surface. They then shut down for 16 hours. |
1513256843 | 2017-12-14 | Drill / Deepen / Reopen | No Violations | Upon arrival, I found the rig crew drilling ahead at a depth of 978 feet. They are planning on drilling another 64 feet putting them at a depth of 1064 feet. The will then run 8 5/8-inch diameter casing into the wellbore. |
1513363184 | 2017-12-15 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew had completed the BOP test and was drilling ahead. They were going to drill out the latch down baffle and shut down for the weekend. |
1514555003 | 2017-12-29 | Production Wells | No Violations | Upon arrival on location I found the rig crew had drilled to a depth of 3933 feet which was below the Clinton sand. There was a little show. They were making a bit trip. I inspected the location and found that the pits looked good. I discovered that the soap tank had run over. Nothing left the location, and clean up can be done when the rig moves off location. |
1514901085 | 2018-01-02 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew drilling ahead at 6146 feet. They are drilling on fluid with mud loggers on location. They should TD sometime today. |
1514985705 | 2018-01-03 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew pulling drill pipe. The well was TD at 6340 feet. Once the drill pipe is removed they will log the wellbore. |
1515070699 | 2018-01-04 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew rigging down and moving off location. The decision has been made to plug and abandon the well. |
1516166960 | 2018-04-24 | Final Restoration | No Violations | On the day of my inspection I found the final restoration complete. I am just waiting on the landowner waiver, to pass the location. |
1519938347 | 2017-12-08 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew has finished digging the pits. The pits have been lined, and safety fence has been placed around the pits. All equipment has been spotted and hooked up. There are no issues on location at this time. |
1520622385 | 2018-03-09 | Final Restoration | No Violations | Arrived on location to sample pit water for chlorides. Using quantabs it was determined the chlorides were above 6000 ppm. All fluids will have to be properly disposed at the proper facility. |
1523274837 | 2018-04-09 | Final Restoration | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
1525348143 | 2018-05-03 | Final Restoration | No Violations | On the day of my inspection, I found that the final restoration has been completed. The site passed final restoration per ORC 1509.072 (B). |
2012365269 | 2017-12-05 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the crew is beginning to move equipment on location. They have not yet begun to dig the pits. |
2080088007 | 2017-11-06 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew rigging up the rig and the cement pit was being dug. Upon completion of the digging I found the pit to be satisfactory. The bottom and the side walls are all clay and is to be lined with a 20 mil liner. |
359386435 | 2017-12-13 0:00 | CS | No Violations | |
399448313 | 2017-12-19 0:00 | DD | No Violations | 1.20 |
799491906 | 2017-12-12 0:00 | DD | No Violations | 1.00 |